(1)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 1

INSTALLATION AND OPERATION OF

TREATMENT PLANT CONVERTING WASTE TO

DIESEL USING CLPD TECHNOLOGY

1. INTRODUCTION

The project involves the treatment of solid organic and inorganic waste into DIESEL. The process is known as “Catalytic Pressure-less Depolymerization” (CLPD) and henceforth will be referred to as CLPD Technology. Since its first inception in Germany, more of this CLPD plants are already in operation in Germany, Italy, USA, Bulgaria, Canada, Spain and Mexico. These plants practically run by itself, as the diesel produced is use as fuel for the plants.

International Consulting Service (ICS), Abu Dhabi, who holds the marketing right

for the technology, provides the opportunity to Treasure Legacy Sdn. Bhd. (TL) to lead the development of CLPD plant. Initially the focus will be in South East Asia, starting with Malaysia. Now we are studying the possibility of introducing this technology to other parts of Asia.

The estimate cost to build and install one plant in operation is RM132 Millions. The first of this plant will be built in Tepoh, Terengganu as the State Government of Terengganu had given a firm support for this project to be done in the state. The state landfill is located is located in Tepoh.

(2)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 2

2. PROJECT BRIEF

The objective of this proposal is to provide a brief and general outline for the implementation of a CLPD Plant, besides giving an in depth understanding of the processes and how the plant works.

The salient points are as follows:

2.1 The CLPD Technology can virtually convert both organic and inorganic waste to diesel.

2.2. The size of the plant varies according to volume of OUTPUTS ranging from 500 liter per hour to 10,000 liter per hour. The size and the number of the plants to be built depend on the volume of waste available to process daily. In the beginning CLPD5000 will be installed. This can be upgraded later should the volume of waste inputs increases.

2.3 TL as the technology holder, will implement, manage and monitor all the development and day-to-day operation of the plants. TL will be responsible to provide the Diesel technology, operating and maintaining the Plants, as well as responsible for the financing exercise. TL as the main partner will be responsible to raise the funds and supervise the financial and accounting aspect of the business.

(3)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 3

3. THE EXISTING WASTE TREATMENT TECHNOLOGIES

Before we go into the CLPD Technology proper, let us examine the various forms of waste treatment technology presently available in the market, namely:

3.1 Landfill

- Very common method of disposing of waste

3.2 Incineration

– Waste to Energy, Energy to Waste

– Converts waste into heat, gas steam and ash

3.3 Recycling Methods

- Items are usually composed of a single type of material making it easy to recycle into new products e.g. plastic, used tire, paper, etc

3.4 Biological Reprocessing - Composting process

- Biological composting and digesting processes to decompose the organic matter, resulting organic material is then recycle as compost and the gas emission is collected and used for generating energy

3.5 Bio-chemical processing

- After biological fermentation, part of the biomasses are diverted by various chemical methods in Ethonal process and Bio-Diesel process

3.6 Energy Recovery

- Chemical methods using Pyrolysis, Gasification and Advanced Plasma Treatment methods

3.7 Avoidance and Reduction Methods

(4)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 4

4. WHAT IS CLPD?

IT MEANS “CATALYTIC PRESSURE-LESS DEPOLYMERIZATION (OILING)

New crystalline catalysts combined with a highly innovative process technology now allow the competitive production of biologically regenerating raw materials!

The future way of economic all production of high quality synthetic Diesel fuel:

 After years of intensive catalyst and process research the breakthrough of reproducing the natural way of fossil oil production within a process duration turned down from hundreds of millions of years to now only 3 (three) minutes has finally becomes a reality.

 This causes the synthetic Diesel fuel produced by this method to be fully competitive.

 With most of the input materials the quality of the synthetic fuel produced by this new ground breaking method is even higher than that of regular Diesel fuel available at gas stations.

 Cost per litre of Diesel produced between USD 0.125 – 0.1375 without Government subsidies.

 Elimination of almost all environmental pollution through inorganic transformation of harmful substances into salts and crystals, based on the ion changing characteristics of our proprietary catalyst.

 For the first time this method now allows active environmental protection as well as optimized energy production from industrial residuals, waste and biologically regenerating raw materials in perfect combination and free of any conflicts.

(5)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 5

5. CLPD TECHNOLOGY IS A TRULY GREEN TECHNOLOGY

Our proposed waste treatment technology is using worldwide patented of de-polymerization process that runs in relatively low temperature range up to 3500C and operates with the inside system pressure in less than 1 atm.

5.1 The main function of CLPD waste treatment plant is to process any type of

organic waste and capable to reduce the size of the waste up to 97% from

the original based volume.

5.2 The side effect from the process is producing high quality renewable

synthetic diesel (not bio-diesel) with CETANE value of 60 as compared to

petroleum diesel with CETANE value of 52, (Super Diesel has CETANE value of 56.

5.3 The synthetic diesel produced from the CLPD plant is different to the

Bio-fuel and B5 diesel. The Bio-fuel is produce from the Crude Palm Oil (CPO) as input based material whereas B5 diesel is the blend of 95% of petroleum diesel and 5% of CPO. On the other hand, our synthetic diesel is produced from the plantation waste such as waste from the palm tree, empty fruit bunches, palm kernel pressed cake and kernel endocarp as input material.

5.4 A CLPD plant with a capacity of producing diesel in the rate of 5000 liter per hour requires three hundred and ten (310) tons of organic waste per day in twenty-two (22) hours of continuous operation. From the waste input, CLPD plant can produces 110,000-liter diesel per day and 3,300,000-liter diesel per month.

6. TYPES OF WASTE

Domestic and municipal waste landfills can receive only certain types of waste, and cannot receive others, due to their potentially harmful effects on the environment and negative impacts on the landfill itself.

(6)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 6

4.1 Types of waste that can be disposed of in these landfills include:

 Domestic waste

 Commercial waste

 Non-scheduled solid industrial waste

 Construction waste

 Waste from drain and river cleansing

 Waste from road cleansing

 Garden and yard waste

 Animal carcasses

 Waste from sludge treatment plants

 Any waste approved by the Department of Environment (DOE)

4.2 Waste types that cannot be disposed of at domestic waste landfills include:

 Biomedical waste

 Radioactive waste

 Asbestos

 Lead acid and other batteries

 Used vehicle oil

 Toxic / scheduled waste

4.3 Waste that can be processed by CLPD Plant by preference:

 Oil Sludge from refinery or oil mills

 Used vehicle and machine oils

 Used Tyres

 Waste from plants – wood, leaves etc

 Plastics

(7)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 7

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 7

WASTE TO DIESEL TREATMENT PLANT

(8)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 8

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 8

WASTE TO DIESEL TREATMENT PLANT

(9)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 9

100% domestic waste in Asia

47% organic 15% paper 14% plastic 4% metal 4% wood 3% textiles 3% glas 1% rubber/leather 9% others (e-waste a.o.)

(10)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 10

7. HOW A CLPD PLANT OPERATES

Basically each CLPD Plant has two main and distinct operations i.e. Preparation of Waste Inputs and the Processing of Waste using the CLPD Technology. Each operation has different works involved depending on the type of waste used as inputs, as follows:

The CLPD Plant is designed as a highly efficient and closely controlled unit able to provide all neccessary supplies to operate the CLPD facillity and consists of:

• Main input bunkers of unsorted waste material • Waste sorting, separation and shredder system • Main fraction storages

• Storages of catalysts and neutraliser • CLPD-Unit

• Tanks for diesel and for water

• Water treatment system for the bunker drainage water • C3i, administration and service &maintenace facillities • Infrastructure

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 10

7. HOW A CLPD PLANT OPERATES

Basically each CLPD Plant has two main and distinct operations i.e. Preparation of Waste Inputs and the Processing of Waste using the CLPD Technology. Each operation has different works involved depending on the type of waste used as inputs, as follows:

The CLPD Plant is designed as a highly efficient and closely controlled unit able to provide all neccessary supplies to operate the CLPD facillity and consists of:

• Main input bunkers of unsorted waste material • Waste sorting, separation and shredder system • Main fraction storages

• Storages of catalysts and neutraliser • CLPD-Unit

• Tanks for diesel and for water

• Water treatment system for the bunker drainage water • C3i, administration and service &maintenace facillities • Infrastructure

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 10

7. HOW A CLPD PLANT OPERATES

Basically each CLPD Plant has two main and distinct operations i.e. Preparation of Waste Inputs and the Processing of Waste using the CLPD Technology. Each operation has different works involved depending on the type of waste used as inputs, as follows:

The CLPD Plant is designed as a highly efficient and closely controlled unit able to provide all neccessary supplies to operate the CLPD facillity and consists of:

• Main input bunkers of unsorted waste material • Waste sorting, separation and shredder system • Main fraction storages

• Storages of catalysts and neutraliser • CLPD-Unit

• Tanks for diesel and for water

• Water treatment system for the bunker drainage water • C3i, administration and service &maintenace facillities • Infrastructure

(11)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 11

7.1 PREPARATION OF WASTE INPUTS i. Household or Domestic Waste

Household or Domestic Waste (sometimes called Municipal Waste) normally are brought by lorries to the plant site. The waste may come in various components, sizes and quantity. As these waste are brought daily, a suitably large area must be allotted from the very beginning to store these unsorted waste.

These waste are then carried by forklifts and deposited on a sorting platform, where workers will sort out the waste according to type e.g. paper, plastics, wood, stones, glass etc.

Sorting Platforms

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 11

7.1 PREPARATION OF WASTE INPUTS i. Household or Domestic Waste

Household or Domestic Waste (sometimes called Municipal Waste) normally are brought by lorries to the plant site. The waste may come in various components, sizes and quantity. As these waste are brought daily, a suitably large area must be allotted from the very beginning to store these unsorted waste.

These waste are then carried by forklifts and deposited on a sorting platform, where workers will sort out the waste according to type e.g. paper, plastics, wood, stones, glass etc.

Sorting Platforms

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 11

7.1 PREPARATION OF WASTE INPUTS i. Household or Domestic Waste

Household or Domestic Waste (sometimes called Municipal Waste) normally are brought by lorries to the plant site. The waste may come in various components, sizes and quantity. As these waste are brought daily, a suitably large area must be allotted from the very beginning to store these unsorted waste.

These waste are then carried by forklifts and deposited on a sorting platform, where workers will sort out the waste according to type e.g. paper, plastics, wood, stones, glass etc.

(12)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 12

Using the sorting platforms, workers will sort the waste manually. They may work in three daily shifts. The number of platforms to be build is based on the volume of waste supplied daily and the consumption per day of the CLPD unit. More or larger CLPD units may have to be installed if the volume of waste to be processed is huge.

Paper waste can be pressed and formed into bales to reduce the water content and for easier storage.

ii. Plants – branches, wood etc

Wood and plant materials have to go into a shredding machine before they are bundled and stored.

iii. Used Tyres

Used tyres are also shredded before they can be treated in the CLPD unit.

iv. Oil Sludge, Used Motor and Machine Oil

Sludge and used oils which are kept in tanks can be sent straight into the CLPD unit for processing.

7.2 THE CLPD PROCESS AND STORAGE

The CLPD Plant is a self-sustaining energy production platform. It only uses up to 10% of its own energy production to run the plant through a 230kw block-type total energy plant (BHKW).

In the plant’s closed-process cycle, the input waste materials are mixed with the catalyst, which initiates a catalytic reaction characterized by the following results:

 Molecular de-polymerization at low temperatures (290 – 350o C) and virtually pressure-free (about 0.1 bar below ambient pressure).

 Hydrocarbon conversion rates not previously achievable of more than 80% without the same magnitude of dangerous residual by-products.

 Decontamination of dangerous residual by-products (halogens, etc) in a liquefied process that yields salt.

 High-quality Diesel Fuel or Jet-Fuel suitable for use in today’s engines, and soon also Gasoline for today’s and tomorrow’s fleet of cars on the road.

(13)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 13

The catalytic process produces certain catalyst crystals (processed metal impurities that originally appear in the input waste materials) that must be removed once the high-quality Diesel fuel has been delivered to the production storage vessel. The technology of the plant guarantees that the metals and metal connections in the residue of the catalytic process (used up catalyst) are merged together and delivered to the plant’s exit waste vessel. The final product Diesel fuel (which develops exclusively over the vapor phase), is absolutely free from these materials.

Since the approved input waste materials are mixed completely into the reaction oil at a temperature of over 300o C and no further separation possibility exists once in the process, no protein molecules (thus no Prions) are present without exiting and reduction to decomposition or into the product, in this case Diesel fuel.

ADVANTAGES

Quality of Product – This plant’s final product is a high quality motor vehicle fuel (Cetane > 56) or fuel oil to be used in less critical uses, and thus has excellent resale value.

Efficiency – The plant’s high efficiency (~80%) gives the entire catalytic process a positive energy balance that is to a large extent emission-free and self-supporting from an energy standpoint.

ADVANTAGES AND BENEFITS OF THE CLPD PLANT

 It uses raw materials that have no cost – waste and thrash

 Eco-friendly – there is no emission of toxic gas from the plant

 Solves the country’s waste disposal problems

 Waste are converted to high quality diesel

 Provide jobs in the country

(14)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 14

CLPD Unit

i. Basic Components of a CLPD Plant WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 14

CLPD Unit

i. Basic Components of a CLPD Plant WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 14

CLPD Unit

(15)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 15

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 15

WASTE TO DIESEL TREATMENT PLANT

(16)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 16

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 16

WASTE TO DIESEL TREATMENT PLANT

(17)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 17

CAPACITIES OF VARIOUS CLPD PLANTS

Size of Plant DAY YEAR

in Waste in Diesel in Diesel in Waste in Diesel in Diesel in Litres/hour Tons Litres Tons Tons Litres Tons

500 31 12,000 10.8 10,881 4,212,000 3,778.2 1,000 62 24,000 21.6 21,762 8,424,000 7,556.3 1,500 93 36,000 32.4 32,643 12,636,000 11,334.5 2,000 124 48,000 43.2 43,524 16,848,000 15,112.7 3,000 186 72,000 64.8 65,286 25,272,000 22,669.0 4,000 248 96,000 86.4 87,048 33,696,000 30,225.3 5,000 310 120,000 108.0 108,810 42,120,000 37,781.6 10,000 620 240,000 216.0 217,620 84,240,000 75,563.3

(18)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 18

8. FINANCIAL

8.1 Utilization of Fund (for 1 CLPD5000 Plant):

USD

Total Development Cost is RM132,000,000.0030,000,000

EXPECTED COST BREAKDOWN:

RM

Plant and Machinery 88,500,000

Land Cost 19,600,000

Motor Vehicles 2,500,000

Import and Sales Taxes 7,500,000

Insurance 4,000,000

Consultants 5,000,000

Lender’s Counsel Fees 5,000,000

Feasibility study 600,000

General Contingency 600,000

Working Capital 1,200,000

TOTAL DEVELOPMENT COST (1 plant) 132,000,000

8.2 Production For One CLPD5000 Plant (Operating Assumptions)

i. Plant Solid Waste Treatment Capacity 310 tons/day ii Plant Diesel Production Capacity 5,000 liters/hour

iii Plant Operational Capacity 95%

iv Net Diesel Production 42,120,000 liters/year

v Plant Load Factor 87%

vi Plant Aux Load Consumption 10%

(19)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 19

8.3 Revenue

Expected Annual Sales of Diesel @ RM 1.98/litre = RM 83.4 million for 1 Plant.

8.4 Other Financial Consideration

i. Payback Period Year 8

ii. Breakeven Period Year 3

iii. IRR 26 %

9. CONCLUSION

Both from the viability and financial aspects, we believe that the Project can be successful. Active participation from the government will ensure that all requirements are taken care of. As such we appreciate if our proposal is given a positive appraisal culminating in full financial and operational support.

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 19

8.3 Revenue

Expected Annual Sales of Diesel @ RM 1.98/litre = RM 83.4 million for 1 Plant.

8.4 Other Financial Consideration

i. Payback Period Year 8

ii. Breakeven Period Year 3

iii. IRR 26 %

9. CONCLUSION

Both from the viability and financial aspects, we believe that the Project can be successful. Active participation from the government will ensure that all requirements are taken care of. As such we appreciate if our proposal is given a positive appraisal culminating in full financial and operational support.

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 19

8.3 Revenue

Expected Annual Sales of Diesel @ RM 1.98/litre = RM 83.4 million for 1 Plant.

8.4 Other Financial Consideration

i. Payback Period Year 8

ii. Breakeven Period Year 3

iii. IRR 26 %

9. CONCLUSION

Both from the viability and financial aspects, we believe that the Project can be successful. Active participation from the government will ensure that all requirements are taken care of. As such we appreciate if our proposal is given a positive appraisal culminating in full financial and operational support.

(20)

WASTE TO DIESEL TREATMENT PLANT

(21)

WASTE TO DIESEL TREATMENT PLANT

(22)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 22

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 22

WASTE TO DIESEL TREATMENT PLANT

(23)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 23

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 23

WASTE TO DIESEL TREATMENT PLANT

(24)

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 24

WASTE TO DIESEL TREATMENT PLANT

Treasure Legacy Sdn. Bhd. Page 24

WASTE TO DIESEL TREATMENT PLANT

(25)

WASTE TO DIESEL TREATMENT PLANT

(26)

WASTE TO DIESEL TREATMENT PLANT

(27)

WASTE TO DIESEL TREATMENT PLANT

(28)

WASTE TO DIESEL TREATMENT PLANT

(29)

WASTE TO DIESEL TREATMENT PLANT

References

Related documents

(1986) MINE-NEC - A Game for the Analysis of Regional Water Policies in Open-Pit Lignite Mining Areas: An Improved Implementation for the NEC PC-8201A.. IIASA

Notably, RA combined with 100 μ g/mL SNPs increased the cell viability significantly compared with the SNPs treatment alone, yielding substantially decreased cytotoxicity

Ainda pode ser definido como um envio direcionado de conteúdo e mensagens não comerciais para uma lista detalhada de receptores, respectivamente, de endereços de e-mail, com isto,

Speech Generating Device (SGD) – A device that speaks aloud messages for communication, previously known as Electronic Communication Device or Voice Output Communication Aid

The Company incurred $28,405 for expenditures on mineral property interests for the six months ended June 30, 2010 compared to $99,626 for expenditures on mineral property

• We $ill be using %icrochip C18 compiler  We $ill be using %icrochip C18 compiler  We $ill be using %icrochip C18 compiler  We $ill be using %icrochip C18 compiler .. +ame

Whilst there are currently no high-level of evidence RCTs to suggest the benefits of acupuncture in bone health, there are several small animal and human trials suggesting

These subjects pertain to current funding methods of terrorists, areas of conflict experience an influx of stolen art, the grey market, the theft of art by specific terrorist