• No results found

The Research on Liquidity Risk Management of China’s Commercial Banks

N/A
N/A
Protected

Academic year: 2020

Share "The Research on Liquidity Risk Management of China’s Commercial Banks"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 2. Results of PP test.
Figure 3. Correlogram of the liquidity gap logarithmic sequence.
Figure 5. Results of the ARMA model.
Figure 8. Results of static forecast.

References

Related documents

First, informed by the BIM (Latané & Darley, 1970), focus groups were conducted with college students to explore their experiences of and perspectives about witnessing peer

Pre-Euro 5 values have increased a little whilst most Euro 5 values have also seen a slight rise, although there are a few models where values have remained stable and, in a

1) SMs, in coordination with the CSIRC and IOs, for systems operated on behalf of the EPA, shall ensure service providers:.. b) Assign specific personnel with responsibilities

In implementing recommended controls to mitigate risk, an organization should consider technical, management, and operational security controls, or a combination of such controls, to

Technology ƒ 60% Automated benefits enrollment ƒ 57% Assessments to determine appropriate career / development track ƒ 54% Automated new employee forms ƒ 46% Automated

The key real friction that allows the model to generate an inertial inflation response and a persistent output response to a policy shock is variable capital utilization.. The

Basic plastic surgical techniques applied to soft tissue defects of the breast from whatever cause: skin grafts, composite grafts, skin flaps (local, regional, distant) and free

18 Section 6302(a) of the Act, which provides for the establishment of a state and local implementation grant program, does not make any reference to Federal users and