21/05/12

21/05/12

D

DA

AN

NN

NY

Y

J

J.Y

.Y.J

.JE

EO

ON

NG

G

K

K..J

J.L

.LIM

IM

D

Daattee DDrraawwnn CChheecckkeedd AApppprroovveedd

Owner :

Owner :

For Information For Information Rev. Rev.

Owner's Engineer :

Owner's Engineer :

AES-VCM

AES-VCM MONG

MONG DUONG

DUONG

POWER COMPANY LIMITED

POWER COMPANY LIMITED

Details of Revision Details of Revision  A

 A

Binh Thuan, Binh Son, Quang Ngai,

Binh Thuan, Binh Son, Quang Ngai,

Vietnam Vietnam T +84 55 5618 900 T +84 55 5618 900 F +84 553 618 950 F +84 553 618 950

P

Prro

ojje

ecct

t

::

P

PC

C

::

T10206

T10206

UAS :

UAS :

QE01

QE01

U

Un

niit

t ::

P

PO

O

Title :

Title :

K

KK

KS

S ::

Z

ZE

EN

N

Reg. No.

Reg. No.

Revision :

Revision :

 A

 A

Drawing No. :

Drawing No. :

Page-No :

Page-No :

T10206-QE01-P0ZEN-040204

T10206-QE01-P0ZEN-040204

T10206-QE01-POZEN__-040204 INSPECTION

T10206-QE01-POZEN__-040204 INSPECTION

 AND TEST PLAN

 AND TEST PLAN FOR

FOR

LIGHTING

LIGHTING & SMALL

& SMALL POWER

POWER INSTALLATION

INSTALLATION

040204

040204

1 of 5

1 of 5

on

on ra

racc or

or ::

MONG DUONG II 2

MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

X 560MW (NET) COAL FIRED POWER PROJECT

oosan

oosan

Heavy

Heavy

Industries

Industries

Vietnam

Vietnam

Dung Quat Economic Zone,

(2)

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

S

:

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong

except for the first or last operation on the basis of each process. AES-VCM Mong Duong

could check the operation, if he is present at the site during the inspection by Doosan.

:

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document

attesting to the satisfactory performance of the related test or inspection for review by

AES-VCM

ITP for Lighting & Small Power

Installation

Page 2

 AES-VCM Mong Duong.

W

:

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to

decide whether they will attend such inspection or not.

H

:

Hold Point / Downstream construction and other activities shall not proceed

without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by

DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

(3)

Doc. No.

Contractor 

 A Sign A Sign A Sign

H W W

H W W

H W W

H W W

H W W

Inspection & Test Plan for Lighting & Small

Power Ínstallation

AES-VCM

T10206-QE01-POZEN-040204 Rev. A

DOOSAN Page 4 of 5

Item Name Oper. No. Inspection Process

Specific Applicable drawing number, Standard Code number,

Specification

Inspection & Test Activities

Verification Document Remarks (Allowable tolerance) Subcontractor DOOSAN AES-VCM

D1 Check Dimensions/sizes according to latest  Approved Drawing

 AFC Drawing

T10206-YQ01-POZEN-141313 Refer to attached Checklist

D3 Check Insulation Resistance Test IEC-61557 Refer to attached Checklist

N/A

D2 Verify Proper fixing of panels on foundation/walls  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A 100 mega-ohms

above D4 Check Alignment and Leveling is proper   AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Refer to attached Checklist N/A E1 Check type of fittings and fixtures  AFC Drawing T10206-YQ01-POZEN-141313

D. Installation & Inspection of Lighting Panel H W W H W W H W W H W W H W W

E2 Ver ify lo cat ions  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Check quantity  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E4 Verify associated components  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E3

Refer to attached Checklist N/A

E5 Verify telecom receptacles  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E5 Check wiring termination  AFC Drawing T10206-YQ01-POZEN-141313

E. Installation & Inspection of Lighting Fitting & Receptacle

(4)

Doc. No.

Contractor 

 A Sign A Sign A Sign

H W W

H W W

H W W

H W W

H W W

Inspection & Test Plan for Lighting & Small

Power Ínstallation

AES-VCM

T10206-QE01-POZEN-040204 Rev. A

DOOSAN Page 4 of 5

Item Name Oper. No. Inspection Process

Specific Applicable drawing number, Standard Code number,

Specification

Inspection & Test Activities

Verification Document Remarks (Allowable tolerance) Subcontractor DOOSAN AES-VCM

D1 Check Dimensions/sizes according to latest  Approved Drawing

 AFC Drawing

T10206-YQ01-POZEN-141313 Refer to attached Checklist

D3 Check Insulation Resistance Test IEC-61557 Refer to attached Checklist

N/A

D2 Verify Proper fixing of panels on foundation/walls  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A 100 mega-ohms

above D4 Check Alignment and Leveling is proper   AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Refer to attached Checklist N/A E1 Check type of fittings and fixtures  AFC Drawing T10206-YQ01-POZEN-141313

D. Installation & Inspection of Lighting Panel H W W H W W H W W H W W H W W H W W H W W H W R

 Abb revi atio n: S: Surveillance R: Report Review W: Witness Inspection H: Hold Inspection

Note : All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

E2 Ver ify lo cat ions  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Check quantity  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E4 Verify associated components  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E3

Refer to attached Checklist N/A

E5 Verify telecom receptacles  AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E5 Check wiring termination  AFC Drawing T10206-YQ01-POZEN-141313

F1 Ensure that the conduits and associated accessories

are available on site. Material Technical Specification Material Technical Specification N/A Refer to attached Checklist N/A  Approved for Construction

Drawing/Specification

F3 Ensure that proper and valid work permit, if

applicable, is available at site for carrying out the job.  Approved PTW Approved PTW N/A E. Installation & Inspection of Lighting Fitting & Receptacle F. Final Documenta tion

F2 Ensure that conduit layout drawing are available at site.

Project

: Lighting & Small Power Installation Work

Ref. No.

Drawing

No.

:

Date

:

Specific Location :

Yes

No

N/A

1

AES-VCM

Inspection Check List

CHECK ITEM

 No

Inspection elements

Verification & Approval Observed Result

/ Remarks

Check the physical condition and intacness of the packing case.

(5)

Project

: Lighting & Small Power Installation Work

Ref. No.

Drawing

No.

:

Date

:

Specific Location :

Yes

No

N/A

1

2

3

AES-VCM

Inspection Check List

CHECK ITEM

 No

Inspection elements

Verification & Approval Observed Result

/ Remarks

Check the physical condition and intacness of the packing case.

Check intactness of instruments / accessesories installed on the

 panels / fittings

Check type and size of the cables/ cable gland/ lugs/ lighting/

wires

4

5

6

7

8

9

10

11

12

DOOSAN Electrical Dept.

 Name & Signature

Name & Signature

Name & Signature

Name & Signature

 Position

Position

Position

Position

 Date

Date

Date

Date

Check for dimensions / sizes and routings according to

Approved Drawing

Check support positions, based on the specifications and

Drawings.

Verify Proper fixing of fittings and accessories

 page 5

Check Expansion joints provision where required 

Check Electrical continuity /bonding complete

Check Alignment and Leveling is proper 

Checked by : (Subcontractor)

DOOSAN QA/QC Dept.

AES-VCM

Verify Dimensions/sizes and routings according to latest

Approved Drawing

Check Insulation resistance for Power cables and wires

Check Proper fixing of cable ties and accessories

References

Related documents

Made an account information about navy federal members using a banking to refer eligible to be overseas at the referred

Pursuant to Rule 704(13) of the Listing Manual, Sim Lian Group Limited (the “Company”) confirms that persons occupying managerial position in the Company or any of its

I understand that PG&E may require an engineering advance to cover some or all of its costs for project review, design work and cost development in connection with this

Much of dealerships in checklist templates, check and dealership will help you are selling a comfortable at dealership to come back of a vehicle checks that.. If a checklist unearths

(15)  To the best of my knowledge and belief, the following person(s) used my information (for example, my name, address, date of birth, existing account, social security number,

Sales/lease Application (continued) The undersigned applicant(s) hereby certify that the above information Is true and correct and understand that, If any information is found

Excess Facilities: If the loads provided by Applicant(s) results in Applicant, the approved contractor or PG&E having installed facilities which are in excess of those needed

This Exchange Agreement and the provision of Exchange Service hereunder shall not modify in any way the rights and obligations of the Parties, including daily balancing, under