AES-VCM
AES-VCM MONG
MONG DUONG
DUONG
POWER COMPANY LIMITED
POWER COMPANY LIMITED
Details of Revision Details of Revision A
A
Binh Thuan, Binh Son, Quang Ngai,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam Vietnam T +84 55 5618 900 T +84 55 5618 900 F +84 553 618 950 F +84 553 618 950
P
Prro
ojje
ecct
t
::
P
PC
C
::
T10206
T10206
UAS :
UAS :
QE01
QE01
U
Un
niit
t ::
P
PO
O
Title :
Title :
K
KK
KS
S ::
Z
ZE
EN
N
Reg. No.
Reg. No.
Revision :
Revision :
A
A
Drawing No. :
Drawing No. :
Page-No :
Page-No :
T10206-QE01-P0ZEN-040204
T10206-QE01-P0ZEN-040204
T10206-QE01-POZEN__-040204 INSPECTION
T10206-QE01-POZEN__-040204 INSPECTION
AND TEST PLAN
AND TEST PLAN FOR
FOR
LIGHTING
LIGHTING & SMALL
& SMALL POWER
POWER INSTALLATION
INSTALLATION
040204
040204
1 of 5
1 of 5
on
on ra
racc or
or ::
MONG DUONG II 2
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
X 560MW (NET) COAL FIRED POWER PROJECT
oosan
oosan
Heavy
Heavy
Industries
Industries
Vietnam
Vietnam
Dung Quat Economic Zone,
This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S
:
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.
R
:
Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document
attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM
ITP for Lighting & Small Power
Installation
Page 2
AES-VCM Mong Duong.
W
:
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.
H
:
Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Doc. No.
Contractor
A Sign A Sign A Sign
H W W
H W W
H W W
H W W
H W W
Inspection & Test Plan for Lighting & Small
Power Ínstallation
AES-VCM
T10206-QE01-POZEN-040204 Rev. A
DOOSAN Page 4 of 5
Item Name Oper. No. Inspection Process
Specific Applicable drawing number, Standard Code number,
Specification
Inspection & Test Activities
Verification Document Remarks (Allowable tolerance) Subcontractor DOOSAN AES-VCM
D1 Check Dimensions/sizes according to latest Approved Drawing
AFC Drawing
T10206-YQ01-POZEN-141313 Refer to attached Checklist
D3 Check Insulation Resistance Test IEC-61557 Refer to attached Checklist
N/A
D2 Verify Proper fixing of panels on foundation/walls AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A 100 mega-ohms
above D4 Check Alignment and Leveling is proper AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Refer to attached Checklist N/A E1 Check type of fittings and fixtures AFC Drawing T10206-YQ01-POZEN-141313
D. Installation & Inspection of Lighting Panel H W W H W W H W W H W W H W W
E2 Ver ify lo cat ions AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Check quantity AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E4 Verify associated components AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E3
Refer to attached Checklist N/A
E5 Verify telecom receptacles AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E5 Check wiring termination AFC Drawing T10206-YQ01-POZEN-141313
E. Installation & Inspection of Lighting Fitting & Receptacle
Doc. No.
Contractor
A Sign A Sign A Sign
H W W
H W W
H W W
H W W
H W W
Inspection & Test Plan for Lighting & Small
Power Ínstallation
AES-VCM
T10206-QE01-POZEN-040204 Rev. A
DOOSAN Page 4 of 5
Item Name Oper. No. Inspection Process
Specific Applicable drawing number, Standard Code number,
Specification
Inspection & Test Activities
Verification Document Remarks (Allowable tolerance) Subcontractor DOOSAN AES-VCM
D1 Check Dimensions/sizes according to latest Approved Drawing
AFC Drawing
T10206-YQ01-POZEN-141313 Refer to attached Checklist
D3 Check Insulation Resistance Test IEC-61557 Refer to attached Checklist
N/A
D2 Verify Proper fixing of panels on foundation/walls AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A 100 mega-ohms
above D4 Check Alignment and Leveling is proper AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Refer to attached Checklist N/A E1 Check type of fittings and fixtures AFC Drawing T10206-YQ01-POZEN-141313
D. Installation & Inspection of Lighting Panel H W W H W W H W W H W W H W W H W W H W W H W R
Abb revi atio n: S: Surveillance R: Report Review W: Witness Inspection H: Hold Inspection
Note : All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
E2 Ver ify lo cat ions AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A Check quantity AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E4 Verify associated components AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E3
Refer to attached Checklist N/A
E5 Verify telecom receptacles AFC Drawing T10206-YQ01-POZEN-141313 Refer to attached Checklist N/A E5 Check wiring termination AFC Drawing T10206-YQ01-POZEN-141313
F1 Ensure that the conduits and associated accessories
are available on site. Material Technical Specification Material Technical Specification N/A Refer to attached Checklist N/A Approved for Construction
Drawing/Specification
F3 Ensure that proper and valid work permit, if
applicable, is available at site for carrying out the job. Approved PTW Approved PTW N/A E. Installation & Inspection of Lighting Fitting & Receptacle F. Final Documenta tion
F2 Ensure that conduit layout drawing are available at site.