JUSTIFICA TION BUSINESSCASE
Project Name
SOFTWARE, VENDOR, AND SOLUTION INTEGRA TOR DESCRIPTION
SAP is one of the world's leading application software providers, employing approximately 22 000
people in more than 50 countries. Founded in 1976, its products now support over 700 utilties
world-wide. The SAP Utilties Solution now bils over 20 milion contracts globally with license commitments
that wil grow this number to just under 130 milion. The SAP Utilities Solution, developed from its
inception to be packaged software, brings BC Hydro advantages in terms of durabilty, continual investment and performance.
The SAP Utilities Solution is:
Configurable to provide the necessary business process flexibility Offered in upgradeable releases
Supported by SAP with multiple layers of on-call resources
Innovative and continuously improving because of SAP' s considerable emphasis on R&D In 1999 SAP invested more than C$ 1 Bilion in research and product development. Each utility using the SAP Utilities Solution has a voice in future developments through user group
participation. BC Hydro wil benefit from the requests made by all Customer Care and Service (CCS) clients in addition to driving our specific enhancement preferences.
SAP has made a strong commitment to the global utility industry and has actively provided industry
specific solutions for utilities since the late 1980's. The SAP vision for the Utilty Industry is to support
the international utilty industry with best-in-class solutions designed to provide the competitive
advantages required to succeed in today s challenging market environment. Utilties have to be nimble to
respond to a rapidly changing market and require flexible solutions that support evolving business needs.
SAP has met the challenges of a changing industry through the development of SAP's Utilties Solution.
Specifically the CCS solution has a strong track record with the references checked: GPU and New
Brunswick Power. Both of these utilities are currently in the process of upgrading to a new
softare
release.
For SAP CCS implementations, our references gave a very positive endorsement of SAP. More specifically, SAP was rated very highly in the following areas:
Softare
Configurability/Flexibility Software ScalabilitySoftware Functionality
SAP Responsiveness/Problem Resolution
For functionality and configurability we conducted very in-depth and intensive seven-day workshops/labs
BC
hydro II
CAR
JUSTIFICA TION BUSINESSCASE
Project Name
In terms of the client base that SAP serves, we found a close fit with the scale and composition ofBC
Hydro (I.6M electric customers). We found that SAP met requirements of this size/scope better than other CIS respondents did. For example some ASPs or other vendors have less experience with this size and scope. More specifically the reference sites of GPU (2M+ customers) and Energy Australia (1. customers) matched the critical scale requirements ofBC Hydro. Additionally, SAP has the strongest user group of the CIS vendors who responded to our RFP. The user community meets once each year to prioritize the list of enhancements. The enhancements are requested by the industry and SAP then focuses their efforts around priorities developed e user community.
At the time of response to the proposal, SAP indicated the following facts: 580 installations world-wide, serving over 700 Utilties
102 Utility installations in North America
150 Utilities companies using the current SAP Utilty Solution
North American customers productive with the SAP Utilties Customer Care and Service solution include:
o NB Power (New Brunswick) Canadian Niagara Power (Ontario)
Sacramento Municipal Utility District (California)
o GPU
, Inc. (Pennsylvania)o OGE Energy Corp. (Oklahoma) Reliant Energy Inc. (Texas)
Imperial Irrigation District (California)
Metropolitan District Commission of Hartford (Connecticut)
In terms of the combined Accenture (solution integrator) and SAP (vendor) team selected there are a number of factors about this allance that are important to BC Hydro.
The combination of Accenture and SAP have been involved in 22 CCS projects since 1998 with 10 major implementations that are live in production
There has been joint Accenture/SAP product development at SAP's head offce in Walldorf
Germany. Current areas of focus are CRM, Meter Data Management, and Deregulation. Accenture is a preferred implementation partner for R/3 and CCS solutions
Accenture and SAP form local alliances ensuring strong delivery expertise
Three proposals to provide solution integrator services of the SAP product were reviewed. Accenture was selected for the following reasons:
Accenture provided an overall lower cost solution than the second place finalist (Omnilogic/PWC)
Accenture provided the most recent implementation experience with the CCS solution including, the successful implementation of CCS in a very similar utility to BC Hydro (Energy Australia Crown Corporation, electric only implementation, 1.3 M customers)
BC
hydro II
CAR
JUSTIFICA TION BUSINESSCASE
Project Name
Accenture provided a stronger and more experienced implementation team
FUNCTIONALITY DESCRIPTION
The SAP Utilities Solution provides mission-critical functionality to support customer facing and back
offce activities. A later section in this business case more specifically outlines the scope of the first
phase. A number of the following capabilties wil be mission critical to BC Hydro as we continue to
develop our customer service capabilty.
Customer Interaction and Care -
provides a powerful and flexible workplace for the CustomerService Representative, incorporating a search engine, contact management, and integration to inbound/outbound CTI/IVR technology.
Revenue Management - supports activities related to financial dealings with customers. This
includes recording revenue and receivables, administering creditworthiness, managing security
deposits, processing payments, dunning activities, and write-off of bad debts.
Biling and Invoicing - provides key advantages in the area of biling and invoicing. It supports flexible business rule-based usage calculations, rates and pricing, as well as a variety of charge calculations. All types of utility services are supported (with some set-up and configuration). In addition, rate structures ranging from bundled through unbundled to multi-company, and
non-energy goods and services can be accommodated.
Device Management - supports requirements related to the acquisition and life-cycle
management of measuring related equipment. Device Management supports meter reading, meter installation and inspection/certifications of the meters.
Service Order Management - covers scenarios to initiate, manage and complete customer-facing fieldwork.
Workflow Routing - at sign on users are presented with a specific list of scenarios (comprised of processes and workflows configured to accomplish specific business events) based on their role(s) within the organization.
Operational CRM -
business processes include many of the traditional high-volume batchactivities (e.g. meter reading upload and download, bil calculation, invoicing, payment lot
processing, etc.
Business-to-Consumer Internet Self-Service - the solution supports self-enrolment, changing
personal data, viewing account and consumption information, move- , move-out, meter reading
entry, invoice presentment, and electronic bill payment.
Energy Data Management - acts as a repository for the utilty to store interval- based metering and load profiling data.
Automated Communication Protocols for the Deregulated Market - provides an inter-company data exchange, which acts as a communication engine between service providers working in a deregulated environment.
BC
hydro II
CAR
JUSTIFICA TION BUSINESS CASEProject Name
FUNCTIONAL FIT DESCRIPTION
The solution selected provides us with customer care functionality that is both deep and broad. The SAP
Utilties Customer Care and Service System (CCS Release 4.63) is a product that is proven in the
industry, providing full functionality and built using up-to-date technology.
Our Request for Proposal phase received twenty responses with a good mix of very strong proposals covering various scenarios: In-house product implementation, out-source/application service provider and partnership proposals. A short list of potential solutions was developed, followed by extensive
reviews of products against our functional, technical, and vendor requirements.
An extensive list of functional requirements was used in the evaluation of products. Vendor product features were verified against the functional checklist. The SAP product scored a total fit of94%; the highest fit percentage of reviewed products (see Appendix G for the final evaluation summary). For each of the major areas , the functional fit of the SAP product to BC Hydro requirements was as follows:
Account Management 98%
Biling
98%Credit & Collections 96%
Customer Choice 92%
Customer Management 98%
Customer Service 86%
Financials 90%
Inventory (e. g. meters) 99%
Portfolio Management 95% Rates Management 93% Service Address 92% Service Orders 93% System Mechanics 91% Usage Management 97%
It was clear that the SAP product emerged as the winner in terms of match with our requirements.
TECHNOLOGY DESCRIPTION
The following principles guided the selection of technology:
Provide a cost effective computing environment that meets known business and performance requirements , yet is scaleable to support growth in customers, products and services
Ensure proven robustness and suitability of the platform chosen Comply with our corporate IT standards
The technical platform that SAP is built on fits our GTA (Goal Technology Architecture) and received the highest rating in our evaluation of technology when compared to other respondents.
SAP's track record in the technology arena is very good. Currently their systems have moved away from
proprietary to open systems technology and they have implemented a constant upgrade path to newer
BChydro II
CAR
JUSTIFICA TION BUSINESSCASE
Project Name
the average of once every twelve months. On average, CIS installations upgrade to the next release of the
CCS softare once
every twenty-four months. Minor enhancements are released automatically everyquarter and companies are free to apply or make use of them as needed.
The SAP product is built on a proven three-tier client/server architecture comprised of 1) a presentation layer, 2) an application/business logic layer, and 3) a database layer. To ensure our solution wil have the best possible fit with our existing technology and future technical directions, the configuration wil be fully compliant with our IT standards.
Three distinct architectures wil be developed and rolled out at appropriate stages of the project:
A development architecture wil provide the infrastructure, tools, standards and procedures
required to configure and test the solution and convert historic data
Execution architecture wil provide hardware, operating softare, maintenance, and training
environments necessary to support production services.
An operations architecture wil provide application support tools, skils, procedures and
service management tools to ensure the required degree of service availability and responsiveness
The new CIS wil be established on a UNIX/RDBMS platform. This approach will provide multiple benefits to BC Hydro, including:
Flexibilty and scalabilty of the distributed architecture Easy integration with Internet service elements
Fit with our corporate IT direction moving to a fully distributed computing environment Support the corporate direction to move away from the BC Hydro mainframe
Appendix G: Northstar Operating Assumptions
General
. BC
Hydro wil continue to operate
its own Customer Information and Biling systemuntil the new Northstar CIS is implemented.
The new Northstar CIS wil be required to
bil for electric consumption and othernon-commodity products for electric customers only.
The new Northstar CIS wil be designed to support a variety of business structures
but wil initially be
implemented to support the current BC Hydro business structure.The CIS solution wil be based on SAP CCS version 4. 64 and there are no plans to upgrade the version during the Implementation Phase.
The new Northstar CIS wil be implemented as close to the "
vanila
" (i.e., asdelivered) SAP CCS v4.64 product as possible.
Cutover, or go live, is assumed to occur in late December 2003.
Business requirements wil continue to evolve during this project. However all
changes, once project scope and budget are approved in Blueprint Confirmation
(August 31 2002), will be funded outside this Business Case.
Moved to out of scope.The Field Service Order System (FSOS) wil be
decommissioned prior to, or at the same time
, as the current CIS. Functionality
supported by FSOS wil be provided mainly by the new "
Portal" system with somefunctionality being provided by the new Northstar CIS. Specific details
wil beworked out and system requirements defined during the design phases of both projects.
The project budget includes provision for back-fill of full or part-time resources for project staff only.
The project wil pay for project -related training (e.
, SAP ABAP training) for BCHydro only. Accenture, Westech and NCS are responsible for the costs associated
with their team members.
For the full-time BC Hydro resources
, Northstar wil pay for salary increases
, '
days, annual vacation and benefits.
The development Service Level Agreements (SLA) between Customer Services operator of the Northstar SAP solution, and any third part wil be developed and
managed by business representatives outside the project jurisdiction.
Scalability of the SAP CCS infrastructure ensures that the technology solution wil be
able to support BC Hydro s core customer service business well into the foreseeable
future. The selected infrastructure wil not restrict the
support of a multi-company ormulti-service configuration. The current infrastructure sizing takes into account the
current BC Hydro s business requirements.
CIS Decommissioning - the legacy CIS wil be decommissioned to the point of
in RO mode for up to a year after SAP CCS goes live. When the legacy system is no
longer needed
, the business unit wil have to plan for the decommissioning of the
system completely as a separate project.
FSO must be decommissioned with the initial implementation of SAP, as the system
cannot exist without the legacy CIS. Service order scheduling, dispatching, permit
management and contract management functionality, currently performed in FSO,
wil be supported by the Passport Portal project (scheduled to go live in Q2 2003).
SAP CCS wil support issuance and completion of customer-
facing service orderswhich is reflective of industry best practices. This change is under negotiations between the two projects and any changes to Northstar interface requirements or functional requirements wil be approved via the change request process.
Current project locations include Edmonds OC2-209, OC2-213, OC2-214, OC2-219. Mobilization of the project to a different location is out of scope.
Proposed changes to existing or new systems that are not currently in production and
would impact the new Northstar CIS wil be agreed between both projects in advance.
Costs for these activities are out of scope and wil be handled via
the Northstar
Change Control process
Process
The new N orthstar CIS Process Model assumes only existing CIS processes wil be
addressed in the first release, i.
, the current scope ofthis project.
Processes that could be used in the future have been identified and marked as 'Future, and wil be
addressed in future releases.
The new Northstar CIS Process Model only addresses those processes that in some
way require direct interaction with the CIS system. Processes and steps that are
performed from other systems have not been included and are assumed out of scope.
Any changes to the complexity ofthe business processes or the addition of newly
identified business processes wil be handled through the Change Control process.
Dollar estimation wil not be used
, rather a reading estimation (standard SAP)wil
occur.
Existing low volume manual processes wil remain manual processes in SAP.
A non-energy invoice is not required from the new Northstar CIS in the current release, as all non-standard specific charges wil be handled and invoiced through
PeopleSoft ( note this may change if a change request is raised in the next phase).
PeopleSoft wil be responsible for the biling
of non-energy charges not currentlyhandled by CIS.
Standard non-energy charges currently
biled in CIS wil
continue to be biled in the
new Northstar CIS system.
BCC and BCQ systems representing the payment funnel wil not be replaced.
Technology & Infrastructure
NCS operators will join the project without backfill and continue to charge their home cost center.
The new Northstar CIS wil re-use the
mainframe printing capabilities currentlyprovided, e. , CSF, printers, etc.
Data Archiving - Northstar
wil ensure backup and restore of the entire system, andwil provide procedures to purge high-volume non-essential data (e.
g. data that wil
not compromise any reporting or on-line query capability from the system (help manage disk storage usage). Full data archiving and retrieval capability however is outside Northstar s scope.
The technology team is not responsible for the support of the EAI infrastructure. It is
assumed that the OCIO wil play this key role.
Bil Format and Print
- The present system for bill format and print on the mainframewill be used. The high-speed printers and any other hardware or
softare requiredfor bil printing after the generation of the flat file in SAP is out of scope.
The project wil not provide the additional
hardware and/or infrastructure equipmentnecessary to implement a site failure recovery strategy.
The Technology Strategyaddresses the back-up and recovery facilities.
Network traffic estimates have confirmed that BC Hydro s existing LAN and WAN infrastructure is sufficient to handle the incremental data communication caused by
SAP CCS. Upgrade or changes in the network infrastructure wil be handled through
the project change request process and draw on contingency if necessary. If the
infrastructure proves to be insuffcient for CCS , Northstar wil assess the upgrade
requirements and escallate if necessary for approval via the Change Request process to be funded by the project contingency.
Developments, including Interfaces
Changes in business requirements within in-scope developments that are identified
after the blueprint phase are considered out-of-scope. These changes must flow
through the change control process to assess impacts to the development and other teams. Any existing interface or other entity which the team missed during Blueprint and Blueprint Confirmation
, will be assessed by the project team and escalated if
necessary for approval via the Change Request process to be funded by the project contingency.
Unless otherwise indicated(e.g. EAI), all interfaces are assumed to operate in the
same manner as today, including fie formats
, platforms, and communicationprotocols.
SeeBeyond, BC Hydro s corporate Enterprise Application Integration (EAI) tool
, wil
be used for a subset ofthe Northstar SAP CCS interfaces. Specific criteria wil be
developed and jointly agreed with the BC Hydro Common Interface team. Northstar will be able to leverage the experience, tools, and common EAI
and hardware/software environment and support resources. These tools and resources
wil be provided at no
cost to Northstar.Field service orders wil be created in SAP but dispatching and costing
wil occur inother systems, e.
g., WMS/Passport. A combination of manual and automated
interfaces wil exist between the new Northstar
CIS and WMS/Passport.The new Northstar CIS will contain all devices in inventory (via interface from EMRS), but EMRS will continue to be the system of record (i. , responsible) for the maintenance of the inventory, procurement, retirement, certification, etc. of all devices.
Atlas wil continue to handle all external credit issues, e. , interaction with collection
agencies.
BC Hydro wil utilize the complaint
management functionality in SAP and eliminatethe current complaint management system.
CCS will interface with the ARCs and MRMS solution that was implemented in mid 2002.
SYMCOR wil continue to handle the processing of
payments.EIGEN will continue to process Credit Cards and pre-authorized payments.
Outages wil be reported through
the new Northstar CIS, but the outage managementfunctionality (e. , network location, problem identification
, resource management of
skils and equipment, dispatching, etc.) wil remain within
PowerOn.Power On Trouble calls for all areas wil now be all processed through PowerOn.
Technical Development
All user id' , authorizations and developer keys
wil be created for
the technicaldevelopment team. The technology team wil inform the
development team oftheapplication of any OSS notes, upgrades and hot packs.
The developments are dependent upon the configuration and customizing of their
associated processes and sub-processes. The development schedule wil be structured
to account for configuration dependencies.
The SAP CCS interface development is dependent upon the completion of any required code changes/modifications to the connecting 3rd party systems. The
Northstar development team wil work closely with the 3rd
part developers to defineand document all required modifications to the 3rd part systems.
The SAP CCS interface development is dependent upon the creation and connectivity
to the SeeBeyond EAI infrastructure. The development team is assuming that the
EAI infrastructure and all required SAP connectors are set up prior to the
implementation. The CCS Northstar Project
wil ensure that
all outstanding SAP 'Hot Packs' and AOP (Add On Patches) will be applied to the solution (up to theintegration test freeze date).
Several of our sponsors have changed since December 200
1. We expect to receive
full support from our new sponsors throughout the life of the project
No significant organization design/consolidation is in scope for this project. The
organizational alignment activities are limited to role/responsibility alignment and sizing the number of positions required in specific functional areas
No changes to reporting relationships or management processes are included in the scope of the project
A limited number of jobs outside of Customer Services wil be impacted. We have
assumed that these jobs
wil be expected to use CCS, but that there wil not be a shift
in responsibility
Direct customer communication wil be handled by the current group/individuals
External communication requests wil be handled by the Corporate Communications
Business Policy changes wil be developed by the business
and coordinated by theBusiness Integration Team
Learning
There is no apparent or well-defined overall learning or training strategy in Customer
Services. If a strategy is defined during the project, the Learning team wil strive to
align to the overall strategy as much as possible without severely affecting project timelines, resourcing, and deliverables.
The learning and performance support effort
wil be complimented by the delivery of
effective communication, the change network, and sponsorship by the Business Integration Team and Customer Services Management Team.Users have the necessary prerequisite skills and knowledge (computer orientation
non-
CIS application skils
, and BC Hydro knowledge) to perform their current jobsand wil not be trained in these areas during CCS Learning. This includes BC Hydro
policies and procedures and computer applications, such as Microsoft Office and Email.
Northstar wil develop Learning materials
to transition users from the existing CIS toCCS
, this wil incorporate information on process and system changes. While
re-usability wil be a key objective the
materials. The Northstar materials wil be inputsto the 6 week induction training, however they wil not be designed for new
employees and wil not replace the current 6-week
induction training.Any staff who is newly recruited to related business areas will receive the necessary training and coaching in their new roles prior to receiving CCS training.
Temporary and/or retired employees wil backfill Customer Services up to the Go
Live datewhile employees are trained. Backfill
, temporary, and retired employeesmay need to be trained in the current CIS system. The project has budgeted for 30
resourcesfor 4 months at a group 6 level.
CSMT members (or representatives from the business) wil be responsible for the
new forms within their business unit. These changes will be incorporated into the performance support tool and learning activities if received prior to the Learning Pilot.
Existing Call Centre training facilities in Edmonds, Vernon, Prince George, and
Nanaimo wil be used to deliver learning. Additional facilties and equipment wil be
required to deliver learning prior to go-
live. Participants from other locations (e.
CCS offices, meter readers, etc.) wil travel to the closest training facility in order to
receive training.
Maximum capacity of existing Call Centre training rooms are 16 users per course at Edmonds and 8 users per course at Vernon, Prince George, and Nanaimo respectively
(due to infrastructure and room capabilties).
Learning wil be conducted during normal
working hours. Any negotiations
regarding overtime will be the responsibility ofthe business and
wil be agreed uponin advance.
The business wil fully sponsor learning
activities and integrate learning requirementsinto individuals ' work schedules as required.
The Learning team wil work with the Technology team to define User Profies. The
Technology team wil be responsible for the
creation and maintenance of UserProfies.
Learning Delivery will require a large number of resources to deliver training in
multiple locations and multiple business units. Suitable business resources wil be
seconded to deliver classroom training. This
wil help to
create skilled users withinthe business.
Following go-live the responsibility for all Learning and performance support
activities will be formally handed over to the responsible business units; this includes the delivery of all Refresher training.
BC
hydro
Appendix H
Organizational Impact
BC
hydro II
CAR
JUSTIFICA TION BUSINESSCASE
Project Name
1.
ORGANIZATIONAL IMPACT
INTRODUCTIONThe Change Management portion of the SAP CIS project wil form an integral part of the overall
solution. As such, it takes a holistic approach to the organizational impact arising from the
implementation of a new system and new business processes in an established environment. The Change Management portion wil include the following five segments:
1.
Organizational Change: this includes an organizational impact assessment, which analysesthe business change events. These are defined as planned actions resulting in a change to the way Customer Services and other Business Units perform their business. The other aspect covered in this area is organizational alignment, which ensures that jobs are aligned with the environment so that people are working on the right things, the right way.
2. Communication and Involvement Strategy: the strategy seeks to generate three types of
communication: awareness, involvement and education activities. Awareness activities
wil
assist in convincing employees of the need for this project by explaining the business rationale and benefits of the proposed efforts. Involvement activities wil encourage leadersand employees alike to take ownership of the change. And finally, education activities
wil
facilitate the implementation of change, when formal training is not required.
3.
Sponsorship: this is a key element to the successful conclusion of the SAP CIS project, aschange will not create sustainable business benefits over time without effective sponsorship. Sponsorship and leadership activities are planned to support employees as they transition to a
new way of doing business, using SAP.
4.
Training: please see following page for details.5.
Transition Plan: this involves the planning of employee activities during the transition to thenew CIS solution.
INTERNAL IMPACT
There wil be a significant impact to Customer Services staff(Call Centres, Biling, Credit and
Collections and Community Customer Services). Other internal stakeholders wil include Marketing and Sales, and Transmission and Distributions ' Customer Projects and Installations group.
The change management and training stream of the project wil manage change issues concerning employees and their duties.
EXTERNAL IMPACT
The major external stakeholders identified by the project teams are BC Hydro s customers. The Offce and Professional Employees International Union (OPEIU) is also a key stakeholder.
As a project principle, customer impact will be constrained to a minimum. Customer impact wil be assessed and the right mechanism to communicate with the customer wil be employed.
BChydro II
CAR
JUSTIFICA TION BUSINESSCASE
Project Name
Partnering with the union throughout the project wil be critical to the success of the project and in implementing organizational changes. Involvement wil likely be concentrated in the Organizational Alignment, Organizational Impact, and Core Solution work. The union wil be involved at the earliest possible time in order to reduce the impacts of the project and wil be invited to self-select the level and frequency of their involvement.
Overall, the project does not expect a major impact to external stakeholders.
TRAINING REQUIREMENTS
Customer Services within BC Hydro puts an emphasis on learning. The training strategy strives to
enhance learning by building on current training methods and evolving them into a goal-based learning
environment. This wil allow traditional classroom instructors to become coaches who teach users the business context in which SAP transactions wil be performed and the tools available to support them. This shift in training wil promote learning as a continuous process.
Training wil be provided to primary, secondary, and casual users based upon their need and usage of
CIS. Training wil take on a holistic approach where educating users wil encompass teaching users the
new application, the business processes, and the business context in which the system wil be used. Users
will be trained using various methods in order to achieve the goal of ' speed to proficiency ' where they will be able to perform independently minimising the time required away from their jobs.
SUPPORT REQUIREMENTS
Existing support structure/staff for Training, the Help Desk, CIS Systems, and Computer Operations wil be re-trained and utilsed for the project.
To further support users, a central repository for documentation wil be built for Customer Services. This repository wil provide the first "port of call" for information relating to business processes, policies procedures , application help, and relevant information from other business areas, such as Marketing &
Sales, which Customer Services needs to run their business. During the training process, users wil
practice using SAP and the performance support tools at their own pace while coaches are in the room assisting users on a one-on-one basis. This setting promotes end users to be actively involved in their own learning process.
Appendix I
Summary of Risks and Mitigation Strategies
Risk Mitigation
Resources:
The project wil demand very significant Westech is keenly aware of the
participation ITom the SBUs (especially Customer requirements and have committed to meet
Services), Westech, the solution integrator and the resource requirements and time lines. They
softare vendor. This is of some concern, as three are in the process of hiring the necessar
other projects (Joint Meter Reading, MRMS and resources.
BC Gas Conversion) wil be occurring during the CIS implementation.
SBU resources and especially subject SBU projects are being prioritized to ITee
matter experts are completely committed up experts to work on the project.
on present initiatives. Additionally, the project budget provides
for back-filling many of these resources
(see assumptions).
Solution Integrator and Softare Vendor Key vendor and solution integrator
resources are often inexperienced. candidates wil be interviewed at the
discretion ofBC Hydro
It can be difficult to ensure quality when The selection of people who have the
business decisions are delayed appropriate expertise and ensuring that they are empowered to make business
decisions
Interfaces:
Some interfaces may be complex and Westech currently supports interfacing
support for the interfacing system may be systems. Westech wil be involved in
less than optimal. For example, the mobile writing the interfaces and they have
dispatch system (MDS) is rather complex extensive experience building interfaces to
and becomes more so due to the fact that it the existing CIS. Westech is an integral
is being re-defined. part ofthe CIS project plan and wil have
about 25 people on the project.
Changes in the new CIS may affect a
The BluePrinting wil investigate all significant change in programming logic
possible changes and develop a migration and business processes in the interfacing
and implementation plan.
systems.
Change Management:
New CIS system wil necessarily change The project plan recognizes this significant
many business processes and provide a risk and has allocated 17% ofthe budget
completely new user interface. Many on Change Management.
employees working with the CIS may have
diffculty adapting.
The CIS project wil have a team with a
Significant changes always affect defined budget and plan to proactively
employee morale. manage the change. Strong sponsorship
and ITont line management support wil ensure the success
Some long-term employees are not very It wil be a pre-requisite for the user
PC literate and new CIS user-interfaces community to have mid-range PC skils.
demand significant PC skils.
Risk Mitigation
Most CIS implementations have to work Confirm and Approve assessed the quality
with decades old data in the legacy system. of the data and allowed for data related
Often the data is inconsistent (some fields issues in the project plan. Some data wil
are missing or used for multiple purposes), have to be cleansed and converted
which can adversely impact the data programmatically using data cleansing and
conversion effort. conversion tools provided by the vendors and elements requiring manual intervention wil be converted by Customer Services employees starting immediately after the
BluePrinting phase. Scope Control:
Given the length of the project, there is the Implement a thorough change request process; any
potential for scope changes to arise. potential changes to scope wil be brought forward,
documented and put through a decision-making process to determine its necessity and source of
funding.
Soft and hard cut-off dates for the change request process wil ensure that scope changes wil take place only within an agreed-upon framework.
Time Line:
The project plan shows a time line of 19 The project timeline has been compressed
months for the blue print, build and to a "most realistic" time ITame. Given the
implementation, and another 3 months for all-consuming nature of the CIS
post go live support. In this time business implementation on the business units, the
priorities can change, customer business priorities wil be focused on CIS
expectations can shift and employee and and the project has the full support ofthe
project team member enthusiasm and Customer Services management team.
support can diminish.
Customer expectations are not expected to
shift significantly in this time ITame.
New System:
The new system introduces new softare All technology introduced by the new
and operating procedures in BC Hydro. system fits the Corporate GT A guidelines.
The skils required to operate the new
Resources needed to implement the system
system are different ITom those currently
required. are being confirmed. BC Hydro wil be
provided with the necessary training as well as knowledge and skil transfer on the
job. This wil be critical given the learning
curve that wil be associated with the new
SAP CCS system.
Data volume wil be spread across the
CIS systems create significant data growth appropriate number of disc units to ensureresponse and mirror all production data to
which can pose a risk for system integrity ensure integrity. A later project should be
and response. undertaken to develop data archiving
Project Management:
Sponsorship is detached and employees do Sponsorship forms a key piece ofthe
not pay attention. Change Management strategy.
Capacity for Business Change - there are CIS wil be phased in to mitigate this risk;
Risk Mitigation
concurrently (MRMS and BC Gas also replacing only core functionality.
Conversion), which increases the amount of change the business must absorb in a given time and may cause inefficiencies for the implementation of CIS or delay CIS
roll-out which means increased cost, the
longer the delay
Confirm and Approve conducted a
The budget may be at risk if project scope significant analysis to explicitly define
is not controlled or well-defined scope; project budget and therefore
timeline and resources are developed based
Vendor project management may not be on this definition.
experienced posing undue risks. There wil be a project management offce with experienced representation ITom BC
Hydro, Westech, the Solution Integrator
and the Vendor.
Vendor candidates have been interviewed and the relevant candidates have been specified in the contract.
The Project wil adhere to established project management methodology, and wil report to Project Directors and the
executive Steering Committee.
Conversion:
The "downtime" wil be minimized by
There wil be a very short period of time in
planning Go Live over Easter 2003 and which neither CIS nor SAP CIS will be
ensuring that high volume and high impact available to users during the conversion
business processes are either completed in
process. This "downtime" could adversely
advance or delayed as appropriate.
affect customer service and biling
Very detailed cutover planning (to the hour
operations.
each day) wil mitigate this risk.
The conversion process wil be performed There is a risk that data may not be
for the entire customer base. Several mock
converted accurately and on a timely basis.
conversions wil be done to verifY all
Biling and other data related errors could
aspects of conversion before going live occur post-implementation with an adverse
with the new system. A separate data impact on the business.
verification effort wil review converted data for accuracy and completeness.
Post Go Live Support: A system of expert users and power users
wil be in place at go live to support all
Service levels in call centres and biling
online users. This intensive system of operations wil be impacted immediately
support wil be in place for the first two
after go-live because the system wil be
weeks after go-live with the goal of new to all users, even though all users wil
restoring regular support levels over a
have been trained.
period of two to three months.
Additionally, all users wil be trained for
their respective jobs, and additional
training wil be available as refresher
courses immediately before and after
Appendix J - CIS Scope Inclusions and Exclusions
1. CIS Implementation Scope Inclusions
The goal of the design and development effort is to provide a customer centric and flexible system using the functionality SAP/CCS offers. Five key areas have been identified as the drivers for the scope of the project:
Processes
A list of 122 business processes have been identified:
Customer Care - 23 processes including customer enquiries, interactions movements and contracts.
Biling - 29 processes including
customer billng, exceptional biling,
non-energy biling for non-energy customers, biling plans and billng follow-up
andrate maintenance. Duplicate billng, reversals and re-
biling as well asconsolidated billng functionality are
included.Account Management - 36 processes including payments
, paymentadjustments, credit management, credit management follow-up and a variety of financial transactions
Device Management - 34 processes
, including meter reading, meter readingfollow-up, device management, customer projects and installations, and service order management.
Systems
The existing CIS wil be replaced with the
new CIS using the CIS Vision and GuidingPrinciples outlined in Appendix J. The new CIS will also perform the functionality of the
following systems:
Field Service Order System (FSOS) Complaint Management
Interfaces
A dedicated Interfaces team wil ensure that communications between the new CIS and existing systems outside of CIS run smoothly and effciently. Currently, 56 interfaces have been
identified. These interfaces comprise:
. 4
impact external, third part systems, such as the Canadian BankingAssociation
52 interact with BC Hydro systems
, such as the Electric Meter RecordSystem
11 of the 56 interfaces have been added since the RFP process began
Implementation and Data Conversion
A great deal of data is stored in the current CIS. In order to balance the requirements of
quality data with time and financial cost, the Implementation effort for the new CIS
wil
take a "
Long Bang" approach. Here, the information is brought into the new system in(e.g. meter reading) data. This allows for maximum assurance of clean data and minimal risk of customer-facing business impacts.
Data Conversion - this major Implementation activity refers to data cleansing
and data migration areas
Quality Assurance and Acceptance - this refers to the processes that
wil beput in place for testing and corrections
Cutover - this major implementation activity entails provisions for the actual
decommissioning of the current CIS and the commencement of SAP CIS Change Management & Communications
The implementation of a new system as comprehensive as SAP/CCS brings with it significant adjustments for the business and its employees. The Change Management effort for the implementation of the new CIS wil include many activities encompassing the entire business:
Impact Analysis - this activity entails readying the organization for the
change effected by the implementation of the new CIS and includes investigating role and job alignment
Communication and Involvement - communication of key messages
regarding the change to the end-user community through face-to-face sessions and involvement activities
Sponsorship - development of action plans so that ownership ofthe new
system cascades from the executive level to the larger business organization
Training and Performance Support Strategy - this refers to the plan to train
and educate end-users in the business processes and application changes, as
well as the support tools which wil help increase comfort with the change and
provide information over the long-term to the business
Business Performance Metrics - this entails aligning key performance
indicators with the new business process to ensure the metrics support the
business strategy
Transition Plan - this refers to the change management activities during
cutover which wil further provide
practice to the end-user community andcreate the training schedule
2. Scope Exclusions
The scope of Project Northstar is defined in detail in the Blueprint Confirmation materials. (Dated Aug. 30
, 2002) Below are indicative highlights of key scope
items. As a general principle
, new business requirements, which are not supportedby the current CIS, wil be considered a new scope item
and require businesssponsorship and additional funding (if approved). Contingency
wil be used, at thediscretion of the Operating Sponsors and PMT, to fund unforeseen cost overruns (which may be the result of incorrect assumptions or estimates).
This project covers a comprehensive range of processes to meet today s business requirements. The SAP CCS solution is capable of a variety of other functionality,
currently utilized will remain in place but may be replaced in subsequent phases.
These systems are:
11 Electric Meter Records System (EMRS)
II Atlas system for agency management
II Sundry Accounts Receivable (expected to be subsumed by PeopleSoft
II Financials)
II Account Online
(AOL) for electronic bil presentment and payment
II Sales and Marketing Information (SAMI) for customer managementAdditional areas that are out of scope include:
II Redesign Service Bill- To avoid any unnecessary customer impact during
go-live (which could result in operational impacts), we are adopting the current
service invoice format. Our goal is to avoid any visible change in service
including the bil format
, at go-live.Customer Data Warehouse - The present CDW will not be recreated with new data ITom the new CIS. Much of the data currently requested through the CDW will be supported via on-line and customer ABAP reports (see above reporting section). Strategically, we endorse the subsequent implementation of the SAP Business Warehouse (BW) which is included in the BCH SAP
softare
agreement and responds to ad-hoc requests in the most efficient long-term
manner.
Customer Relationship Management - While we
wil place a
significant amountof attention on developing a customer-centric solution
, Northstar wil not include
the implementation of sales, marketing or advanced segmentation included in the CRM module.
II
Industrial Billing - Complex biling for industrial customers
wil not beimplemented in the new CIS. A separate project could enable this capability and replace BC Hydro s LodeStar system.
I! Energy Data Manager - EDM for management of interval data wil not be
implemented by this project.
1& Time of Use - TOU rates and offerings are not included in this project.
II Changes/updates to
core SAP code are not in-scope. The technical developments
identified by Northstar are all customizations required to satisfy business
requirements. No changes to core SAP code are to be done by the development
team.
II Changes in business requirements within in-scope developments that are
identified after the blueprint phase are considered out-of-scope. These changes
development and other teams. Anything existing interface or other entity which the team missed during Blueprint and Blueprint Confirmation
, wil be assessed
the project team and escalated if necessary for approval via the Change Request process to be funded by the project contingency.
II Only historical data required for accurate meter reading estimation, validation and
biling wil be converted. Also, the minimum amount required by the regulatory
commission wil be converted. (See section 3.
1 for details) All other historicaldata is out of scope.
II Closed and written-off customer account information are out of scope unless a
debit/credit balance exists, which is in scope. .
II Some
data that exists in the legacy systems wil
not be converted based on agerelevance
, etc. An archiving strategy wil be required by
BC Hydro to handle such data. The archival may be in the form of transferring the data to data fies orprinting and storing the hard copies of the data. The archiving strategy and
archiving is not in scope, however the project will complete a Archiving White
Paper.
ii Changes as a result of a multi-company or multi-service configuration wil require
a new sizing exercise to define the hardware requirements and are not in scope.
II Business Continuity - Northstar wil ensure complete recovery and restore
capability for CCS. Current Customer Services BCP procedures wil be updated
where impacted by the CCS implementation. However, business continuity tasks
for systems and inuastructure not directly related to CCS and its operations are
outside the scope of North star. The project is, however, committed to supporting
a Customer Services led initiative to resolve with broader business BCP
requirements as outlned by the CIO offce and
wil include a review of the 14Appendix K - Issue
ManagementIssues wil arise throughout
Northstar and must be resolved in order for the project toadvance. The issue management
process provides a tool and a structured approach forcapturing, managing and resolving issues in a timely manner.
The Create and Resolve Project Issue process
has two main components:11 The definition of a project issue and when it is appropriate to raise and track an issue
11 The Issue Resolution Process and the PVCS Tracker issue tracking application
What is an Issue?
Team members wil create an issue in
PVCS Tracker when the following situations arise:II In-scope functionality or business principles cannot be adequately implemented or
executed given the existing set of business requirements. When this occurs
, the issuemanagement process wil be used to ensure that the right person(s) analyze the issue
and develop a solution that fits within the overall scope of the project.
11 The existing project infrastructure is impeding project team productivity. For example
if a project management process, such as status reporting, is confusing and time-consuming, and issue would be raised in order to have the PMT review the process and formulate an appropriate solution.
II
It is expected that every team member will run into issues throughout all phases of
Project Northstar. It is not anticipated that all issues wil be entered into the tool.
If ateam member has a question or request for clarification that can be handled quickly within a team
, then it may not be necessary to go through the entire process. However
issues that require a high-
degree of visibilty, or require the intervention of multiple
teams, or escalation to the PMT, should be immediately entered into the tool for tracking and eventual resolution.
Process Responsibilties
While all individual team members can create and issue, the process of resolving the issue resides with different individuals, depending on their respective roles.
An Originating Team Member (any
project team member) identifies and initiates theissue management process by creating an issue in PVCS Tracker. Originating Team Members are ultimately responsible for ensuring that their respective issues are resolved
as per the identified resolution noted in PVCS Tracker. Additionally, these individuals
are responsible for escalating issues to the PMT and for initiating other corrective processes (like the Change Control and OSS Processes), when necessary.
Workstream Managers are
responsible for ensuring that the appropriate team is assigned to a given issue, and that the issue is assigned to the right project team memberfor research and resolution. Additionally, the Workstream Manager should contribute to
the resolution of the issue by providing initial recommendation and guidance to the team
member(s) whose job it is to resolve the issue. Workstream Managers are the only
people who can change the status of an issue to be 'closed'
The PMT is responsible for resolving issues that require their
specific intervention duringthe escalation process. Issues escalated to the PMT usually have cross-project impacts or impacts which could hamper the progress of the entire engagement.
The Northstar issue management process flow is shown below:
Northstar Process 001 - Create and Resolve Project Issue
Version: 3.0 Created 9/1112001 Assign Yes Responsibility to a Team Member Review Pending Resolution ve.
-(
Clo.e Iss,e Review with PMT YesYes Initiate 055Process
Reassign Issue to Appropriate Team
Review New Issue
Initiate Change Control Process
Create Issue and Assign to Workstream Manager Resolve Issue, Document Resolution, Set Status to ' Pending
for Final Review
Risk Management
Successful management of projects always requires informed
, proactive management of
issues, problems
, and risks. Risk is defined as the
cumulative effect of the changes of anuncertain occurrence that will adversely affect program or project objectives. It is the
degree of exposure to negative events and probable consequences.
Contingency, risk
, and issue management are closely related but distinct. Risks describe
what might happen; issues describe what has already occurred. Contingency represents
management reserves set aside or float built into the program and project planning to account for unforeseen factors.
To enhance the probabilty of success for a risk management
process:. Do
not treat risk management as an adminstrative task;
. Do obtain commitment ITom everyone who is involved in managing the program and its projects;
. Do be clear about how risk management procedures will be implemented and maintained;
. Do not try to identify everything that can go wrong; focus on the risks that can have a significant impact on the project
. Do focus on risk-reduction responses that can be implemented;
. Do recognize the ongoing proactive nature of any successful risk management program, and require the program team to revisit and report on risk issues regularly Northstar manages risk on a weekly basis and considers the following aspects:
Staffing
Business Ownership Business Decisions . SAP Product Stability
Technical Infrastructure
Project Infrastructure
Scope and Issue Management Solution Integrity
Executive Sponsorship
Each week these risk areas are assessed on a scale of 1-15 (Low=1; Very High =15). This
assessment is done by the Project Management Team and reflected in the Dashboard
Appendix L - Change Control Management
During the project, there may be instances when out-of-scope functionality or
enhancements may be brought back in scope if the perceived benefits ofthe scope change
substantially outweigh the costs. Accordingly, a process has been established to ensure
that any recommended scope change be properly estimated, and that the proposed change is validated within the solution architecture.
The Create and Resolve Change Control Request process has two main components:
!I The definition of a change request and when it is appropriate to raise and track such a
request.
II The Create and Resolve Change Control process and the PYCS Tracker application
What is a Change Control Request?
Team members should initiate a change control request when
compellng arguments exist
for reconsidering out-of-scope application functionality and/or business processes. The
request will ultimately include an estimate of the work required to implement the change in scope, along with a detailed breakdown of the costs and corresponding benefits.
Because change requests have a high degree of visibility inside and outside ofthe project
it is expected that each W orkstream Manager will carefully coordinate each change request with the member of the team initiating the request.
Change requests are the logical evolution of issues in PYCS Tracker. That is
, all changerequests start as issues that are deemed to impact the scope of the project significantly.
Process Responsibilties
The process of resolving change requests resides with different individuals, depending on their respective roles.
An Originating Team Member
in consultation with theirWorkstream Manager
identifies and initiates the change request process by documenting the request in PYCS Tracker. Originating Team Members are responsible for ensuring that their requests are adequately documented prior to submission of the request
The Solution Architect is responsible for reviewing the change request and for making
the decision to allocate project resources to estimate the costs, effort, and benefits associated with the change request.
The Workstream Manager is responsible for analyzing the change request requirements
and for estimating the costs, effort
, and benefits associated with the change request. The
Workstream Manager wil update the Change Request to include a detailed
resource/budget allocation and the justification for hislher estimation.
The Operating Sponsors are responsible for reviewing the estimates associated with the
change request, and for making the final decision to implement, defer, or reject the
The Integration Manager is
responsible for integrating approved change requests intothe project's budget, work estimates
, and statistics. Additionally, the Integration Manger
insures that the project' s financial reporting is properly updated. The Project Northstar change control process is shown below:
Northstar Process 002 - Create and Resolve Change Control Request
Version: 1.0 Created: Snl2001 c: - OJ OJ c: Q) '" Review Change Request Update Project BUdget and Statistics c: Q) OJ r-'" Q) (; -1 '" Analyze Change Request Requirements Present Change No Request to Design Control Team '" E Q) Q) r- :; Create Change Request
Figure Error! No text of specified style in
ApPENDIX M - ROLES & RESPONSIBILITIES
This section defines the various committees and individual roles performed by Northstar.
Executive Sponsors (Meet Monthly)
-,Senior Vice President Distribution
-,
Executive Vice President Finance and Chief Financial Officer Role Description- Decision Making
Executive Sponsor and Champion representing Chair and CEO;
Demonstrates BC Hydro s executive commitment through active participation in the project;
Approves the project business case and CAR; Approves the Business Benefit Realization Plan;
Appoints Steering Committee and Operational Sponsors;
Keeps informed of project progress (review progress against budget and key
milestones, accomplishments, and key issues). Receives biweekly written reports and
meet monthly;
Communicates project status to Chair, Chair s Committee and Board of Directors; Provides final issue resolution (e.g. Approves out of scope items that are escalated by Operating Sponsors see issue resolution process);
Monitors governance structure (e.g. possibly modifies or appoints additional
representatives based on the outcome ofthe RFEI negotiations).
Operational Sponsors (Meet Weekly)
, Manager Business Knowledge and Information
..,
Chief Information Officer , Vice President Customer Service Reports to: Executive Sponsors
Role Description- Decision Making Common Responsibiltes
Demonstrates BC Hydro s senior management commitment through active participation in project-wide activities;
Participates in weekly review and approval process of project budget, milestones
deliverables, change requests, risks and issues with Project Manager; Approves all change requests (including requests which draw on project contingency);
Manages sponsorship and issue resolution with key stakeholders (CSMT
, Office of
the CIO, and Distribution);
Approves biweekly written progress reports for Executive Sponsors an Manages SAP commercial relationship
(softare);
Provides oversight and approval of non-labour project costs (such as
softare,
hardware and facilities);Provides oversight and approval on BC Hydro labour concerns (such as staffng,
reward! incentive programmes, etc.
Defines and assesses measurements of project success;
Identifies BC Hydro issues that may impact the project and communicates them to the Project Manager;
Reviews bimonthly Quality Assurance Reports (both IT and Finance); Approves project charter, time lines, work plans, and strategies;
moved to Owners ' Rep Individual Accountability;
Makes policy decisions that may change BCH project governance, project scope or allocation of project funding;
Resolves escalated project issues (see issue resolution process);
Approves project completion report including evidence of acceptance of each completion criteria and the minimum deliverables list.
Note: this moved to Owner s Rep and Customer Services Rep individual responsibilites. Approvals and issue resolution require all sponsors support. consensus cannot be reached the issue is escalated to the Executive Sponsors.
In
addition to the common operating sponsorship responsibilties each member has
individual accountabilities, that are outlined below:
BC Hydro Owner
s Representative
Chairs the Steering Committee Meetings and Operating Sponsor Meetings;
Reviews the biweekly Executive Summary Progress Reoprt with Executive Sponsors
and submits report
tc4;
Approves and monitors Northstar budget, approvals all financial documents and work orders.
Recommends approval of benefit realization report to Senior Vice President of
Distribution, after Customer Services approves and ensures the desired business results are delivered on time and on budget.
Approves system functionality and quality from a system owner s perspective and
ensures the solution is capable of supporting BC Hydro and Distribution
s businessstrategies.
BC Hydro Chief Information Offce Rep
Ensures the solution meets the acceptable level ofBC Hydro IT standards through the
application ofOCIO policies
, guidelines, architecture, methodologies, standards andarchitecture, and other IT industry common practices. Ensures EAI issues related to Northstar are resolved.
Customer Services and Shared Services Representative
Ensures the solution meets Customer Services ' and our clients business needs (e. Customer Services is able to deliver on appropriate Service Level Agreements); Ensures the solution is capable of supporting Shared Services/potential Newco
business strategies;
Approves Customer Services
' related benefits in the benefit realization plan;
Monitors and assesses impact of the Northstar implementation on Customer Services and proactively identifies operational issues that may impact the project;
Develops and signs-off on Customer Services Implementation Strategy and impacts
(e.g. proactive customer communications plan).
Steering Committee (Meet Monthly)
Chairs- Operational sponsors
Executive Sponsors
-CIS Project Manager (Accenture Partner)
Westech
-PowerS mart,
Role Description- Recommending Project champions;
Demonstrates BC Hydro s senior management commitment through active participation in the project;
Reviews and monitors project progress (review progress against budget and key milestones, accomplishments, and key issues) monthly;
Reviews bimonthly Quality Assurance Reports (Distribution, IT and Finance); Removes obstacles to meeting critical success factors (e.g. solicits appropriate resources from business unit for the project);
Creates the environment and management process for cultural change; Recommends Executive or Operational Sponsors investigate issues.
Quality Assurance Managers (Meet Monthly)
IT-Audit-Finance - TBD
Accenture - Bob Delves
Reports to Operational Sponsors
Role Description- Advisory
Establishes and enforces quality assurance standards; Monitors methodology for quality assurance reviews;
Completes bimonthly Quality Assurance Reviews (written) and report findings to Project Manager, Operational Sponsors and Steering Committee;
Determines whether action is required to address quality or integrity issues;
Ensures the team and project results and activities meet applicable quality standards; Participates in Project Management Team Meetings as appropriate.
Distribution rep also:
Ensures functionality and capability of developing system has the capability to support Hydro and Distribution Strategies;
Reviews system functionality and quality from a system owner s perspective;
Customer Services Management Team (Meet Weekly) via Eric Janes
Project Champions;
Works with Business Integration Managers, to ensure the CIS solution meets
Customer Services ' and our clients ' business needs (e. g. are able to deliver on Service Level Agreements);
Participates in the selection of project resources and signs-off on resources at pre-defined milestone dates;
Participates in NS Breakfast Briefings;
Signs-off on CS-related benefits realization plan by Dec 31st 2002;
Monitors and assess impact of the CIS implementation on Customer Services and proactively identifies operational issues that may impact the project;
Provides necessary Customer Service resources as required by the resource plan; Actively participates in project-wide activities;
Project Manager
Reports to: Operational Sponsors
Role Description
Overall responsibility for successful delivery of the project; Ensures the project objectives are achieved;
Provides overall leadership and direction to project team;
Reviews and monitors project progress- milestones and budgets and report to
Operational Sponsors;
Determines all project time lines, work plans, budgets and strategies;
Resolves project issues and as required escalates issues;
Resolves issues and concerns raised in weekly status meetings with Operational Sponsors;
Develops bi-monthly project 'briefings ' for CEO
Larr
Bell;Ensures quality issues are addressed as raised in monthly meetings with Quality
Assurance members;
Coordinates staffng for Accenture
, SAP, Westech, NCS and BC Hydro (with theirrespective resource managers);
Develops quality principles for managing the project; establishes procedures for conducting periodic quality reviews;
APPENDIX N
-
PROJECT
ACCEPTANCE
AND COMPLETION
COMPLETION
CRITERIA
All functional and technical designs for developments are reviewed and signed-off by
all appropriate parties.
All technical development program codes are signed-off by the appropriate parties:
process team, development team, and testing team as satisfying the documented
business requirements (unit testing).
All critical and high priority SIRS (defects) related to developments are corrected,
closed, tested and signed-off by the appropriate parties.
The functionality and performance of all medium and high priority enhancements
is
signed-off during the business integration test and user acceptance test.
All tested and signed-off program code is migrated to the production environment.
Completion Expectation
Hardware and Components
Software environments
Evidence of Acceptance
The hardware environments are reviewed and
signed-off by all parties. Any changes to the
hardware environments are approved via the
change management process.
Reference document: Infrastructure Blueprint
Confirmation Final
Reference: Appendix G
The software environments are reviewed and
signed-off by all parties. Any changes to the
software environments are approved via the change
management process.
Reference document: Infrastructure Blueprint
Confirmation Final