1
1erer Foro del Comité Electrotécnico MexicanoForo del Comité Electrotécnico Mexicano
N o r m a l i z a c i ó n i n t e r n a c i o n a l
N o r m a l i z a c i ó n i n t e r n a c i o n a l -- P r o d u c t o s c o n f i a b l e s P r o d u c t o s c o n f i a b l e s --I n s t a l a c i o n e s e l é c t r i c a s s e g u r a s
I n s t a l a c i o n e s e l é c t r i c a s s e g u r a s
Normas IEC en el TC 23
Electrical accessories -
accesorios eléctricos
1
Normalisation Wim De Kesel
IEC in figures
IEC Family (members + affiliates)
82 + 83 =165
N
b
f TC/SC
95 + 79
174
Number of TC/SC
95 + 79 = 174
Number of WG/PT/MT
1 254
Number of experts
over 12 700
Number of pubs. in catalogue
6 959
Number of pubs. issued in 2012
458
N
b
f
ti
j
t (2013/08/31)
1695
Number of active projects (2013/08/31)
1695
TC 23 in figures
TC 23 SC 23A SC 23B SC 23E SC 23G SC 23H SC 23J SC 23K TC 23 SC 23A SC 23B SC 23E SC 23G SC 23H SC 23J SC 23K P - Members 32 24 36 31 22 28 23 22 O - Members 20 18 14 15 16 15 19 1 Number of Experts 356 84 120 82 17 69 26 1 Number of Experts 356 84 120 82 17 69 26 1 Total participation in all groups 1040 185 315 174 39 110 45 1(the same Expert can be active in several groups)
Number of WG/PT/MT 5 11 8 5 6 3 3 0 Number of WG/PT/MT 5 11 8 5 6 3 3 0 Number of pubs. in catalogue 17 23 47 47 12 18 12 0 Current active projects 2 6 9 8 2 4 0 0 Mexico – membership in TC/SCsp P P P P - O - P
TC23 Scope
(still to be approved by SMB)To prepare standards for electrical accessories and home and building electronic systems for household and similar purposes, the word similar including
locations such as offices, commercial and industrial premises, hospitals, public b ilding etc
building, etc.
These accessories:
- are intended for fixed installation, or for use in or with appliances and other electrical or electronic equipment, and may include electronic components.
Include, in particular: - conduit systems
cable trunking systems
- adaptors
i it b k f t t ti
- are normally installed by instructed or skilled persons and are normally used by ordinary persons.
-cable trunking systems - cable ducting systems
- Cable tray systems and cable ladder systems - switches
- HBES switches HBE t
- circuit breakers for overcurrent protection
-devices protecting against electric shock
-arc Fault Detection Devices - contactors
- connecting devices - HBE systems
- plugs and socket-outlets - cable reels
- enclosures for accessories - appliance couplers
- cord sets
TC and SCs Scope
TC 23
Electrical accessoriesdeals with horizontal issues such as
- insulation coordination - temperatures,
- general rules,
- environmental aspects - energy efficiency aspects
and some products, such as:
- LVDC accessories
- sound and signalling devices
- Connecting devices, either as separate
entities or as integral parts of an end product - installation couplers for permanent connection
A new WG has been created to deal with HBES (2013)
The standards with Group Safety Function status in question under TC 23 responsibility are IEC 60999-1 and IEC 61545.
TC and SCs Scope
SC 23A
Cable management systemsdeals with products such as
-Conduit systems
-Extra-heavy duty electrical rigid steel conduits, fittings and accessories
-Cable trunking systemsg y -Cable ducting systems -Cable tray systems -Cable ladder systems -Powertrack systemsy -Cable cleats
-Cable ties
-Articulated systems and flexible systems for cable guiding
TC and SCs Scope
SC 23B
Plugs, socket-outlets d it hDimensional requirements for the world wide plug and
and switches (mechanical,
electronic, HBES)
world-wide plug and socket-outlet systems
The 250V system
The 125V
system
system
TC and SCs Scope
SC 23E
Circuit-breakers andSC 23G
Appliance couplers similar equipment forTC and SCs Scope
SC 23H
Plugs and socket-outlets and couplersSC 23J
Switches for appliances for industrial andsimilar applications, and for electric
vehicles vehicles
TC and SCs Scope
Conclusion
SC 23K
Electrical Energy
A homogeneous scope
Different industriesSC 23K
Electrical Energy Efficiency Products-
The subcommittee has been setup in 2012 in Oslo
Different players
Different business models
Different clientsup in 2012 in Oslo
-
A first meeting was held in New Delhi in October 2013Different clients
Different experts with different expertiseTC 23 t f SC l
-
A WG has been created-
The main discussion topics are:-
Load-shedding equipment (LSE)
TC 23: management of SCs, less product oriented
General rules
Scope conflicts g q p ( )-
Switch which control power sources-
Conclusion: work can start
Scope conflictsRecent achievements
TC 23 – Electrical accessories
C 3
ect ca accesso es
Creation of SC 23K on Energy Efficiency products (2012 Oslo) and the redefinition of TC 23 WG9 on Energy EfficiencyAspects in TC 23 (2013 New Delhi)p ( )
Disbanding of SC 23C and SC 23F and the transfer of standards to appropriate committees (2013 bycorrespondence)p )
Further update of the TR 61916 – Harmonisation of General rules, e.g. Inclusion of material selection (MT11)
The setting up of a WG to deal with safety EMC and
The setting up of a WG to deal with safety, EMC andRecent achievements
SC 23A: from component to system standardisation
SC 3
o
co po e t to syste
sta da d sat o
SC 23B:
Publication of the edition 3.2 of the IEC 60884-1
Publication of IEC60906-2, containing US P&S system
Publication of the edition1 of IEC 60669-2-5 (HBES devices)
SC 23E
The new standard on AFDD (in US known as AFCI) has been published as IEC 62606.pub s ed as C 6 606
SC23H
Published and updated first standards for P&S and vehicle connectors for charging EV in mode 3Future challenges
TC 23
The further follow up of the action plan as defined in the TC 23
The further follow up of the action plan as defined in the TC 23SBP on the global relevance of IEC TC 23 standards – the
analysis of the basic safety publications and comparison with relevant US publications (MT11)
Further work on a TS for P&S for LVDC (WG8)
Standardisation of HBE systems
SC 23B
US proposals related to products for significant markets as referred to in the action plan of the SBP of TC 23 – AWG p
To deal with the interoperability of products in the scope ofSC 23B and new light sources in the scope TC 34
SC 23B is dealing with HBES devices There is a possible
SC 23B is dealing with HBES devices. There is a possibleoverlap with TC 72.
Future challenges
SC 23E
SC 3
Work starts on requirements and tests for LVDC products
IC CPD (In-cable control and protective device for mode 2 EVh i ) charging)
SC 23G
new edition and new format for the IEC 60320
new edition and new format for the IEC 60320
TC 23 requested to analyse LVDC in the frame of SC 23G
SC 23H
Further work on P&S and vehicle connectors for charging EV in mode 3 and mode 4
Plugs socket outlets and ship couplers for high voltage
Plugs, socket-outlets and ship couplers for high-voltageFuture challenges
SC 23J
SC 23J
switches for appliances for LVDC
IEC61058-1switches for appliances is being splits in 3 parts
Part 1: General requirements
Part 1-1: Requirements for mechanical switch constructions
Part 1-2: Requirements for electronic switch constructions
SC 23K
To get the working group in place
To get the work started
To interact with other committees/WGs/MTs/PTs on the same subject in order to avoid overlap and double workINTERNATIONAL ELECTROTECHNICAL ELECTROTECHNICAL COMMISSION
Thank you for your attention
Thank you for your attention
Wim De Kesel Wim De Kesel TC 23 Secretary wim.de-kesel@legrandgroup.be +32 9 227 2240