• No results found

How To Write A Contract For A Pcr1 Project

N/A
N/A
Protected

Academic year: 2021

Share "How To Write A Contract For A Pcr1 Project"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

The First Philippine Petroleum Public Contracting Round

(PCR-1) W01/3868

Eduardo V. Mañalac

Undersecretary

(2)

2

Why Philippines?

Why Philippines?

„

Prospectivity?

„

Market?

„

Economics?

(3)

3

PCR

PCR

-

-

1 offers

1 offers

(4)

4

easy access to lots of data

ƒ

137,000 line km 2D seismic

ƒ

3,600 sq km 3D seismic

ƒ

144 wells

Also available are new, high quality seismic data in NW Palawan, Sulu Sea and East Palawan basins.

PCR

(5)

5 PGS MC3D SURVEYS PGS MC3D SURVEYS –– NW NW PalawanPalawan „ „ MC3D surveys:MC3D surveys: − − NW PalawanNW Palawan –– 897 km897 km2 2 acquired 1996 acquired 1996 − − MalampayaMalampaya –– 1,112 km1,112 km22 acquired 2002 acquired 2002 „

„ Total 916 kmTotal 916 km22 3D over open 3D over open

acreage

acreage „

„ MalampayaMalampaya High Resolution High Resolution

MC3D

MC3D –– first to be acquired first to be acquired in Asia Pacific

in Asia Pacific

Easy access to data

(6)

7

Malampaya

Malampaya HDHD--MC3D MC3D ––

Open Area Data Example

Open Area Data Example

Post-Nido turbidites

(7)

8

Easy access to data

Easy access to data

NW Palawan 3D, Palawan 2D, Sulu Sea NW Palawan 3D, Palawan 2D, Sulu Sea and East Palawan 2D Surveys by

and East Palawan 2D Surveys by WesternGeco

WesternGeco

~3,500 sq km 3D in NW Palawan ~4,800 line km 2D in Palawan

> 5,700 line km of 2D data in the Sulu Sea and East Palawan

basins

Covers significant area of Sandakan basin which is

analogous to the petroleum rich Baram and Tarakan deltas

Caga yan R idge Sandakan Bancauan Balabac

(8)

9 Structures Structures 5 km 2. 0 3.0 1.0 Thrust structuring

- multiple closed structures Closed anticline

Closed anticline

(9)

10

Malaysia analogue

(10)

13

Indonesia analogue

Indonesia analogue

TOE-THRUST STRUCTURES

(11)

14

Analogue examples

(12)

15

Easy access to data

Easy access to data

DATA ROOMS DATA ROOMS

Selected data – for viewing only

Reservation: email to [email protected]

Rooms Physical Virtual

Opening 5 Aug. 2003 -Feb. 2004 1 Sept. 2003 - Feb. 2004

Location Manila Manila, Stavanger, London,

Houston Description Workstation; paper and

digital data

Workstation with viewing and interpretation software

Fee USD 1000 (creditable to

data purchase) for max of 3

(13)

16

PCR

PCR

-

-

1 offers

1 offers

„

„

easy access to data

easy access to data

„

(14)

17

Highlights of the fiscal terms

Highlights of the fiscal terms Contract Area 2,000 - 8,000 sq km

Contract Term 7 yrs. exploration + 3 yrs. extension + 25 yrs. production + 15 yrs. extension

Signature Bonus USD 50,000 - USD 250,000 Royalties None

Income Tax Tax rate: 32% - paid out of Government share

Cost Oil/Gas Cost oil limit: 70% of gross income; Capital expenditures depreciated over 5 to 10 yrs. Profit Oil/Gas Government share: 60%

FPIA up to 7.5% of gross proceeds with at least 15% Filipino participation

(15)

18

SC Profit Sharing

SC Profit Sharing

$ 100.00 Gross Proceeds

7.50 less FPIA (to Contractor)

70.00 less Cost Recovery (to Contractor) 22.50 Net Proceeds

$ 13.50 60% Government Share $ 9.00 40% Contractor's Share

(16)

19

Comparison of Fiscal Terms

Comparison of Fiscal Terms

0 10 20 30 40 50 60 70 Spain Argentina Portugal G. Mexico New Zealand Australia Peru Philippines Tunisia Thailand Colombia Morocco Mongolia China Indon. Gas Congo E. Indonesia PNG Vietnam India Ivory Coast Trinidad Ecuador Albania Venezuela Algeria Angola Syria Myanmar Egypt Malaysia Brunei Indonesia

Contractor share of income post gov't cut & taxes (%)

Royalty/Tax System

Royalty/Tax System

Production Sharing Contract

Production Sharing Contract

Service Agreement

Service Agreement

(Modified from Daniel Johnston & Co. , Inc.)

(17)

20

„ Liberalized ”viability” of company

requirements

„ Financial qualifications related to company

working interest and work commitment

„ Past exploration expenditure can be cost

recoverable in new blocks

„ Filipino Participation Incentive Allowance

(FPIA)

Financial Qualification

(18)

21

PCR

PCR

-

-

1 offers

1 offers

„

„

easy access to data

easy access to data

„

„

excellent contractual terms

excellent contractual terms

„

„

high petroleum potential

high petroleum potential

basins/areas

(19)

22 „ NW Palawan „ SW Palawan „ E Palawan „ Sulu Sea „ Reed Bank Proven oil/gas provinces Surrounded and near similar oil/gas geology in Malaysia, Brunei & Indonesia Analogous to some Vietnam / S. China oil structures Proximity to proven Proximity to proven petroleum provinces petroleum provinces

(20)

23

Very high success rates in NW

Very high success rates in NW Palawan Palawan

by world standards

by world standards

Success rates in NW Palawan basin (58 wildcat wells) 35% 29% 9% 9% 5%10% 3% Dry Oil Discovery Gas Discovery O&G Discovery O&G Shows Oil Show Gas Show

(21)

24

„ Total of 46 contract

areas being offered

(total area ~222,000 sq km)

„ Located in shallow to

ultra deep waters close to producing fields in NW Palawan and in vast frontier areas in Sulu

Sea, East Palawan and Reed Bank

Contract areas

(22)

25

Key dates

Key dates

Issuance of related circulars June 2003 Announcement / Round opening 5 August 2003

Physical data room opening August 2003 to February 2004

Virtual data room opening September 2003 to February 2004 Road shows September 2003 to November 2003 Company evaluation of areas August 2003 to February 2004

Round closing 2 March 2004 Contract awarding May 2004

(23)

26

Conclusion

Conclusion

„ The DOE is ready to assist in any possible

way, those who may be interested to explore in the Philippines.

„ In PCR-1, we have new information, excellent

contractual terms and conditions and areas that are highly prospective.

(24)

27 www.doe.gov.ph/pcr/www.doe.gov.ph/pcr/

DOE Contact

DOE Contact

MR.

MR. EDUARDO V. MAEDUARDO V. MAÑÑALACALAC Undersecretary Direct line: (63-2) 840-2236 Fax no.: (63-2) 840-2138 Mobile: (63-917) 523-7781 E-mail: [email protected] DEPARTMENT OF ENERGY

Energy Center, Merritt Road, Fort Bonifacio, Taguig Metro Manila, Philippines 1201

References

Related documents