BACKGROUND
© ETSI 2015. All rights reserved
PROBLEM STATEMENT AND OBSERVATION
Problem Statement
•
Complex carrier networks with a large variety of proprietary nodes and hardware
appliances.
•
Launching new services is difficult and takes too long,
and requires just another variety of box, which needs to be integrated into the
existing network and IT environments.
•
Operation is expensive, due to existing procure-design-integrate-deploy cycle.
Observation
•
Commercial-off-the-shelf IT-platforms allow to host a large variety of applications.
•
New virtualization technology allows to abstract underlying hardware,
and enables elasticity, scalability and automation.
•
Network Technology suppliers already use such technologies, but in a proprietary
© ETSI 2015. All rights reserved
VISION
Efficient Resource
Utilization
Remote configuration
and install
Single design based
on commodity
hardware
Reduces OpEX and
VapEX.
Reduces system
complexities
Multivendor network
management
platform
Reduce power
consumption
Rapid Time to Market
Efficient test and
integration bcz of
common infrastructure
….
….
© ETSI 2015. All rights reserved
ETSI NFV INDUSTRY SPECIFICATION GROUP (ISG)
© ETSI 2015. All rights reserved
In the 2 months since NFV#10:
•
10 new ISG member companies,
•
71 conference calls and 1 F2F meeting week
In the 32 months since the creation of ISG NFV:
•
280 Member companies, (115 ETSI Members, 165 Participant
organisations)
•
1300 people subscribed to the principal NFV mailing list
•
34 Work Items under way, a further 2 NWIs proposed
•
Plenary attendance: NFV#1 (165), NFV#2 (285), NFV#3 (242),
NFV#4 (355), NFV#5 (260), NFV#6 (258), NFV#7 (303),
NFV#8(220), NFV#9 (244), NFV#10 (171)
© ETSI 2015. All rights reserved
CURRENT MEMBERSHIP
© All rights reserved
NFV ISG LIFE SPAN
8 October 2012 NFV White Paper Released at SDN & OpenFlow summit in Germany February 2013 NFV#1 Kick-off ETSI headquarter, France
Structure decided April 2013 NFV#2 Santa Clara ISG WI created for • E2E architecture, • use cases • requirements • terminology NFV#3 Bonn ISG mainly work on the ISG level documents July 2013 NFV#4 Sunnyvale Phase 1 work continues NFV#5 Malaga •ISG decided to go for Phase 2 •OPNFV proposed NFV#6 Okinawa ISG leadership changes.
•AT&T took the chair position •NOC chair changed affiliation NFV#7 Santa Clara •Docomo took
the ISG vice-chair position
•ISG approves the Phase 2
mission statement •IT was decided
that Phase 2 will develop normative stage 2 (Architecture) work NFV#8 Scottsdale •ISG Phase 2 started •NFV Phase 1 officially ended. NFV#9 Prague •WG chairs and vice chair elected •Phase 2 progresses NFV#10 Sanya ISG decided to make all working drafts publically available NFV#11 San Jose •Phase 3 planning started •Beyond 2016 planning started NFV#12 Jersey City October 2013
ISG releases first set of specifications as a major milestone • E2E architecture, • use cases • requirements • terminology February 2014 MANO#1 MANO#2 May 2014 July 2014 November 2014 February 2015 May 2015 July 2015 October 2015 MANO#3 Election of 2 additional ISG vice-chair took place. HP and ALU took the positions
MANO#4 Phase 1 specifications
published
MANO, SWA, REL, INF etc. MANO#5
Chairm an Working Groups INF SWA MAN O REL Expert Group PER PoC SEC TSC NOC Chairm an Working Groups IFA EVE TST REL SEC TSC NOC Phase 3 features proposals starts flowing NFV#13
© ETSI 2015. All rights reserved
LEADERSHIP AND STRUCTURE
Chair
Vice Chair
Raquel Morera,
Verizon Mehmet Ersue, Nokia
© ETSI 2015. All rights reserved
NFV Architecture
11Computing
Hardware
Storage
Hardware
Network
Hardware
Hardware resources
Virtualisation Layer
Infrastructure
Virtualised
Manager(s)
VNF
Manager(s)
NFV
Orchestrato
r
OSS/BSS
NFVI
VNF 3
VNF 1
Execution reference points
Other reference points
Main NFV reference points
Virtual
Computing
Virtual
Storage
Virtual
Network
NFV Management and Orchestration
EM 2
EM 3
EM 1
Or-Vi
Or-Vnfm
Vi-Vnfm
Os-Ma
Ve-Vnfm
Nf-Vi
Vn-Nf
Vl-Ha
Service, VNF
and
Infrastructure
Description
VNF 2
VNF
Virtualised Infrastructure Manager (VIM) NF VI Execution reference points Main NFV reference pointsEM
VNF Catalogu e Or-Vi Ve-Vnfm-vnf Ve-Vnfm-em Os-Ma-nfvo Nf-Vi Vn-Nf NFV Orchestrator (NFVO)NFV-MANO
OSS/BSS NFVI Resourc es Or-Vnfm Vi-Vnfm NFV Instanc es Other reference points NS Catalogu e VNF Manager (VNFM) • NS Lifecycle Management • NS Lifecycle Change Notifications • NS Descriptor Management • NS Performance Management • NS Fault ManagementNetwork Service
• VNF Package Management • VNF Image Management • VNF Lifecycle Management • VNF Lifecycle Operation Granting • VNF Lifecycle Change Notifications • VNF Configuration Management • VNF Performance Management • VNF Fault ManagementVNF
• vResource Catalog Management • vResource Capacity Management • vResource Performance Management • vResource Fault Management • vResource Management
Virtual Resource
• NFVI Compute Management • NFVI Networking Management • NFVI Storage Management • NFVI Hypervisor Management
NFV LAYERS VIEW
12NFV Infrastructure (NFVI)
Compute
Storag
e
Network
HW ResourcesVirtualization Layer
Virtualization SWVirtual
Compute
Virtual
Storag
e
Virtual
Network
Virtual ResourcesNetwork Service
VNF
VNF FGVNF
VNF
PNF
Logical Links Logical AbstractionsEnd
Point
End
Point
E2E Network Service
VNF Forwarding Graph
(including Service
Chain)
VNF Instances
VNF
VNF
VNF
SW InstancesVNF
VNF : Virtualized Network Function PNF : Virtualized Network Function
MANO DESCRIPTORS
13 NSD Id Vendor Version vnfd Vnffgd Vld Lifecycle_event Vnf_depedency Monitoring_parameters Deployment_flavour Auto_scale_policy CP pnfd VNFD vendor descriptor_version version vdu virtual_link connection_point lifecycle_event dependency monitoring_parameter deployment_flavour auto_scale_policy manifest_file manifest_file_security VDU id vm_image computation_requirement virtual_memory_resource_element virtual_network_bandwidth_resource lifecycle_event constraint high_availability scale_in_out vnfc monitoring_parameter id vm_image vnfc id connection_point VNFFGD Id Vendor Descriptor_version Version Constituent_vnf Cp Nfp Depedent_virtual_link Number _of_endpoints number_of_virtual_lin k VLD Id Vendor Version Root_requirements Leaf_requirements Qos connection Connectivity_type Test_access NFP Id policy connectionVNF LCM OPTIONS
14
VNF LCM in direct Mode VNF LCM in in-direct Mode
•
VNFM talk to VIM, for resource management,
directly after getting a permission (granting)
form NFVO for particular LCM operation.
•
VNFM talk to VIM, for resource management, via
NFVO even after getting a permission (granting)
form NFVO for particular LCM operation.
Pending Issues:
•
Is granting always needed?
•
What bout cases where LCM request is received by NFVO in first place.
•
Can granting be “delegated”
IFA008 (Ve-Vnfm)
15Generic VNFM
Specific VNFM
Vendors Boundaries The most controversial Interface in NFV architectureNFVO SPLIT
16
NFVO- DO acts as a proxy between NFV-SO and VNFM
for VNF LCM
NFVO(RO) acts as a proxy between NSO and VIM
hiding underlining multiple VIM form NSO.
IFA012 (app & services running on top)
17
Details of 'DGS/NFV-IFA012' Work Item
This work item will entail work to specify the interface(s) and the corresponding requirements that comprise
the Os-Ma-nfvo reference point as currently defined in the GS NFV-MAN 001 regarding applications/services
on
top
of Network Services (NS).
• Life cycle management of Services (applications/services on top of NS). • Monitoring/Tracing (e. g. concerning services).
• Flexible/dynamic service orchestration including creation and modification (e. g. orchestration, launching of a service and adaptation of running services.
What is
on-top
??
On-top may imply:
•
Grouping:
•
Having an existing NS grouped with the
“application/service” on top.
•
Full (entire NS) and partial (few VNF of
a NS) grouping is possible
•
Grouping may imply dependencies
between NS and “application/service”
on-top.
© ETSI 2015. All rights reserved
© ETSI 2015. All rights reserved
STAKEHOLDERS
•
Vendors: providing solutions/products
•
VNF/Network Service Vendors
•
Converting their existing NFs into VNF/NS
•
NFV Hardware vendors (NFV COTS)
•
Provide an efficient COTS which can meet integrated hardware in terms of efficiency.
•
NFV MANO vendor
•
Providing multivendor NFV network management system.
•
Legacy NMS (EM, OSS/BSS) vendor
•
Saving the current investments
•
Network Operators: deploying provided solutions/products
•
No-vendor lock-in
•
Reducing OpEx
•
Reducing CpEx
•
Service Providers: consuming NFV service and providing further service to end-users
•
VNFaaS, NFVIaaS
•
End Users
STAGE 3 STANDARDIZATION LANDSCAPE
20??
Standardized Open Source Public?
?
RELATED SDO AND TECHNOLOGIES
21
Category
NFV 3GPP TMF OASIS IETF DMTF OMG OpenStack OPNFV OpenMANO OpenDaylight
Business Layer
Business
Processing ZOOM BPEL BPMN
Modeling Modeling IFA
(MANO) SID TOSC A YANG Project Policy Policy Manageme nt IFA(MAN O) ZOOM NFV-RG Architect
ure Interface/APIs (MANO, IFA SWA)
SA5 OMI, ODE CAMP CIMI Projects OpenDaylight
Orchestrati
on (MANO) IFA FMSS (Service
Chaining) ZOOM SFC NFV-RG Heat OpenMA NO OpenDaylight VNFM IFA (MANO,S WA, INF)
SA5 ZOOM Projects OpenDaylight
NFVI OpenSt
ack Projects OpenDaylight
Reliability Reliability/
NFV PHASED DEPLOYMENTS
22
NFV is considered to be a disruptive technology. Specially, it is expected to change the way
current networks is being managed.
The multi-vendor management and
orchestration objective of NFV need to
controlled. Smooth migration is
required.
Phase 1 Phase 2Phase 3 Phase 4 Final Phase
© ETSI 2015. All rights reserved
© ETSI 2015. All rights reserved
Launched 30 Sep 2014
Speed up implementation of NFV
Create a carrier grade Open Source Ecosystem
OPNFV (OPEN PLATFORM FOR NFV)
Website:
https://www.opnfv.org/
Wiki:
https://wiki.opnfv.org/
OPNFV Arno:
https://www.opnfv.org/arn
o
© ETSI 2015. All rights reserved
OPNFV Project Pipeline
OPNFV CONTND…
For details: https://wiki.opnfv.org/
Next OPNFV release (in discussion) now is called
“OPNFV
Brahmaputra
release aka B release”
OPEN MANO
26
•
Openmano (spelled without capitals), a reference
implementation of an NFV orchestrator
•
Openvim, a reference implementation of a virtualized
infrastructure manager (VIM)
© ETSI 2015. All rights reserved
© ETSI 2015. All rights reserved
© ETSI 2015. All rights reserved
WHAT ARE THEY?
NFV enables executing existing network functions on virtual
machine where as, SDN separate control flow from data flow.
SDN
Applied
NFV
Applied
PLACEMENT IN ETSI NFV ARCHITECTURE
29 SDN Controller SDN vSwitch vSwirch SDN OpenFlowThe most obvious
NFV construct
related with SDN
would be NFPs
(network forwarding
path aka service
chain) included in
VNFFG.
SDN could be used
to configure vSwitch
to forward the
traffic as per a
particular NFP.
© ETSI 2015. All rights reserved
SOME USEFUL POINTERS
NFV Public page
•
http://www.etsi.org/technologies-clusters/technologies/nfv
NFV published Specifications
•
http://www.etsi.org/technologies-clusters/technologies/nfv
All NFV working drafts are publically accessible
•
http://docbox.etsi.org/ISG/NFV/Open/Drafts/
NFV PoC updates
•
http://www.etsi.org/technologies-clusters/technologies/nfv/nfv-poc
NFV Liaison Matrix
© ETSI 2015. All rights reserved
RELEASE 2016 TIMELINE
32Feature
based
2016
Release
FEATURE PROPOSAL SUBMITTED
33
Total 24 feature proposal were submitted for 2016 release.
30%
18%
11%
7%
7%
7%
4%
4%
4% 4%
4%
Contributions
AT&T
Huawei
HP
DT
DoCoMo
PTP
FEATURE PROPOSAL RECOMMENDED BY TSC
Listed in TSC recommendation
NOT listed in TSC
recommendation
Withdrawn/Merged
“New Features”:
FTR002 (CHRG)
FTR003 (NFV_SECM)
FTR007 (POLICY)
FTR008 (SEC4SNC)
FTR013 (VEMOSS)
FTR016 (VNF_PHOTO)
FTR017 (NFV_M&Ms)
FTR019 (SWUP)
FTR030 (NFVWAN)
FTR031 (CONF&IOP)
FTR004 (REAL-TIME)
FTR011 (NFVI_PATH_TEST)
FTR018 (NFV_FM)
NFV039 (INTENT)
“Extensions“:
FTR001 (IM-NFV)
FTR010 (NFVO_ARCH)
FTR026 (HWENV)
FTR035 (FASTSWITCH)
FTR023 (VNFCON)
FTR005 (DM-NFV)
FTR012 (HWMET)
FTR027 (PLACEMENT)
FTR029 (MARKETPLACE)
FTR033 (G-VNFM)
FTR036 (PAAS)
FTR037 (BBF-MSBN)
FTR006 (IOT-5G)
FTR020 (NFVI-EndPoints)
FTR021 (NFVI-EndPoints)
FTR022 (NFVI-EndPoints)
FTR024 (WAN services)
FTR025 (WAN control services)
FTR028 (MAN-REL)
FTR032 (Lightweight Containers)
FTR009 (VNFM_ARCH)
Research Agenda:
FTR004 (REAL-TIME)
FTR014 (DEVOPS)
FTR015 (PNF2VNF)
FTR034 (VCONF)
FEATURE MAPPINGTO WGs
NFV-IM (FTR001) IFA CHRG (FTR002) IFA NFV_SECM (FTR003) SEC, IFAWork Item set to
update published
GS(s)
POLICY (FTR007) IFA SEC4SNC (FTR008) SEC, IFA VEMOSS (FTR013) IFA NFV_M&M (FTR017) IFA, SEC, RELVNF_PHOTO (FTR016) TST, IFA, SEC INTENT (FTR039) EVE, IFA PATH_TEST (FTR011) TST NFVO_ARCH (FTR010) IFA NFV_FM (FTR018) REL SWUP (FTR019) REL, TST, IFA, SEC CONF&IOP (FTR031) TST HWENV (FTR026) EVE, SEC, REL
NFVWAN (FTR030) IFA VNFCON (FTR023) EVE FASTSWITCH (FTR035) IFA
Features
Building Blocks
REAL-TIME (FTR004) EVE, IFAWork Item set for
feature related
normative work
Work Item set to
cover Stage 3
Work Item set for
feature related
informative work
Work Item set to
update published
GS(s)
Work Item set for
feature related
normative work
Work Item set to
cover Stage 3
Work Item set for
feature related
informative work
EVE
IFA
REL
TST
SEC
To derive work items
Extensions
NFV Information Modelling Charging, Billing and Accounting Security Management Policy Management End-to-End Management Testing Continuous Integration Service and NetworkService Orchestration Transition into
NFV and Integration New
STEPS AHEAD
1. Refine the document on endorsed features
2. Request the NOC to recommend priorities for the endorsed
features
3. Identify sources for work item definitions – By the end of
November
4. The TSC will prepare work-item guidelines according to these
sources
5. Work-item proposal collection – Deadline: two weeks before
NFV#13
© ETSI 2015. All rights reserved