Update on the Metro Nashville

Consent Decree Program

Scott Potter

(2)

2

Why We Are Here

• Planned actions to meet Clean Water Act

• The types of projects that will be constructed

• The impacts of these projects

• The costs of the Program

• The benefits of the Program

(3)

What is a Consent Decree?

The consent decree is an agreement based on

enforcement for violations of the Clean Water

Act between the following parties:

• Metro • EPA

• U.S. Department of Justice

• Tennessee Department of Environment and Conservation

(4)

4

Nashville is Not Alone:

Utilities with Consent Decrees

Atlanta $ 3 billion Birmingham $ 3 billion Cincinnati $ 1.5 billion Columbus, OH $ 2.5 billion Indianapolis $ 1.3 billion Louisville $ 850 million Northern KY San. $ 880 million Dist. No. 1

(5)

Program Communication Plan

• Proactive communication to advise Council

Members in advance of project

• Community meetings as needed prior to

construction

• On-going neighborhood communications

during construction

(6)

6

Combined and Separate Sewer Systems

(7)

Frequently Used Terms

ISSUE: SSO – Sanitary Sewer Overflows PLAN: CAP/ER – Corrective ISSUE: CSO – Combined Sewer Overflow PLAN: LTCP – Long Term

(8)

8

• 2 ½ years to develop plans:

̵ Corrective Action Plan / Engineering Report for SSOs Long Term Control Plan for CSOs

• 11-year implementation period after approval • Stipulated penalties:

̵ $1,000 / SSO occurrence

̵ $3,000 / SSO occurrence after December 2014

(9)

• Corrective Action Plan / Engineering Report for SSOs – submitted September 2011

• Long Term Control Plan for CSOs – submitted September 2011

• Regulatory Response: none to date

• Implementation: Proceeding with key elements of the Program

(10)

10

Progress in Reducing SSOs

(11)

Corrective Action Plan / Engineering

Report – Sanitary Sewer Overflows

(12)

12

CAP / ER

Sources of

Inflow and

Infiltration

(I / I)

(13)

CAP / ER Sewer Defects Identified by Televised Inspection

(14)

14

CAP / ER

Defects identified in MWS sewers

(15)

CAP / ER

Hydraulic

Modeling for

2-year storm

event

61 permanent

and 144

temporary flow

monitors

(16)

16

CAP / ER – Hydraulic Modeling

Hydraulic model identifies level of sewer

surcharge in manholes during 2-year storm event.

Project type alternatives modeled to reduce

surcharging to

(17)

CAP/ER Project Types

(18)

18

CAP/ER – Project Types

(19)

CAP / ER Project Types

Inflow / Infiltration Reduction – Sewer Rehabilitation Cured-in-place Lining

(20)

20

CAP / ER – Project Types

(21)

CAP / ER – Project Types

(22)

22

CAP / ER – Project Types

(23)

Dry Creek Service Area

MWS

Sewer

Service

(24)

24

Dry Creek Projects

24

Conveyance Improvements: 7,900 feet (gravity)

22,900 feet (force main) Pumping Upgrades and Storage: 5 pumping

station upgrades and one 10 MG tank

Sewer Rehabilitation: 168,000 feet

(25)

Whites Creek

Projects

Sewer Rehabilitation: 250,000 feet Storage Upgrades: 4 tanks totaling 31 MG Conveyance Upgrades: 43,900 feet

(26)

26 26 Sewer Rehabilitation: 250,000 feet Conveyance Upgrades: 43,900 feet Storage Upgrades: 4 tanks totaling 31 MG

Whites Creek

Projects

(27)

Central Projects

Sewer Rehabilitation: 1,250,000 feet

2 pumping station

upgrades and 6 storage tanks totaling 86 MG Conveyance Upgrades: 49,900 feet (gravity) 4,600 feet (force main)

(28)

28

Mill Creek Trunk

• Six miles of upsized sewer, ranging from 72 to 102 inches in diameter

• Extends from south of Briley near I-24 to the existing Barker Road / Omohundro storage

facility

• Requires significant easement acquisition

(29)

Mill Creek / Opryland Storage

• Phase I: 15 MG Barker Road / Omohundro

storage tank – existing • Phase II: New 15 MG

tank on existing property • Phase III: Four additional

15 MG tanks and 100 mgd pump station

(30)

30

CAP

/

ER Cost Summary

Central 73% Dry Creek 10% Whites Creek 17% Conveyance 35% Pump Station 5% Rehabilitation 38% Storage 22%

Total CAP

/

ER Cost:

(31)

Long Term Control Plan

(32)

32

(33)
(34)

34

Combined Sewer Systems

(35)
(36)

36

Nashville

Combined

Sewer

System

(37)

32 CSO

sites in 1990

8 CSO sites

in 2009

(38)

38

Water Quality Impacts

Mill Creek Whites Creek

Browns Creek Richland Creek

(39)

Water Quality – Recreation Areas

Mill Creek Whites Creek Browns Creek Richland Creek Riverfront Park

(40)

40

CSO Alternatives – Level of Control

Performance curves modeled to identify cost-effective controls for typical rainfall year:

(41)

Public Input Highlights

Citizens Advisory Group and public meetings generated community input including:

Value and concern for the Cumberland River

Limit neighborhood impact

Balance investment for improvements with impact to

ratepayers

Priority for green solutions when appropriate

(42)

42

Recommended Level of Control

CSO Site

Overflows

(typical year)

Driftwood 0

Boscobel 0

Benedict & Crutcher 2

Schrader 2

Washington 11

Kerrigan 9

(43)

Washington

CSO Area

(44)

44

Cost: $ 17 million Status: Operational

(45)

Washington Level of Control

(46)

46

Kerrigan

CSO Area

(47)

Kerrigan CSO Discharge Site

Greenway

(48)

48

Kerrigan Level of Control

(49)

Green Initiatives for

(50)

50

Green

Infrastructure

Proposed for

Combined

Sewer Area

(51)

Proposed Green

Infrastructure Project

for Metro Parks

(52)

52

Low Impact

Development

Manual

Requires

Capture for 1”

Rainfall

(53)

Proposed MWS Incentive for Reducing

Runoff to Combined Sewers

Facilities installing green roofs would receive reduced sewer

(54)

54

Cost Summary for Consent Decree

CAP / ER $ 770 M 68%

LTCP $ 300 M 26%

Sewer Rehab (non-CAP/ER) $ 70 M 6%

Total * $ 1,140 M 100%

(55)

Cost Impact for Consent Decree

Developed cash flow needs for program

Impact: No immediate need for rate adjustment

Developing revenue study to address long-term

(56)

56

Consent Decree Implementation

Revise CAP / ER and LTCP if necessary

Program Manager – CDM / AECOM

Construction Manager – GSP / CH2MHill

Project Set Designers:

5 Teams for equalization tanks and pumping stations 8 Teams for conveyance improvements

15 Teams for sewer rehabilitation 6 Teams for SBE engineering firms

(57)

Questions

&

References

Related documents

of Molecular Microbiology/Inmunology and USC/Norris Comprehensive Cancer Center, Keck School of Medicine, University of Southern California, Los Angeles, California, USA..

multidisciplinary team… I work as a social worker with a team of professionals, primary care and so forth, and all of us are equal at the table.”.. NLN

Learning agent predict disease of input using J48 Decision tree algorithm and the result can be send back to Collector agent. Thus the proposed system

Several ways of energy generating during cryogenic product regasification was chosen for analysis and comparison: utilizing of the cold energy to reject heat from the

Meritex Lenexa Executive Park Executive Park Meritex Lenexa Meritex Lenexa Executive Park Executive Park Prairie Creek Prairie Creek Residential Residential Prairie Creek

You can format your Shift Planning data in the SAP R/3 System using the Microsoft Excel ® interface (Excel versions 5.0

3 Key Accountables - Define, propose and implement a global insurance strategy as it applies to the purchase of insurance coverage, the appointment of insurance Brokers,