• No results found

End to End Performance Evaluation of Service Aware LTE A Uplink Scheduler

N/A
N/A
Protected

Academic year: 2020

Share "End to End Performance Evaluation of Service Aware LTE A Uplink Scheduler"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 3.0 Error bars of throughput of  BET, MT and SA
Figure 6.0 End-to End delays of far users for BET, MT and SA
Figure 9.0 Error bars of End-to end delay of BET, MT and SA far users

References

Related documents

From four cases, two considered as mobility service providers (Whim and Moovel) where travellers could plan, book, take, and pay for a trip within a single app experience, and the

Figure 2.7 Post hoc regression on the relationship between herbaceous groundcover measures and overstory metrics during an oak woodland and savanna restoration experiment, 2008-2012,

In most monolingual dictionaries, examples and quotations are used to help understand the meanings and definitions of words; prose and verse accompany the definitions of

Figure 6 shows the service match generated for a model in which an Aircraft resource can provide transportation services to a MovementRequirement task, and requires additional

[r]

The increase in ramp fees is due to greater expenses primarily in maintenance labor costs and materials related to the abnormal winter weather events in 2013 and debt

[r]

Some babies exposed to Subutex (instead of methadone) may experience withdrawal for a shorter period of time, or their symptoms may not be as bad – but this is not true for all babies