Contents

1. Introduction 1

2. New features 1

3. Major bug fixes 2

4. Known limitations 2

5. How to register a NSR licences 3

5.1 Installing NSR 3

5.2 Entering User Information for a new licence 3

5.3 Activating a licence 3

5.4 Checking the status of a licence 3

(4)
(5)

NSR 2019.0 Release Notes Ver. 1.1 1

1. Introduction

Dear NSR users,

We are proud to announce the latest version of the NSR software. This version includes:

- Relevant Rule amendments to ensure your design is compliant with the latest requirements.

- Resolution of issues and feedback from regular users of the software.

- Addition of shear flow calculation to allow direct shear stress and shear buckling assessments to be completed for global strength.

- Update of extreme strength assessment to allow assessment of ultimate hull girder collapse for shear failure.

The software provides a convenient and quick method of determining compliance with LR Rules.

Rule requirements can be interrogated to identify design features which are driving scantlings and weight.

The software is flexible to enable a section or the entire ship to be modelled.

Software files can be shared with LR to speed up design appraisal and assessment.

As ever, we welcome your feedback and feature requests at [email protected] to help to improve the NSR software.

NSR Software Team Lloyd’s Register September 2020

2. New features

Added shear flow calculation to allow direct shear stress and shear buckling assessments to be completed for global strength.

Updated the extreme strength assessment to allow the assessment of the ultimate hull girder collapse for shear failure.

Extended the implementation of the shear stress and shear buckling assessments for global strength using the rule recommendation

Added support for corrugated stiffener profiles

Added copy and paste support to tables for still water global loads, panel intermediate points, and stiffener groups.

Implemented support for the modelling of horizontal strakes on bulkheads

Added option to complete a spline definition using the left mouse button click while holding down the Ctrl key.

Added support for user interface interactions while running calculations

Implemented relevant rule updates

(6)

NSR 2019.0 Release Notes Ver. 1.1 2

3. Major bug fixes

Fixed issue preventing the operation of the hull importer

Removed spurious pillar bulkhead calculations

Fixed display of the angle between stiffeners and spline panels

Fixed transverse section modulus calculations for ultimate strength

Fixed calculation errors in the rule recommendation based shear stress and shear buckling assessment.

Fixed mismatch between the values shown for extreme vertical wave forces and still water shear forces in the

‘Hull_Shear_Strength’ and ‘Extreme Strength Assessment’ nodes.

Fixed the evaluation of the structural design buckling factor for shear stress to recognize the side shell

Added exposed deck and bilge to panel types to be considered when assessing hull shear strength using rule recommendation for ships having hull configuration Type A

Fixed the rule shear force that is used when calculating the design shear stress when using the rule recommendation method

Fixed the calculation of the deflection ration (f_delta) for the side shell

Fixed software installation for standard (non-administrative) user accounts

Fixed the calculation of delta_i in shear strength calculations

Fixed the calculation of frame spacing in the calculation of the required web thickness

Removed the required secondary stiffener spacing from bottom floors

Fixed the calculation of μ for the shear stress distribution factor

Fixed the damaged/design still water shear force calculations

Fixed of floor web thickness calculation for single bottom structure and intermediate result references

Fixed Position FWD of AP and x/LRule for Still Water Global Loads when user select “Frame Number” for “X Type”

Fixed the delta calculation for shear stress

Fixed division by zero (#DIV0) error with height under consideration being above the lower deck for hull type B and C

Removed attached plating and section modulus from profiles definition

Fixed ultimate strength calculations

Fixed the calculation of x/LRule when getting bending moment/shear force values for a transverse section

Fixed graphics to prevent display of non-existent transverse structures

Added the stress factor correction for longitudinal structures and stiffeners based on NSR rule Jan 2019 Part 6 chapter 5 table 5.3.2 note 8

Removed time-bomb requiring a software license to run on LR machine after September 1, 2020.

4. Known limitations

The shear flow view currently does not have zoom or pan capability.

(7)

NSR 2019.0 Release Notes Ver. 1.1 3

5. How to register a NSR licences

5.1 Installing NSR

You will need to have Windows Power User or higher administrative rights to install the software and register a licence. If you uncertain about the user rights that you have on your computer, please confirm it with the IT Department in your organisation.

5.2 Entering User Information for a new licence

You will be prompted to activate NSR the first time it starts. Please enter the user information in the NSR Licensing Dialog. This information and the hardware signatures on your machine will be used to generate a licence request file automatically. You can email this file to the NSR support team by clicking on the Email Request button. Alternatively, you can choose to save the request file by clicking on the Save Request button and send the file to [email protected] later.

Note: The Comment area in the Licence Dialog is very useful for you to provide extra information.

For example, if the licence is authorised by one of the LR local offices, you may provide the name of your contact here to reduce the processing time. By default, a 3 months usage period will be granted. If the software is paid for, you will receive a perpetual licence.

5.3 Activating a licence

The NSR support team will generate a licence file after receiving a licence request. Upon receiving the licence file, you should restart NSR and go to File > Registration in the main menu to bring back the Licensing Dialog.

The licence file can be imported by clicking on the Activate Licence button. If the registration is successful, you will see a message showing the number of remaining days for time-limited licences.

If a perpetual licence is activated successfully you will see a message with no time limit.

5.4 Checking the status of a licence

If you wish to check your licence status, please go to File > Registration in the main menu. The Licensing Dialog will now display information for registered licences.

(8)

Lloyd’s Register EMEA

Lloyd’s Register Global Technology Centre Southampton Boldrewood Innovation Campus Burgess Road, Southampton, SO16 7QF E: [email protected]

W: www.lr.org

www.lr.org

Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Lloyd’s Register Group Services Limited is a limited company registered in England and Wales, registered number 6193893.

Registered office: 71 Fenchurch Street, London, EC3M 4BS, UK. A member of the Lloyd’s Register group.

Lloyd’s Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are individually and collectively, referred to in this clause as ‘Lloyd’s Register’. Lloyd’s Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd’s Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract.

References

Related documents

Where T TO is the rated top-oil time constant in minutes, DH oil is the rated top-oil temperature rise over ambient temperature, q tot,rated is the total supplied losses (total

As part of a per diem or subsistence allowance provided in conjunction with allowable travel; and Under a conference grant, when meals are a necessary and integral part of a

In the North Denmark region general practice, a complex strategy for new low back pain guideline implementation will be tested to study behaviour change (professional practice)

Once again, RR studies are generally performed a posteriori, after the player died, so it is very hard to evaluate how frequently this game is played (because it is possible to argue

In sum, we find that growth stocks outperform value stocks on days following increases in the VKOSPI, and that a potential trading rule developed on book-to-market ratios

For large-cap stocks (quintiles 1 and 2), the autoquote instrument shows that an increase in algorithmic liquidity supply narrows both the quoted and effective spread.. To interpret

Pallavi Patel College of Health Care Sciences in 2017, offers 29 degree programs, has more than 3,000 students, and has close to 200 full-time faculty and staff members

a) During the period ended June 30, 2012 the Company closed a convertible bond for an amount of Norwegian Krone (“NOK”) of 60 million (Note 7) and secured two additional