A Study on Fuzzy Critical Path Method Based On Metric Distance Ranking Of Fuzzy Numbers with Conventional Method
Full text
Figure
Related documents
cis -Golgi, wie Wildtyp-H-2K b. Es wird diskutiert, ob dies ein Hinweis auf einen aktiven Transportmechanismus von MHC-Klasse-I-Molekülen aus dem ER ins ERGIC ist. Neben
BE on substrates containing wheat bran (WB) was the lowest at all three rates tested for this additive (Fig. LB showed to be an appropriate substitute for WB or CC when used as a
In this series, the image quality and value of intraoperative 3D fluoroscopy with intravenous contrast agent for the evaluation of aneurysm occlusion and vessel patency after
The initial dose finding clinical trial of nivolumab enrolled heavily pretreated patients (median of four prior lines of therapy) with progressive advanced RCC,
Due to the low energy generated by the harvester, current progress of research in piezoelectric vibration energy harvester are focusing on optimizing the output power
It is positive sign for higher education; it shows the effectiveness of management of respective universities and colleges especially in running post graduate
Exploratory (inductive) studies start with no formally stated hypotheses. This is appropriate when one has little explicit knowledge about a phenomenon. The purpose is to
Myeloablative radiochemo- therapy followed by autologous stem cell transplantation in first remission prolongs progression-free survival in follicular lymphoma: Results of