• No results found

Risk Assessment for ITER TF Coil Manufacturing

N/A
N/A
Protected

Academic year: 2020

Share "Risk Assessment for ITER TF Coil Manufacturing"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1ITER TF coil design [2].
Fig. 2Joints at terminal area.
Fig. 4Outer view of one-third-scale mock-up.

References

Related documents

As engaged community partners, Darling Marine Center faculty, staff and students work with fishermen, aquaculture entrepreneurs and citizen scientists to advance

this Committee to think of the Canadian broadcasting system as one integrated system that can offer Canadians a wide variety of Canadian programming on any platform

Associate Professor of Nursing, Northwestern State University – College of Nursing and Health Sciences?.

In terms of prevalence, 15% of the relatives of social phobic patients fulfilled criteria for social phobia, against 10% among relatives of simple phobic patients, 8% in relatives

Delay fault testing allows testing for delay faults. A delay fault occurs in a circuit when one or more paths in the circuit fail to propagate a signal within the time

У цілому ж, аналіз результатів проведеного дослідження свідчить про ефективність впливу акмеологічного простору ліцею на розвиток інтелектуальних,

The specificity of the proposed HPLC method for determination of GRS.HCl, BZA and SBZ in the investigated pharmaceutical preparations in presence of the

tive methodology, and IPE scholars using a constructivist ontology would be more likely to use qualitative methodological techniques.. The TRIP dataset, which covers a broad sampling