• No results found

Short-term Forecasting of the Abu Dhabi Electricity Load Using Multiple Weather Variables

N/A
N/A
Protected

Academic year: 2021

Share "Short-term Forecasting of the Abu Dhabi Electricity Load Using Multiple Weather Variables"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1 - Electricity demand
Figure 2 - Exogenous variables (temperature, specific humidity, GHI and wind speed)
Figure 3 - Trend and correlation analysis for 1-lag/24-lag differenced temperature (a), specific humidity (b), GHI (c) and wind speed (d)
Table 2- Best models based on AIC and Standard Error Estimate
+6

References

Related documents

Different superscript letters within the same row show significant (p < 0.05) differences of means among extraction solvents.. Mostly methanol is used for extraction various

Heparan sulfates isolated from adult neural progenitor cells can direct phenotypic maturation HIRAM CHIPPERFIELD, KULDIP S BEDI, SIMON M COOL and VICTOR NURCOMBE*,1 School of

Because it is easy to discover which API functions a program calls by examining the import table, the LoadLibrary() and GetProcAddress() API functions are used by malware such as

[r]

ACC, American College of Cardiology; ACS, acute cor- onary syndrome; AGS, the American Geriatrics Society; AHA, American Heart Association; BMI, body mass index; CAD, coronary

This study assesses among adult patients accepted for aortic valve replacement (AVR): (1) experience with current clinical decision-making regarding prosthetic valve selection,

 Sole Responsibility, average of 25 students per class  Course designed for students with music backgrounds 2001 – 2002 Teacher Trainer/Lecturer, Mi Escuelita, Dallas,

The Annual Planning Committee, along with the Leadership Team that includes the Superintendent, Director of Business and Operations and the Director of Service and Supports, and