• No results found

ivu. integrated RESOuRCE PLANNiNG

N/A
N/A
Protected

Academic year: 2021

Share "ivu. integrated RESOuRCE PLANNiNG"

Copied!
17
0
0

Loading.... (view fulltext now)

Full text

(1)

ivu.rail

iNTEGRATED

RESOuRCE

(2)

3

IVU MAKES INTEGRATED

RESOURCE PLANNING

POSSIBLE AND EASY.

All planning and dispatching processes

for personnel and vehicle deployment

in a universal system.

The deployment of the key resources “employees” and “vehicles” is a central component of rail operations. In the past, paper and pencil, as well as magnet boards were chiefly used for this purpose. Later on came computer programs that were tailored to individual procedural steps. This then led to the emergence of a heterogeneous system landscape made up of many individual software solutions. All of these parallel systems had to be meticulously linked together via interfaces. The redun-dancy of the processed data can lead to inconsistencies.

In addition, each of these systems must also be operated and maintained separately.

In recent years, the possibilities for IT support have increased significantly, both with regard to the amount of data processed and the functional complexity. Over more than 30 years, IVU Traffic Technologies AG has acquired a wealth of expertise in the field of planning and dispatching software. IVU. rail provides our clients with a standard solution that covers the planning and dispatching process in its entirety, from supply planning and operational implementation in predefined vehicle workings and duties to the daily dispatching of rolling stock and train drivers, train conductors and shunting personnel. For the first time, all planning processes have been consolidated in one system and in a single database.

In cooperation with leading railway companies, IVU. rail is continually being upgraded and adapted to technological advances. Additional optimi-sation components have been included over the past few years which are based on elaborate mathematical algorithms, but which, at the same time, take into consideration rules and parameters from manual planning to attain results that can be directly used for operations. This means that the processing time for the implementation of a new timetable can be drasti-cally shortened and the resources needed for such a procedure can be reduced.

(3)

IVU. rail. plan

Network

planning

IVU. rail. plan

Timetable

planning

IVU. rail. plan

Duty

scheduling

IVU. rail. crew

Roster

layout

IVU. rail. crew

Personnel

dispatch

IVU. rail. crew

Payroll

accounting

IVU. rail. plan

Vehicle

working

scheduling

IVU. rail. vehicle

Track

occupancy

IVU. rail. vehicle

Vehicle

dispatch

IVU. rail. vehicle

Vehicle

monitor

Integrated Resource Planning

IVU. rail. plan

Manages the entire route network and develops the timetable services available – from strategic planning to date-specific exceptions. By using intelligent algorithms, IVU. rail. plan optimises vehicle workings and duties, and at the same time considers any operational rules and guide-lines from the planner. -> Page 8

IVU. rail. crew

Manages the entire personnel deployment, from long-term vaca-tion planning to daily dispatching and precise payroll accounting. The dispatcher is provided with optimal support via the automatic personnel allocation and mobile duty sign-on control functions, in which the per-sonnel can participate by entering individual preferences. -> Page 13

IVU. rail. vehicle

Plans and controls the entire vehicle deployment and monitors the individual run performances and service intervals. Track occupancies can be recorded in detail in stations and parking facilities, and shunting processes can be planned. -> Page 18

MANY TASKS.

ONE PRODUCT.

Plan efficiently with IVU. rail

Whether for personnel or vehicle deployment, IVU. rail efficiently manages all conceivable planning tasks. The system also incorporates the planner‘s operational rules and quality guidelines. With its fully- automated variation calculations, parameter analyses and intelligent algorithms, IVU. rail paves the way for dependable decision making. The possibility for using flexible cost weighting, operational stability and employee satisfaction guarantees optimised planning scenarios according to individual requirements. In addition, IVU. rail. plan provides an array of interfaces for follow-up systems and allows for the generation of various statistics and printouts.

Rapid and flexible dispatching with IVU. rail

The daily deployment of vehicles and personnel poses a challenge to dispatchers in long-distance, regional and city transport. Can duty roster scheduling be optimised in such a way that employee requests, legal regulations and commercial aspects are taken into consideration? Have any train drivers called in sick? Have the vehicles been deployed in accord-ance with the service interval guidelines from the maintenaccord-ance workshop? IVU‘s dispatching systems indicate which resources are currently in use and where. Thus, railway companies can quickly react to unpredictable events in a flexible manner, e. g. they can switch out personnel or deploy replacement vehicles. This flexibility provided by IVU. rail. crew and IVU. rail. vehicle is of utmost importance in order to ensure smooth trans-port and quality services for the passengers, without losing sight of the costs involved.

(4)

6 7

IVU. rail for MÁV in Hungary

Personnel and vehicle dispatching for 1,000 locomotives in passenger and freight transport. Centralisation of planning and dispatching processes, which were previ-ously divided across various locations. Early recognition of delays in freight transport via incorporation of the vehicle location system.

IVU. rail for Trenitalia

Duty scheduling, optimisation and dispatching for over 20,000 train drivers and train conductors in passenger and freight transport across all of Italy. Company-wide data integration for long-distance and regional transport, the creation of timetable booklets and the provision of data for booking and reservation systems.

IVU. rail for CP in Portugal

375 vehicles and 1,500 employees are planned and optimised on a route network of 2,830 km. Integration of IVU. rail into the existing system landscape from infrastructure planning and personnel dispatching via standardised interfaces.

IVU. rail for VR in Finland

With 19 tracks, 310 long-distance trips and around 890 commuter trips a day, Helsinki is one of Europe‘s largest dead-end stations. Trains pull in and out of the station every minute. If delays occur, then it is imperative that open track sections be located and waiting trains rerouted as quickly as possible.

IVU. rail for the Swiss Federal Railways SBB

Duty scheduling and dispatching for more than 6,500 locomotive drivers and train conductors using a further developed version of IVU. rail. crew. Over 200 users at SBB work at 21 different locations throughout Switzerland and must be able to access all of the data simultaneously in three different languages.

OUR CLIENTS.

Standardisation and individuality.

IVU. rail is tried and tested and has been implemented by railway compa-nies around the world. IVU. rail was developed in close cooperation with leading European railway operators and is the only standard product that supports complete and integrated resource planning. At the same time, IVU.rail is integrated into the existing environment and can be adjusted to individual needs. This is facilitated in the system by the flexible param-eterisation of rule systems, interfaces and printouts. Project implementa-tions, which in the past might have taken several years, can now often be completed in only a few months.

IVU. rail for Deutsche Bahn AG (German Railways)

Rostering for the commuter rail in Munich, Rhine Neckar, Rhine-Main (Frankfurt), Hamburg and Berlin and over 20 regional bus companies of DB Regio AG.

(5)

IVU.

rail.

plan

OPTIMISING LIMITED

RESOURCES.

A stable timetable that meets demand and requires as few personnel and vehicles as possible – this is a challenge for railway companies everywhere, and optimisation here offers the greatest potential for improving efficiency.

The planners face the difficult task of taking into consideration client requests, vehicle equipment, labour-law provisions, special incidents, such as roadworks or sporting events, and much more – and all of this on a real-time basis. At the same time, however, the planner must provide for an operation that is as economically viable as possible. This is hardly conceivable without technical support, since the creation and evaluation of timetable planning, vehicle working scheduling and duty scheduling scenarios according to specified criteria is fundamental for optimal planning.

Depending on capacity demands, train formations must be assembled together and split apart. When doing so, the entire planning occurs in an integrated manner, taking into consideration existing company supplies, special equipment, available personnel, qualifications, legal and labour-law-related provisions, passenger counts and predefined rule checks.

“IVU.rail has already been used for many years by DB Regio in the integrated resource planning and dispatching project for commuter rail operations. The highly-inte-grated processing and the corre-sponding optimisation parameters allow for an immediate reaction to short-term timetable changes that, for example, are caused by the additional ordering of special services and unscheduled track works throughout the year.”

Dr. Frank Scholz

CIO DB Regio AG

(6)

MSTH-E (40)

MSTH-E (40)

MSTH-E (40)

S2 (37)

S2 (52)

MSTH-A (17) MSTH-A (37) MSTH-A (57) MSTH-A (17) MSTH-A (37) MSTH-A (57)

MSTH-E (00)

MSTH-E (20)

MSTH-E (00)

MSTH-E (20)

MFRA-E (41)

MFRA-E (11) MFRA-E (19)

MFRA-E (25)

45

05

47

07

27

47

07

27

47

07

27

47

07

27

47

07

27

47

07

47

07

080

480

280

080

480

280

080

480

280

480

280

080

480

280

080

080

480

280

27

106

25

46

06

26

46

06

26

46

06

26

46

06

26

46

06

26

46

06

26

46

06

34

38

108

34

37

39

40

42

43

38

37

45

45

36 44

108

34

37

39

38

40

42

43

38

37

45

45

36 44

107

34

37

39

38

40

42

43

38

37

45

45

36 44

115

34

37

39

38

40

42

43

38

37

45

45

36 44

107

34

37

39

38

40

42

43

38

37

45

45

36 44

103

34

37

39

38

40

42

43

38

37

45

45

36 44

122

34

37

39

38

40

42

43

38

37

45

45

36 44

57

56

59

58

90

02

03

05

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28 32

31

34

280

27

2629

28

31

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

16

21

21

24

24

25

160

114

115

27

105

29

32

104

3538

12

10

07

04

50

59

1518 23

24

30

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

47

48 52

4649 54

51

460

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

07

0609

08 12

11

080

14

107

34

17

16

19

24

22

16

17

16

20

30

23

25

17

16

19

22

20

30

23

25

115

34

17

16

19

24

22

16

17

16

20

30

23

25

612

34

17

16

19

24

22

16

17

16

20

30

23

25

103

34

17

16

19

24

22

16

17

16

20

30

23

25

34

17

16

19

24

22

16

17

16

20

30

23

25

34

17

16

19

24

22

16

17

16

20

30

23

25

105

34

17

16

19

24

22

16

17

16

20

30

23

25

107

34

17

16

19

24

22

16

17

16

20

30

23

25

106

34

57

56

04

59

58

90

02

03

56

57

56

05

106

34

57

56

04

59

58

90

02

03

56

57

56

05

106

34

57

56

04

59

58

90

02

03

56

57

56

05

108

34

57

56

04

59

58

90

02

03

56

57

56

05

109

34

57

56

04

59

58

90

02

03

56

57

56

05

106

34

57

56

04

59

58

90

02

03

56

57

56

05

612

34

57

56

04

59

58

90

02

03

56

57

56

05

25

45

05

25

45

05

25

45

05

25

45

05

25

45

05

25

45

05

122

103

117

105

122

612

107

118

106

117

103

109

107

12

32

52

12

32

52

12

32

52

12

32

52

12

32

52

12

612

612

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

36

3538 44

48

41

41

35

45

44

47

48

38

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

56

5558 84

01

01

58

54

55

52

49

50

52

47

108

05

04

07

104

44

46 5253

54

51

44

46 5253

54

51

44

46 5253

54

51

44

46 5253

54

51

44

46 5253

54

51

44

46 5253

54

51

44

46 5253

54

51

04

108

104

103

00

01

06

11

12

13

14

04

06

11

12

13

14

04

06

11

12

13

14

04

06

11

12

13

14

04

06

11

12

13

14

04

06

11

12

13

14

04

06

11

12

13

14

04

24

111

20

21

26

31

32

33

34

24

26

31

32

33

34

24

26

31

32

33

34

24

26

31

32

33

34

24

26

31

32

33

24

26

31

32

33

24

44

114

40

41

44

123

40

41

44

110

40

41

44

106

40

41

44

103

40

41

44

117

40

41

24

119

20

21

04

118

00

01

04

513

00

01

04

113

116

612

103

00

01

04

122

00

01

04

110

00

01

04

106

00

01

108

111

114

118

119

123

113

103

110

113

116

106

122

612

103

110

103

117

24

103

20

21

107

109

103

117

106

122

612

107

109

101

105

121

107

109

116

105

MSTH-E (40) MSTH-E (40) MSTH-E (40)

S2 (37) S2 (52)

MSTH-A (17) MSTH-A (37) MSTH-A (57) MSTH-A (17) MSTH-A (37) MSTH-A (57)

MSTH-E (00) MSTH-E (20) MSTH-E (00) MSTH-E (20)

MFRA-E (41) MFRA-E (11) MFRA-E (19) MFRA-E (25)

45 05 47 07 27 47 07 27 47 07 27 47 07 27 47 07 27 47 07 47 07 080 480 280 080 480 280 080 480 280 480 280 080 480 280 080 080 480 280 27 106 25 46 06 26 46 06 26 46 06 26 46 06 26 46 06 26 46 06 26 46 06 34 38 108 34 37 39 4042 43 38 37 45 45 36 44 108 34 37 3938 4042 43 38 37 45 45 36 44 107 34 37 3938 4042 43 38 37 45 45 36 44 115 34 37 3938 4042 43 38 37 45 45 36 44 107 34 37 3938 4042 43 38 37 45 45 36 44 103 34 37 3938 4042 43 38 37 45 45 36 44 122 34 37 3938 4042 43 38 37 45 45 36 44 5756 59 5890 02 03 05 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 2831 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 30 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 107 34 17 16 19 24 22 16 17 16 20 30 23 25 17 16 19 22 20 30 23 25 115 34 17 16 19 24 22 16 17 16 20 30 23 25 612 34 17 1619 24 22 16 17 16 20 30 23 25 103 34 17 1619 24 22 16 17 16 20 30 23 25 34 17 1619 24 22 16 17 16 20 30 23 25 34 17 1619 24 22 16 17 16 20 30 23 25 105 34 17 1619 24 22 16 17 16 20 30 23 25 107 34 17 1619 24 22 16 17 16 20 30 23 25 106 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 108 34 5756 04 59 5890 02 03 56 57 56 05 109 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 612 34 5756 04 59 5890 02 03 56 57 56 05 25 45 05 25 45 05 25 45 05 25 45 05 25 45 05 25 45 05 122 103 117 105 122 612 107 118 106 117 103 109 107 12 32 52 12 32 52 12 32 52 12 32 52 12 32 52 12 612 612 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 104 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 04108 104 103 00 01 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 1112 13 14 04 06 1112 13 14 04 24111 20 21 26 313233 34 24 26 313233 34 24 26 313233 34 24 26 313233 34 24 26 313233 24 26 313233 24 44114 40 41 44123 40 41 44110 40 41 44106 40 41 44103 40 41 44117 40 41 24119 20 21 04118 00 01 04513 00 01 04113 116 612 103 00 01 04122 00 01 04110 00 01 04106 00 01 108 111 114 118 119 123 113 103 110 113 116 106 122 612 103 110 103 117 24103 20 21 107 109 103 117 106 122 612 107 109 101 105 121 107 109 116 105 10 11

IVU.

rail.

plan

TIMETABLE PLANNING

AT A GLANCE.

IVU. rail. plan manages the entire route network and develops available timetable services, from strategic planning to date-specific exceptions. The system plans all train formations and integrates track occupancies, parking actions and maintenance planning.

Supply planning

From the long-term yearly timetable to short-term changes Data transfer from track planning systems in the standard

railML format (www.railml. org) Compilation and revision of timetables

Trains and vehicle workings

Combining trains and connecting them to vehicle working sequences Automatic calculation of the position and orientation

of a vehicle in the train formation

Consideration of vehicle types, service intervals and layover times in vehicle working scheduling

Shunting and parking

Track-specific shunting and parking in the train station or in the parking facility

Consideration of track and depot capacities (restrictions) Planning service blocks (refuelling, cleaning, maintenance) Preplanning maintenance capacities and workshop workloads

(7)

IVU.

rail.

crew

THE RIGHT EMPLOYEE.

THE RIGHT PLACE.

THE RIGHT TIME.

Which train driver is driving which train today? Different vehicles, equipment and routes require appropriate qualifications. In addition, working time regulations, operational provisions and vacation / day-off requests must be considered in duty scheduling. Therefore, vehicle and personnel dispatching should be integrated in order to achieve the optimal deployment of resources.

Once the duties have been planned, the dispatcher must check duty sign-ons, find any replacements as quickly as possible for cancellations due to sickness or delays and prepare all of the data for payroll accoun-ting. These tasks would be almost impossible without software support. The dispatcher is provided with optimal support by means of the auto-matic personnel allocation and the mobile duty sign-on control functions. Clear displays provide a current picture of the duties for which an

employee actually signed on. Aside from manually entering this data, the registered times can also be evaluated by card readers and stationary or mobile devices.

By entering their individual preferences, the driving personnel also take part in duty scheduling. Requests can be entered via terminals, mobile devices or the Internet – just like duty queries and signing on and off. During duty allocation, the automatic personnel dispatching is used to keep the employee‘s work time accounts balanced, considering the employee‘s requests and creating fair duty schedules. Absences, due to vacation or sickness for example, are also considered in the process, as well as the qualifications of the respective employees. In order to guarantee a continuous flow of data, IVU. rail. crew contains standardised interfaces to all known HR management systems.

“With the further development of IVU. rail we have reached a new level of transparency and flexibility in duty schedule planning and optimisation. Thanks to IVU. rail it is now possible to cover all duty forms and find the best possible solution. With the help of the vehicle scheduling program that is currently being imple-mented, all resources will soon be planned in one integrated step, boosting our productivity in a sustainable manner.”

Mauro Natali

Production Manager for Regional Transport TRENITALIA

(8)

07.05.12 M ZC

0/2

08.05.12 Ti-To ZC

0/1

09.05.12 Ti-To ZC

0/0

W19/12

10.05.12 Ti-To ZC

0/0

09.05.12 Ti-To ZC

134

13805 13805 13865 14415 14415 13410 13410 14770 14770 13876 13876 14400 14400 12440 12440 16798 16798 13710 13710 16460 16460 13710 13710 14770 14770 13876 13876 11710 11710 16799 16799 13610 13610 11810 11810 12640 12640 13835 13835 13441 13441 11830 11830 16797 16797 16797 16797 11690 07:21 05:57 15:50 22:45 04:46 10:05 19:58 05:25 11:27 19:20 03:26 03:09 17:32 08:04 01:39 17:04 09:53 05:02 23:00 15:21 06:21 07:28 15:21 23:00 05:01 10:01 16:01 23:00 05:01 10:01 16:49 20:43 03:07 09:32 15:46 20:04 13:51 06:27 00:20 15:34 09:32 03:07 20:43 16:49 10:39 04:57 22:51 14:16 06:27 09:32 15:50 09:42 15:50 19:58 05:25 11:27 19:20 03:09 09:32 15:46 00:54 07:01 16:00 11513 11513 1493 1673 11553 11553 1413 1413 1673 1493 11690 11510 1433 14650 14650 13835 13815 14610 13835 11710 11710 12620 12640 11810 12620 13420 13420 11690 11690 14650 14650 13865 13835 13835 13620 13620 13691 13691 27:26 67:44 14750 14750 13815 13815 13540 13540 21:52 26:04 18:57 18:07 9:45 12:16 12:16 18:39 04:24 10:39 04:46 10:05 18:12 03:25 03:11 08:58 03:09 09:32 14:27 09:28 05:02 04:32 10:36 06:20 12:50 16:44 11:08 16:32 03:40 08:58 20:04 05:02 21:05 13:49 03:26 09:42 42:50 09:53 06:58 15:13 18:53 17:42 12:35 21:51 23:23 13:23 12:46 19:09 20:52 16:01 23:00 20:58 19:58 :22 03:35 10:02 5:58 16:00 20:00 9:32 05:32 10:01 19:00 05:01 10:01 17:06 18:03 13:28 22:54 46:33 21:27 28:30 09:32 03:44 09:39 07:31 13:30 15:34 23 12760 D D 12760 P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST 14790 14790 14590 13441 13441 13610 13610 16460 16460 14590 13460 13460 14420 14420 12570 12570 13650 D 13650 Semester 09.05.2012 – 12.05.2012 Sjuk 10.05.2012 F 08.05.2012 – 09.05.2012 F 08.05.2012 F 09.05.2012 12670 12670 13590 13590 13420 13420 14400 14400 13710 13710 12510 12510 12420 12420

07.05.12 M ZC

39

08.05.12 Ti-To ZC

133

W19/12

10.05.12 Ti-To ZC

133

07.05.12 M ZC

0/2

08.05.12 Ti-To ZC

0/1

09.05.12 Ti-To ZC

0/0

W19/12

10.05.12 Ti-To ZC

0/0

09.05.12 Ti-To ZC

134

13805

13805

13865

14415

14415

13410

13410

14770

14770

13876

13876

14400

14400

12440

12440

16798

16798

13710

13710

16460

16460

13710

13710

14770

14770

13876

13876

11710

11710

16799

16799

13610

13610

11810

11810

12640

12640

13835

13835

13441

13441

11830

11830

16797

16797

16797

16797

11690

07:21

05:57

15:50

22:45

04:46

10:05

19:58

05:25

11:27

19:20

03:26

03:09

17:32

08:04

01:39

17:04

09:53

05:02

23:00

15:21

06:21

07:28

15:21

23:00

05:01

10:01

16:01

23:00

05:01

10:01

16:49

20:43

03:07

09:32

15:46

20:04

13:51

06:27

00:20

15:34

09:32

03:07

20:43

16:49

10:39

04:57

22:51

14:16

06:27

09:32

15:50

09:42

15:50

19:58

05:25

11:27

19:20

03:09

09:32

15:46

00:54

07:01

16:00

11513

11513

1493

1673

11553

11553

1413

1413

1673

1493

11690

11510

1433

14650

14650

13835

13815

14610

13835

11710

11710

12620

12640

11810

12620

13420

13420

11690

11690

14650

14650

13865

13835

13835

13620

13620

13691

13691

27:26

67:44

14750

14750

13815

13815

13540

13540

21:52

26:04

18:57

18:07

9:45

12:16

12:16

18:39

04:24

10:39

04:46

10:05

18:12

03:25

03:11

08:58

03:09

09:32

14:27

09:28

05:02

04:32

10:36

06:20

12:50

16:44

11:08

16:32

03:40

08:58

20:04

05:02

21:05

13:49

03:26

09:42

42:50

09:53

06:58

15:13

18:53

17:42

12:35

21:51

23:23

13:23

12:46

19:09

20:52

16:01

23:00

20:58

19:58

:22

03:35

10:02

5:58

16:00

20:00

9:32

05:32

10:01

19:00

05:01

10:01

17:06

18:03

13:28

22:54

46:33

21:27

28:30

09:32

03:44

09:39

07:31

13:30

15:34

23

12760

D

D

12760

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

P-CST

14790

14790

14590

13441

13441

13610

13610

16460

16460

14590

13460

13460

14420

14420

12570

12570

13650

D

13650

Semester 09.05.2012 – 12.05.2012

Sjuk 10.05.2012

F 08.05.2012 – 09.05.2012

F 08.05.2012

F 09.05.2012

12670

12670

13590

13590

13420

13420

14400

14400

13710

13710

12510

12510

12420

12420

07.05.12 M ZC

39

08.05.12 Ti-To ZC

133

W19/12

10.05.12 Ti-To ZC

133

14 15

IVU.

rail.

crew

SATISFIED DISPATCHERS

AND EMPLOYEES.

IVU. rail. crew manages the entire personnel deployment, from long-term vacation planning to daily dispatching and precise payroll accounting. The dispatcher is provided with optimal support with the automatic personnel allocation and mobile duty sign-on control functions, while the personnel are involved by entering their individual preferences.

Efficient and rule compliant duties

Automatic duty proposals and optimisation User-definable labour and work-time regulations

Planning of on-board personnel (train drivers, train conductors) and stationary personnel (shunters, train dispatchers, supervisors etc.) Integrated multiple crewing with user-definable rule system

Long-term preliminary planning

Long-term vacation and roster planning

Weekly template optimisation for an equitable distribution of employee activities

Planning on the basis of shift classes and concrete duties

Allocating and accounting

Employee participation via shift classes, duty requests and vacation requests

Automatic personnel dispatching on the basis of qualifications and employee accounts

Online communication with driving personnel via mobile devices Transfer of actual data to payroll accounting

(9)

9016 9257 9236 9827 9022 9273 9248 9033 9028 9283 9258 9291 9034 9297 9274 9051 9307 9280 9313 9290 9323 9298 9331 9337 9310 93539326 9361 9334 93779348 9383 9356 9372 9407 9380 9427 9084 94049107 94439092 9679 9686 9675 9844 9840 9839 983687 9087 9837 9661 9668 9657 9664 9655 9662 9651 965860082 9649 82 9656 9645 9652 9823 71 69118 9643 9824 9827 60272 27262002 45 35 30 60274 274 60222 80 43 222 60162 162 60224 224 60266 60160 60226 9644 68100 104 60232 946 69 84 8314 944 979 8465 232 165 61165 69107 230 60230 8908 61979 8213 842 238 672813140 8471 8325 8318 8458 8323 8310 8436 8317 8304 8627 8662 8687 8670 8697 8678 8705 87118694 8721 8702 8066 8464 8327 8326 8481 8331 948 62948 8328 8472 8485 8333 8476 8491 8332 8335 8482 8493 8334 8337 8486 8457 8492 8499 8494 8498 8505 8500 8507 8346 6900 8511 8353 8513 8357 8504 8506 8515 8352 8348 8502 8837 8822 8845 8832 8159 8826 84468843 8440 8432 8825 8804 87988131 8790 8427 8784 8776 8766 8760 8754 8744 8734 8085 8726 8712 8949 8079 8689 8095 8101 8109 8113 8117 8139 8833 8849 81658152 8151 8820 8816 8831 88218808 8812 8819 8428 8815 8800 83478344 8807 8342 8799 8783 8338 8787 8336 8495 8777 8756 8771 8763 8755 8747 8722 8077 8279 8475 8730 8738 8748 8764 8341 8772 8343 8778 8788 8345 8784 8814 8818 8803 8444 8440 84028789 87638886 8775 8888 8765 8986 84558080 8070 8070 8706 8069 8666888 8065 80578048 8056 80718684 885 8061 8055 8046 8693 8574 8051 8042 8047 8041 8026 8045 80378028 8672 8668 8546 8652 8665 8031 8022 8665 8650 8036 8693 8566 8025 8038 8032 8688 8745 0949 8858 8062 8733 8071 8753 80738743 8737 8716 8797 9145 8501 950 8463 102 228 60228 945 85 42 3 84 47 70 6204 8466 60047 6900 62946 947 8324 60169 462084 60949 62070 40 226 2 44 60044 31441 8436 9832 9831 9670 9663 9674 9667 9676 9669 9680 9673 9682 9847 69126 61007 60048 34 108 61109 61173 956 955 954 62952 952 951 168 73 169 949 953 170 74 60074 60005 60032 32 5 958 6 89 174 6217017391003 9843 69120 60049 107 46 49 48 9402 9428 9394 9088 9433 9408 9304 93929419 9384 9411 9378 93709393 9362 9387 9354 9379 93469371 9338 9365 9332 9355 9324 9314 9341 9308 9333 93009325 9820 92929317 9309 9059 9303 9040 98559276 9299 9036 90439260 9293 9032 9287 90399254 9279 9026 90319244 9265 9020 90259232 9023 9631 9819 69116 9639 9648 69111 9018 9259 9238 9029 9024 9277 9250 9035 9030 9266 9847 9285 9347 9493 9417 9388 9369 9342 9391 9366 9401 9345 9318

9016

9257

9236

9827

9022

9273

9248

9033

9028

9283

9258

9291

9034

9297

9274

9051

9307

9280

9313

9290

9323

9298

9331

9337

9310

9353

9326

9361

9334

9377

9348

9383

9356

9372

9407

9380

9427

9084

9404

9107

9443

9092

9679

9686

9675

9844

9840

9839

9836

87

9087

9837

9661

9668

9657

9664

9655

9662

9651

9658

60082

9649

82

9656

9645

9652

9823

71

69118

9643

9824

9827

60272

272

62002

45

35

30

60274

274

60222

80

43

222

60162

162

60224

224

60266

60160

60226

9644

68100

104

60232

946 69

84

8314

944

979

8465

232

165

61165

69107

230

60230

8908

61979

8213

842

238

67281

3140

8471

8325

8318

8458

8323

8310

8436

8317

8304

8627

8662

8687

8670

8697

8678

8705

8711

8694

8721

8702

8066

8464

8327

8326

8481

8331

948

62948

8328

8472

8485

8333

8476

8491

8332

8335

8482

8493

8334

8337

8486

8457

8492

8499

8494

8498

8505

8500

8507

8346

6900

8511

8353

8513

8357

8504

8506

8515

8352

8348

8502

8837

8822

8845

8832

8159

8826

8446

8843

8440

8432

8825

8804

8798

8131

8790

8427

8784

8776

8766

8760

8754

8744

8734

8085

8726

8712

8949

8079

8689

8095

8101

8109

8113

8117

8139

8833

8849

8165

8152

8151

8820

8816

8831

8821

8808

8812

8819

8428

8815

8800

8347

8344

8807

8342

8799

8783

8338

8787

8336

8495

8777

8756

8771

8763

8755

8747

8722

8077

8279

8475

8730

8738

8748

8764

8341

8772

8343

8778

8788

8345

8784

8814

8818

8803

8444

8440

8402

8789

8763

8886

8775

8888

8765

8986

8455

8080

8070

8070

8706

8069

8666

888

8065

8057

8048

8056

8071

8684

885

8061

8055

8046

8693

8574

8051

8042

8047

8041

8026

8045

8037

8028

8672

8668

8546

8652

8665

8031

8022

8665

8650

8036

8693

8566

8025

8038

8032

8688

8745

0949

8858

8062

8733

8071

8753

8073

8743

8737

8716

8797

9145

8501

950

8463

102

228

60228

945

85

42

3

84

47

70 6204

8466

60047

6900

62946

947

8324

60169

462084

60949

62070

40

226

2

44

60044

31441

8436

9832

9831

9670

9663

9674

9667

9676

9669

9680

9673

9682

9847

69126

61007

60048

34

108

61109

61173

956

955

954

62952

952

951

168

73

169

949

953

170

74

60074

60005

60032

32

5

958

6

89

174

62170

173

91003

9843

69120

60049

107

46

49

48

9402

9428

9394

9088

9433

9408

9304

9392

9419

9384

9411

9378

9370

9393

9362

9387

9354

9379

9346

9371

9338

9365

9332

9355

9324

9314

9341

9308

9333

9300

9325

9820

9292

9317

9309

9059

9303

9040

9855

9276

9299

9036

9043

9260

9293

9032

9287

9039

9254

9279

9026

9031

9244

9265

9020

9025

9232

9023

9631

9819

69116

9639

9648

69111

9018

9259

9238

9029

9024

9277

9250

9035

9030

9266

9847

9285

9347

9493

9417

9388

9369

9342

9391

9366

9401

9345

9318

16 17

MAKING

COMPLEXITY

MANAGEABLE

IVU makes integrated resource planning possible and easy

(10)

18 19 “With IVU. rail, we were able to

centralise the planning of personnel and vehicle deployment for all of Hungary. The integration of the actual data from our vehicle loca-tion system helps our dispatchers to react quickly to planning devia-tions and to reduce their effects on following trips.”

Ferenc Márton

Chief Operations Officer MÁV Hungarian State Railways

IVU.

rail.

vehicle

DISPATCHING

ROLLING STOCK.

Once the timetable and vehicle working schedule have been created, the dispatchers are faced with the challenge of organising the vehicle deployment as efficiently as possible. Vehicle management is particularly complicated in rail transport. Train formations may be split and continued as separate services, or vehicle groups may be removed or added. Such reconfigurations are all part of the dispatchers‘ everyday work.

IVU. rail. vehicle plans and controls the entire vehicle deployment in passenger and freight transport. The run performances and service intervals of the individual vehicles are monitored continuously and exchanged with the maintenance workshop systems via online interfaces. The detailed depiction of the parking facilities helps to pre-plan shunting procedures.

During operations, the dispatcher must react quickly to any changes like delays and cancellations. IVU. rail. vehicle supports this with the planned and actual displays and the calculation of arrival prognoses, including their effects on layover times and following trips.

When doing so, the dispatcher must be careful to consider vehicle equipment and conditions, integrate special trains, plan maintenance actions, relay and assign open parking spaces and take into account personnel allocations. Therefore, modern dispatching systems should give an overview of which vehicle is currently deployed and with which crew.

(11)

001

002

003

004

006

007

008

009

010

012

013

014

015

2101

2108

2103

6413/20

2103

225

116

120

T

001

002

003

004

006

007

008

009

010

012

013

014

015

2101

2108

2103

6413/20

2103

225

116

120

T

20 21

IVU.

rail.

vehicle

EVERY VEHICLE IN ITS

CORRECT LOCATION.

IVU. rail. vehicle plans and controls the entire vehicle deployment, from long-term maintenance planning to the current timetable situation. IVU. rail. vehicle monitors individual run performances and service intervals. Track occupancies can be recorded in detail in stations and parking facilities, and shunting processes can be planned.

Optimising vehicle workings

Planning locomotives, multiple units and passenger coaches Vehicle working optimisation taking operating rules into account

Managing maintenance and operations

Pre-planning the maintenance window for the optimal utilisation of vehicles and maintenance workshops

Monitoring run performances and service intervals

Dispatching parking facilities and maintenance workshop transfers

Reacting to disruptions

Displaying vehicle positions in real-time, analysing the effects on subsequent trips

Maintain all delays and cancellations in view

Monitor pull-out and pull-in trips and vehicles‘ parking locations Find and allocate replacement vehicles, integrate short-term

(12)

22 23 „There is significant enhancement

in local public transport. ZIB and IVU combine mathematical research with engineering

expertise and practical experience in order to tap this potential.“

Prof Martin Grötschel

Vice President of Konrad-Zuse-Zentrum for Information Technologies in Berlin (ZIB)

IVU.

rail

OPTIMISATION AS

EFFICIENCY ENGINE.

Quick calculation of complex scenarios

Attain the best results while observing all requests – that is the job of the optimisation. If you are looking for the shortest path between two points, then the solution is fairly simple. However, if you wish to find the fastest travel path for a multitude of points while considering all of the boundary conditions, then optimisation turns into a highly-complicated arithmetic problem. Multi-layered automation tasks and decision-making processes can only be solved with IT and mathematics. Therefore, IVU cooperates with the “Optimisation” department of the Konrad Zuse Institute in Berlin (ZIB) for the development of optimisation components.

The optimisation of personnel and vehicle deployment is especially challenging. Thousands of duty elements must be combined into as few duties as possible within a short period of time. When doing so, all hard and soft rules for work time, breaks, qualifications, fares, travel paths and capacities must be observed. Therefore, the optimisation relies on a comprehensive database and complete rule systems. When examin-ing existexamin-ing systems in the course of optimaisation projects we are often able to identify invalid vehicle workings and duties.

The fine tuning of optimisation parameters, especially for larger scenar-ios, is a very complex and challenging task. The complete integration of the rule system ensures that the computed vehicle workings and duties conform to the rules and can be directly adopted into the operation. This optimises resource deployment and at the same time accelerates the planning processes while providing more flexibility.

(13)

IVU.

rail

AUTOMATION AND

OPTIMISATION.

Increased efficiency with the optimisation tools from IVU. rail by combining mathematical research with engineering know-how and hands-on experience.

Duty optimisation

Consider work-time rules and labour agreements, as well as soft operational constraints

Guarantee complete scheduling of all duty elements Incorporate qualification and capacity guidelines Consider multiple crewing / teams

Vehicle working optimisation

Consider service intervals, maintenance cycles and infrastructure capacities

Ensure uniform distribution of performance over a longer period of time

Create robust run schedules while simultaneously minimising required vehicles and necessary non-revenue trips

Weekly template optimisation

Reduce variations during the week with fewer overtime hours or sub-performances

Better distribution of days off and undesirable duties (e. g. late duties or split duties)

Acceleration of the entire planning process

Automatic personnel dispatching

Observe qualifications, capacities and rule systems Keep employee accounts balanced and allocate fairly Consider individual employee requests

(14)

26 27 “The products of the IVU. suite

have enabled us to develop a modern transport system in Santiago de Cali within the shortest possible space of time. This has had a positive impact on the quality of life and the cityscape.”

Luis Eduardo Barrera

President of Metro Cali S. A.

IVU. 30 YEARS

OF EXPERIENCE.

Our IVU. suite provides support for all task areas of a transport company and allows for integrated solutions with a single product: from planning and dispatching via operation management, to ticketing and passenger information, as well as settling transport contracts.

IVU systems plan routes, deploy buses and trains, provide passengers with information, ensure transfer connections, dispatch drivers, monitor fleets, sell tickets, combine data and increase efficiency. Whether you are looking for a complete solution or individual components – our products are based on open standards and can be integrated easily into a wide range of system environments.

Approximately 350 employees at eight locations, in seven countries and countless projects develop software, advise clients, work on new concepts, implement systems and optimise workflows. Our strength is quite evidently based on the performance, knowledge, motivation and personalities of the people who work at IVU.

CONTROLLING PLANNING FLEET

MANAGEMENT TICKETING PASSENGER INFORMATION

IVU.box IVU.validator

IVU.control

IVU.plan IVU.fleet IVU.fare IVU.realtime

IVU.pool

DISPATCHING IVU.vehicle

(15)

IVU IN USE AROUND

THE WORLD.

A growing community of clients ensures the continued development of IVU. rail. An exchange of information between the users is

encouraged, for example by means of user groups.

IVU. rail is currently being used by the following railway companies, further details can be found on

-> Page 6 and at www. ivu. de.

DEPARTMENT OF PLANNING, TRANSPORT AND

INFRASTRUCTURE,

Adelaide (AU)

Central timetable planning system for buses and trains in the wider Adelaide area.

EUROPORTE,

France (FR)

Personnel and vehicle scheduling for punctual and flexible cargo transport with 75 locomotives.

VNR VIETNAM RAILWAYS, Vietnam (VN)

Planning, optimisation and operative control of vehicles and employees across the entire country, as well as real-time passenger information.

VEOLIA TRANSPORT,

Germany (DE)

Planning and dispatch for all rail and bus companies in Germany on a shared database at corporate headquarters.

RIYADH,

Saudi Arabia (SA)

Driverless metro

at the Princess Nora bint Abdulrahman University.

BANGKOK (TH), KUALA LUMPUR (MY)

Planning and dispatch for rapid transit train services.

STOCKHOLMSTåG,

Stockholm (SE)

Integrated resource planning for suburban rail operations with 160 trains, and interfaces to the network operator and the maintenance workshop.

IVU locations IVU references

(16)

30

ALL ADVANTAGES

AT A GLANCE.

IVU. rail is a standard product with a modular construction. The modules can be implemented individually, as a whole or in combination with other systems or individual developments. All modules run on a single data-base, with open interfaces to all common peripheral systems, e. g. from the fields of HR management or maintenance workshop management.

IVU. rail. plan

Network

planning

IVU. rail. plan

Timetable

planning

IVU. rail. plan

Duty

scheduling

IVU. rail. crew

Roster

layout

IVU. rail. crew

Personnel

dispatch

IVU. rail. crew

Payroll

accounting

IVU. rail. plan

Vehicle

working

scheduling

IVU. rail. vehicle

Track

occupancy

IVU. rail. vehicle

Vehicle

dispatch

IVU. rail. vehicle

Vehicle

monitor

31

ivu. RAiL. PLAN

Network planning

Train stations and operating units Links and routes

Change of direction points Parking facilities

Any number of network point groups for regional assignments

Timetable planning

Editing in the graphical and tabular timetables Trip course and train formation building Sequence planning and vehicle orientation Footnotes and comments

Vehicle types and trip numbers

vehicle working scheduling

Link routes and transfer trips to vehicle workings Receive suggestions for appropriate following trips Consider train formations and changes of direction Pre-plan maintenance windows

Generate vehicle workings on the basis of parking actions Plan service blocks (refuelling, cleaning, maintenance) Vehicle scheduling over multiple days

Layover, buffer and preparation times

Duty scheduling

Configure duty, break & labour rules

Duty optimisation and adjustment optimisation Schedule additional duty elements

Automatic duty proposal

Travel path and passage trip search

Multiple crewing (train drivers, train conductors) Stationary personnel (shunters, train dispatcher, supervi-sors etc.)

Coupling performances, driver’s cabin changeover times, take overs/handovers

Generate additional duty pieces on the basis of the number of auxiliaries in the train formation Different duty rules for train conductors are possible Optimisation according to various crew types is possible

ivu. RAiL. CREw

Roster layout

Schematic and/or calendar-related planning Anonymous long-term preliminary planning Weekly template planning and optimisation Roster layout optimisation

User-definable roster layout rule system Shift class planning

Personnel dispatch

Automatic personnel dispatching

Consider requests, shift classes and accounts Report duty sign-on/off from mobile devices as well Online communication between train drivers/dispatcher User-definable dispatching levels

Qualification check and extension

Automatic account update (work time, weekly rest, etc.)

Payroll accounting

Connect HR systems (e. g. SAP, Peoplesoft) Profit centre splitting

Assessing planned and actual work times User-definable payroll rule system for all personnel timesheets User-definable payroll rule system for all wage agreements

ivu. RAiL. vEhiCLE

Track occupancy

Plan track occupancies in train stations and parking facilities

Consider track and depot capacities (restrictions) Consider station run order

Plan coupling procedures Supply planning

vehicle dispatch

Manage all vehicles

Monitor service intervals and run performances Connect to maintenance systems online Create special trips and transfer trips Process cancellations and disruptions Automatic vehicle parking

All parking facilities at a glance Short-term planning changes

vehicle monitor

Connect to vehicle location systems for actual data (vehicles, times, travel paths)

Difference of planned and actual data and delay prognoses

Support short-term disruption management Monitor pull-out and pull-in trips

Difference between planned and actual parking actions Direct control of passenger information

(17)

IVU Traffic Technologies AG Bundesallee 88 12161 Berlin Germany T + 49.30.859 06 -0 F + 49.30.859 06 -111 post@ivu. de www. ivu. de

References

Related documents

The committee directs the Secretary of Defense to provide the Committees on Armed Services of the Senate and the House of Representatives, 60 days prior to any change in policy,

Average burnout times for the chars of all the biomass fuels of this work (sugarcane bagasse (SCB), pine sawdust (PI), torrefied pine sawdust (TOPI and olive residue (OR)) burning

1 49 In the majority of cases, the courts did not so much compare the work of prosecutors to that of judges (demonstrably different kinds of tasks carried out by

Our definition is based on a model of service systems and the two main characteristics that differentiate between services and product functions: the designability of the

The LSWP required school districts to set goals for nutrition edu- cation, physical activity, all foods and beverages avail- able on campus, and school-based activities designed

This project studies the use of idioms in two undergraduate-level texts to identify the frequency and typology of such idioms, in order to assist post-secondary ESL teachers in

David Reed, “Oneness Pentecostalism: Problems and Possibili- ties for Pentecostal Theology,” Journal of Pentecostal Theology 11 (1997): 73-93; “Aspects of the Origins of