ivu.rail
iNTEGRATED
RESOuRCE
3
IVU MAKES INTEGRATED
RESOURCE PLANNING
POSSIBLE AND EASY.
All planning and dispatching processes
for personnel and vehicle deployment
in a universal system.
The deployment of the key resources “employees” and “vehicles” is a central component of rail operations. In the past, paper and pencil, as well as magnet boards were chiefly used for this purpose. Later on came computer programs that were tailored to individual procedural steps. This then led to the emergence of a heterogeneous system landscape made up of many individual software solutions. All of these parallel systems had to be meticulously linked together via interfaces. The redun-dancy of the processed data can lead to inconsistencies.
In addition, each of these systems must also be operated and maintained separately.
In recent years, the possibilities for IT support have increased significantly, both with regard to the amount of data processed and the functional complexity. Over more than 30 years, IVU Traffic Technologies AG has acquired a wealth of expertise in the field of planning and dispatching software. IVU. rail provides our clients with a standard solution that covers the planning and dispatching process in its entirety, from supply planning and operational implementation in predefined vehicle workings and duties to the daily dispatching of rolling stock and train drivers, train conductors and shunting personnel. For the first time, all planning processes have been consolidated in one system and in a single database.
In cooperation with leading railway companies, IVU. rail is continually being upgraded and adapted to technological advances. Additional optimi-sation components have been included over the past few years which are based on elaborate mathematical algorithms, but which, at the same time, take into consideration rules and parameters from manual planning to attain results that can be directly used for operations. This means that the processing time for the implementation of a new timetable can be drasti-cally shortened and the resources needed for such a procedure can be reduced.
IVU. rail. plan
Network
planning
IVU. rail. plan
Timetable
planning
IVU. rail. plan
Duty
scheduling
IVU. rail. crew
Roster
layout
IVU. rail. crew
Personnel
dispatch
IVU. rail. crew
Payroll
accounting
IVU. rail. plan
Vehicle
working
scheduling
IVU. rail. vehicle
Track
occupancy
IVU. rail. vehicle
Vehicle
dispatch
IVU. rail. vehicle
Vehicle
monitor
Integrated Resource Planning
IVU. rail. plan
Manages the entire route network and develops the timetable services available – from strategic planning to date-specific exceptions. By using intelligent algorithms, IVU. rail. plan optimises vehicle workings and duties, and at the same time considers any operational rules and guide-lines from the planner. -> Page 8
IVU. rail. crew
Manages the entire personnel deployment, from long-term vaca-tion planning to daily dispatching and precise payroll accounting. The dispatcher is provided with optimal support via the automatic personnel allocation and mobile duty sign-on control functions, in which the per-sonnel can participate by entering individual preferences. -> Page 13
IVU. rail. vehicle
Plans and controls the entire vehicle deployment and monitors the individual run performances and service intervals. Track occupancies can be recorded in detail in stations and parking facilities, and shunting processes can be planned. -> Page 18
MANY TASKS.
ONE PRODUCT.
Plan efficiently with IVU. rail
Whether for personnel or vehicle deployment, IVU. rail efficiently manages all conceivable planning tasks. The system also incorporates the planner‘s operational rules and quality guidelines. With its fully- automated variation calculations, parameter analyses and intelligent algorithms, IVU. rail paves the way for dependable decision making. The possibility for using flexible cost weighting, operational stability and employee satisfaction guarantees optimised planning scenarios according to individual requirements. In addition, IVU. rail. plan provides an array of interfaces for follow-up systems and allows for the generation of various statistics and printouts.
Rapid and flexible dispatching with IVU. rail
The daily deployment of vehicles and personnel poses a challenge to dispatchers in long-distance, regional and city transport. Can duty roster scheduling be optimised in such a way that employee requests, legal regulations and commercial aspects are taken into consideration? Have any train drivers called in sick? Have the vehicles been deployed in accord-ance with the service interval guidelines from the maintenaccord-ance workshop? IVU‘s dispatching systems indicate which resources are currently in use and where. Thus, railway companies can quickly react to unpredictable events in a flexible manner, e. g. they can switch out personnel or deploy replacement vehicles. This flexibility provided by IVU. rail. crew and IVU. rail. vehicle is of utmost importance in order to ensure smooth trans-port and quality services for the passengers, without losing sight of the costs involved.
6 7
IVU. rail for MÁV in Hungary
Personnel and vehicle dispatching for 1,000 locomotives in passenger and freight transport. Centralisation of planning and dispatching processes, which were previ-ously divided across various locations. Early recognition of delays in freight transport via incorporation of the vehicle location system.
IVU. rail for Trenitalia
Duty scheduling, optimisation and dispatching for over 20,000 train drivers and train conductors in passenger and freight transport across all of Italy. Company-wide data integration for long-distance and regional transport, the creation of timetable booklets and the provision of data for booking and reservation systems.
IVU. rail for CP in Portugal
375 vehicles and 1,500 employees are planned and optimised on a route network of 2,830 km. Integration of IVU. rail into the existing system landscape from infrastructure planning and personnel dispatching via standardised interfaces.
IVU. rail for VR in Finland
With 19 tracks, 310 long-distance trips and around 890 commuter trips a day, Helsinki is one of Europe‘s largest dead-end stations. Trains pull in and out of the station every minute. If delays occur, then it is imperative that open track sections be located and waiting trains rerouted as quickly as possible.
IVU. rail for the Swiss Federal Railways SBB
Duty scheduling and dispatching for more than 6,500 locomotive drivers and train conductors using a further developed version of IVU. rail. crew. Over 200 users at SBB work at 21 different locations throughout Switzerland and must be able to access all of the data simultaneously in three different languages.
OUR CLIENTS.
Standardisation and individuality.
IVU. rail is tried and tested and has been implemented by railway compa-nies around the world. IVU. rail was developed in close cooperation with leading European railway operators and is the only standard product that supports complete and integrated resource planning. At the same time, IVU.rail is integrated into the existing environment and can be adjusted to individual needs. This is facilitated in the system by the flexible param-eterisation of rule systems, interfaces and printouts. Project implementa-tions, which in the past might have taken several years, can now often be completed in only a few months.
IVU. rail for Deutsche Bahn AG (German Railways)
Rostering for the commuter rail in Munich, Rhine Neckar, Rhine-Main (Frankfurt), Hamburg and Berlin and over 20 regional bus companies of DB Regio AG.
IVU.
rail.
plan
OPTIMISING LIMITED
RESOURCES.
A stable timetable that meets demand and requires as few personnel and vehicles as possible – this is a challenge for railway companies everywhere, and optimisation here offers the greatest potential for improving efficiency.
The planners face the difficult task of taking into consideration client requests, vehicle equipment, labour-law provisions, special incidents, such as roadworks or sporting events, and much more – and all of this on a real-time basis. At the same time, however, the planner must provide for an operation that is as economically viable as possible. This is hardly conceivable without technical support, since the creation and evaluation of timetable planning, vehicle working scheduling and duty scheduling scenarios according to specified criteria is fundamental for optimal planning.
Depending on capacity demands, train formations must be assembled together and split apart. When doing so, the entire planning occurs in an integrated manner, taking into consideration existing company supplies, special equipment, available personnel, qualifications, legal and labour-law-related provisions, passenger counts and predefined rule checks.
“IVU.rail has already been used for many years by DB Regio in the integrated resource planning and dispatching project for commuter rail operations. The highly-inte-grated processing and the corre-sponding optimisation parameters allow for an immediate reaction to short-term timetable changes that, for example, are caused by the additional ordering of special services and unscheduled track works throughout the year.”
Dr. Frank Scholz
CIO DB Regio AG
MSTH-E (40)
MSTH-E (40)
MSTH-E (40)
S2 (37)
S2 (52)
MSTH-A (17) MSTH-A (37) MSTH-A (57) MSTH-A (17) MSTH-A (37) MSTH-A (57)
MSTH-E (00)
MSTH-E (20)
MSTH-E (00)
MSTH-E (20)
MFRA-E (41)
MFRA-E (11) MFRA-E (19)
MFRA-E (25)
45
05
47
07
27
47
07
27
47
07
27
47
07
27
47
07
27
47
07
47
07
080
480
280
080
480
280
080
480
280
480
280
080
480
280
080
080
480
280
27
106
25
46
06
26
46
06
26
46
06
26
46
06
26
46
06
26
46
06
26
46
06
34
38
108
34
37
39
40
42
43
38
37
45
45
36 44
108
34
37
39
38
40
42
43
38
37
45
45
36 44
107
34
37
39
38
40
42
43
38
37
45
45
36 44
115
34
37
39
38
40
42
43
38
37
45
45
36 44
107
34
37
39
38
40
42
43
38
37
45
45
36 44
103
34
37
39
38
40
42
43
38
37
45
45
36 44
122
34
37
39
38
40
42
43
38
37
45
45
36 44
57
56
59
58
90
02
03
05
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28 32
31
34
280
27
2629
28
31
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
16
21
21
24
24
25
160
114
115
27
105
29
32
104
3538
12
10
07
04
50
59
1518 23
24
30
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
47
48 52
4649 54
51
460
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
07
0609
08 12
11
080
14
107
34
17
16
19
24
22
16
17
16
20
30
23
25
17
16
19
22
20
30
23
25
115
34
17
16
19
24
22
16
17
16
20
30
23
25
612
34
17
16
19
24
22
16
17
16
20
30
23
25
103
34
17
16
19
24
22
16
17
16
20
30
23
25
34
17
16
19
24
22
16
17
16
20
30
23
25
34
17
16
19
24
22
16
17
16
20
30
23
25
105
34
17
16
19
24
22
16
17
16
20
30
23
25
107
34
17
16
19
24
22
16
17
16
20
30
23
25
106
34
57
56
04
59
58
90
02
03
56
57
56
05
106
34
57
56
04
59
58
90
02
03
56
57
56
05
106
34
57
56
04
59
58
90
02
03
56
57
56
05
108
34
57
56
04
59
58
90
02
03
56
57
56
05
109
34
57
56
04
59
58
90
02
03
56
57
56
05
106
34
57
56
04
59
58
90
02
03
56
57
56
05
612
34
57
56
04
59
58
90
02
03
56
57
56
05
25
45
05
25
45
05
25
45
05
25
45
05
25
45
05
25
45
05
122
103
117
105
122
612
107
118
106
117
103
109
107
12
32
52
12
32
52
12
32
52
12
32
52
12
32
52
12
612
612
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
36
3538 44
48
41
41
35
45
44
47
48
38
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
56
5558 84
01
01
58
54
55
52
49
50
52
47
108
05
04
07
104
44
46 5253
54
51
44
46 5253
54
51
44
46 5253
54
51
44
46 5253
54
51
44
46 5253
54
51
44
46 5253
54
51
44
46 5253
54
51
04
108
104
103
00
01
06
11
12
13
14
04
06
11
12
13
14
04
06
11
12
13
14
04
06
11
12
13
14
04
06
11
12
13
14
04
06
11
12
13
14
04
06
11
12
13
14
04
24
111
20
21
26
31
32
33
34
24
26
31
32
33
34
24
26
31
32
33
34
24
26
31
32
33
34
24
26
31
32
33
24
26
31
32
33
24
44
114
40
41
44
123
40
41
44
110
40
41
44
106
40
41
44
103
40
41
44
117
40
41
24
119
20
21
04
118
00
01
04
513
00
01
04
113
116
612
103
00
01
04
122
00
01
04
110
00
01
04
106
00
01
108
111
114
118
119
123
113
103
110
113
116
106
122
612
103
110
103
117
24
103
20
21
107
109
103
117
106
122
612
107
109
101
105
121
107
109
116
105
MSTH-E (40) MSTH-E (40) MSTH-E (40)
S2 (37) S2 (52)
MSTH-A (17) MSTH-A (37) MSTH-A (57) MSTH-A (17) MSTH-A (37) MSTH-A (57)
MSTH-E (00) MSTH-E (20) MSTH-E (00) MSTH-E (20)
MFRA-E (41) MFRA-E (11) MFRA-E (19) MFRA-E (25)
45 05 47 07 27 47 07 27 47 07 27 47 07 27 47 07 27 47 07 47 07 080 480 280 080 480 280 080 480 280 480 280 080 480 280 080 080 480 280 27 106 25 46 06 26 46 06 26 46 06 26 46 06 26 46 06 26 46 06 26 46 06 34 38 108 34 37 39 4042 43 38 37 45 45 36 44 108 34 37 3938 4042 43 38 37 45 45 36 44 107 34 37 3938 4042 43 38 37 45 45 36 44 115 34 37 3938 4042 43 38 37 45 45 36 44 107 34 37 3938 4042 43 38 37 45 45 36 44 103 34 37 3938 4042 43 38 37 45 45 36 44 122 34 37 3938 4042 43 38 37 45 45 36 44 5756 59 5890 02 03 05 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 28 3231 34 280 27 2629 2831 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 16 21 21 24 2425 160 114115 27105 29 32104 3538 12 10 07 04 5059 1518 2324 30 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 47 48 52 4649 54 51 460 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 07 0609 08 1211 080 14 107 34 17 16 19 24 22 16 17 16 20 30 23 25 17 16 19 22 20 30 23 25 115 34 17 16 19 24 22 16 17 16 20 30 23 25 612 34 17 1619 24 22 16 17 16 20 30 23 25 103 34 17 1619 24 22 16 17 16 20 30 23 25 34 17 1619 24 22 16 17 16 20 30 23 25 34 17 1619 24 22 16 17 16 20 30 23 25 105 34 17 1619 24 22 16 17 16 20 30 23 25 107 34 17 1619 24 22 16 17 16 20 30 23 25 106 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 108 34 5756 04 59 5890 02 03 56 57 56 05 109 34 5756 04 59 5890 02 03 56 57 56 05 106 34 5756 04 59 5890 02 03 56 57 56 05 612 34 5756 04 59 5890 02 03 56 57 56 05 25 45 05 25 45 05 25 45 05 25 45 05 25 45 05 25 45 05 122 103 117 105 122 612 107 118 106 117 103 109 107 12 32 52 12 32 52 12 32 52 12 32 52 12 32 52 12 612 612 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 36 3538 4448 41 41 35 45 44 47 48 38 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 56 5558 84 01 01 58 5455 52 4950 52 47 108 05 0407 104 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 4446 5253 54 51 04108 104 103 00 01 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 111213 14 04 06 1112 13 14 04 06 1112 13 14 04 24111 20 21 26 313233 34 24 26 313233 34 24 26 313233 34 24 26 313233 34 24 26 313233 24 26 313233 24 44114 40 41 44123 40 41 44110 40 41 44106 40 41 44103 40 41 44117 40 41 24119 20 21 04118 00 01 04513 00 01 04113 116 612 103 00 01 04122 00 01 04110 00 01 04106 00 01 108 111 114 118 119 123 113 103 110 113 116 106 122 612 103 110 103 117 24103 20 21 107 109 103 117 106 122 612 107 109 101 105 121 107 109 116 105 10 11
IVU.
rail.
plan
TIMETABLE PLANNING
AT A GLANCE.
IVU. rail. plan manages the entire route network and develops available timetable services, from strategic planning to date-specific exceptions. The system plans all train formations and integrates track occupancies, parking actions and maintenance planning.
Supply planning
From the long-term yearly timetable to short-term changes Data transfer from track planning systems in the standard
railML format (www.railml. org) Compilation and revision of timetables
Trains and vehicle workings
Combining trains and connecting them to vehicle working sequences Automatic calculation of the position and orientation
of a vehicle in the train formation
Consideration of vehicle types, service intervals and layover times in vehicle working scheduling
Shunting and parking
Track-specific shunting and parking in the train station or in the parking facility
Consideration of track and depot capacities (restrictions) Planning service blocks (refuelling, cleaning, maintenance) Preplanning maintenance capacities and workshop workloads
IVU.
rail.
crew
THE RIGHT EMPLOYEE.
THE RIGHT PLACE.
THE RIGHT TIME.
Which train driver is driving which train today? Different vehicles, equipment and routes require appropriate qualifications. In addition, working time regulations, operational provisions and vacation / day-off requests must be considered in duty scheduling. Therefore, vehicle and personnel dispatching should be integrated in order to achieve the optimal deployment of resources.
Once the duties have been planned, the dispatcher must check duty sign-ons, find any replacements as quickly as possible for cancellations due to sickness or delays and prepare all of the data for payroll accoun-ting. These tasks would be almost impossible without software support. The dispatcher is provided with optimal support by means of the auto-matic personnel allocation and the mobile duty sign-on control functions. Clear displays provide a current picture of the duties for which an
employee actually signed on. Aside from manually entering this data, the registered times can also be evaluated by card readers and stationary or mobile devices.
By entering their individual preferences, the driving personnel also take part in duty scheduling. Requests can be entered via terminals, mobile devices or the Internet – just like duty queries and signing on and off. During duty allocation, the automatic personnel dispatching is used to keep the employee‘s work time accounts balanced, considering the employee‘s requests and creating fair duty schedules. Absences, due to vacation or sickness for example, are also considered in the process, as well as the qualifications of the respective employees. In order to guarantee a continuous flow of data, IVU. rail. crew contains standardised interfaces to all known HR management systems.
“With the further development of IVU. rail we have reached a new level of transparency and flexibility in duty schedule planning and optimisation. Thanks to IVU. rail it is now possible to cover all duty forms and find the best possible solution. With the help of the vehicle scheduling program that is currently being imple-mented, all resources will soon be planned in one integrated step, boosting our productivity in a sustainable manner.”
Mauro Natali
Production Manager for Regional Transport TRENITALIA
07.05.12 M ZC
0/2
08.05.12 Ti-To ZC
0/1
09.05.12 Ti-To ZC
0/0
W19/12
10.05.12 Ti-To ZC
0/0
09.05.12 Ti-To ZC
134
13805 13805 13865 14415 14415 13410 13410 14770 14770 13876 13876 14400 14400 12440 12440 16798 16798 13710 13710 16460 16460 13710 13710 14770 14770 13876 13876 11710 11710 16799 16799 13610 13610 11810 11810 12640 12640 13835 13835 13441 13441 11830 11830 16797 16797 16797 16797 11690 07:21 05:57 15:50 22:45 04:46 10:05 19:58 05:25 11:27 19:20 03:26 03:09 17:32 08:04 01:39 17:04 09:53 05:02 23:00 15:21 06:21 07:28 15:21 23:00 05:01 10:01 16:01 23:00 05:01 10:01 16:49 20:43 03:07 09:32 15:46 20:04 13:51 06:27 00:20 15:34 09:32 03:07 20:43 16:49 10:39 04:57 22:51 14:16 06:27 09:32 15:50 09:42 15:50 19:58 05:25 11:27 19:20 03:09 09:32 15:46 00:54 07:01 16:00 11513 11513 1493 1673 11553 11553 1413 1413 1673 1493 11690 11510 1433 14650 14650 13835 13815 14610 13835 11710 11710 12620 12640 11810 12620 13420 13420 11690 11690 14650 14650 13865 13835 13835 13620 13620 13691 13691 27:26 67:44 14750 14750 13815 13815 13540 13540 21:52 26:04 18:57 18:07 9:45 12:16 12:16 18:39 04:24 10:39 04:46 10:05 18:12 03:25 03:11 08:58 03:09 09:32 14:27 09:28 05:02 04:32 10:36 06:20 12:50 16:44 11:08 16:32 03:40 08:58 20:04 05:02 21:05 13:49 03:26 09:42 42:50 09:53 06:58 15:13 18:53 17:42 12:35 21:51 23:23 13:23 12:46 19:09 20:52 16:01 23:00 20:58 19:58 :22 03:35 10:02 5:58 16:00 20:00 9:32 05:32 10:01 19:00 05:01 10:01 17:06 18:03 13:28 22:54 46:33 21:27 28:30 09:32 03:44 09:39 07:31 13:30 15:34 23 12760 D D 12760 P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST P-CST 14790 14790 14590 13441 13441 13610 13610 16460 16460 14590 13460 13460 14420 14420 12570 12570 13650 D 13650 Semester 09.05.2012 – 12.05.2012 Sjuk 10.05.2012 F 08.05.2012 – 09.05.2012 F 08.05.2012 F 09.05.2012 12670 12670 13590 13590 13420 13420 14400 14400 13710 13710 12510 12510 12420 1242007.05.12 M ZC
39
08.05.12 Ti-To ZC
133
W19/12
10.05.12 Ti-To ZC
133
07.05.12 M ZC
0/2
08.05.12 Ti-To ZC
0/1
09.05.12 Ti-To ZC
0/0
W19/12
10.05.12 Ti-To ZC
0/0
09.05.12 Ti-To ZC
134
13805
13805
13865
14415
14415
13410
13410
14770
14770
13876
13876
14400
14400
12440
12440
16798
16798
13710
13710
16460
16460
13710
13710
14770
14770
13876
13876
11710
11710
16799
16799
13610
13610
11810
11810
12640
12640
13835
13835
13441
13441
11830
11830
16797
16797
16797
16797
11690
07:21
05:57
15:50
22:45
04:46
10:05
19:58
05:25
11:27
19:20
03:26
03:09
17:32
08:04
01:39
17:04
09:53
05:02
23:00
15:21
06:21
07:28
15:21
23:00
05:01
10:01
16:01
23:00
05:01
10:01
16:49
20:43
03:07
09:32
15:46
20:04
13:51
06:27
00:20
15:34
09:32
03:07
20:43
16:49
10:39
04:57
22:51
14:16
06:27
09:32
15:50
09:42
15:50
19:58
05:25
11:27
19:20
03:09
09:32
15:46
00:54
07:01
16:00
11513
11513
1493
1673
11553
11553
1413
1413
1673
1493
11690
11510
1433
14650
14650
13835
13815
14610
13835
11710
11710
12620
12640
11810
12620
13420
13420
11690
11690
14650
14650
13865
13835
13835
13620
13620
13691
13691
27:26
67:44
14750
14750
13815
13815
13540
13540
21:52
26:04
18:57
18:07
9:45
12:16
12:16
18:39
04:24
10:39
04:46
10:05
18:12
03:25
03:11
08:58
03:09
09:32
14:27
09:28
05:02
04:32
10:36
06:20
12:50
16:44
11:08
16:32
03:40
08:58
20:04
05:02
21:05
13:49
03:26
09:42
42:50
09:53
06:58
15:13
18:53
17:42
12:35
21:51
23:23
13:23
12:46
19:09
20:52
16:01
23:00
20:58
19:58
:22
03:35
10:02
5:58
16:00
20:00
9:32
05:32
10:01
19:00
05:01
10:01
17:06
18:03
13:28
22:54
46:33
21:27
28:30
09:32
03:44
09:39
07:31
13:30
15:34
23
12760
D
D
12760
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
P-CST
14790
14790
14590
13441
13441
13610
13610
16460
16460
14590
13460
13460
14420
14420
12570
12570
13650
D
13650
Semester 09.05.2012 – 12.05.2012
Sjuk 10.05.2012
F 08.05.2012 – 09.05.2012
F 08.05.2012
F 09.05.2012
12670
12670
13590
13590
13420
13420
14400
14400
13710
13710
12510
12510
12420
12420
07.05.12 M ZC
39
08.05.12 Ti-To ZC
133
W19/12
10.05.12 Ti-To ZC
133
14 15IVU.
rail.
crew
SATISFIED DISPATCHERS
AND EMPLOYEES.
IVU. rail. crew manages the entire personnel deployment, from long-term vacation planning to daily dispatching and precise payroll accounting. The dispatcher is provided with optimal support with the automatic personnel allocation and mobile duty sign-on control functions, while the personnel are involved by entering their individual preferences.
Efficient and rule compliant duties
Automatic duty proposals and optimisation User-definable labour and work-time regulations
Planning of on-board personnel (train drivers, train conductors) and stationary personnel (shunters, train dispatchers, supervisors etc.) Integrated multiple crewing with user-definable rule system
Long-term preliminary planning
Long-term vacation and roster planning
Weekly template optimisation for an equitable distribution of employee activities
Planning on the basis of shift classes and concrete duties
Allocating and accounting
Employee participation via shift classes, duty requests and vacation requests
Automatic personnel dispatching on the basis of qualifications and employee accounts
Online communication with driving personnel via mobile devices Transfer of actual data to payroll accounting
9016 9257 9236 9827 9022 9273 9248 9033 9028 9283 9258 9291 9034 9297 9274 9051 9307 9280 9313 9290 9323 9298 9331 9337 9310 93539326 9361 9334 93779348 9383 9356 9372 9407 9380 9427 9084 94049107 94439092 9679 9686 9675 9844 9840 9839 983687 9087 9837 9661 9668 9657 9664 9655 9662 9651 965860082 9649 82 9656 9645 9652 9823 71 69118 9643 9824 9827 60272 27262002 45 35 30 60274 274 60222 80 43 222 60162 162 60224 224 60266 60160 60226 9644 68100 104 60232 946 69 84 8314 944 979 8465 232 165 61165 69107 230 60230 8908 61979 8213 842 238 672813140 8471 8325 8318 8458 8323 8310 8436 8317 8304 8627 8662 8687 8670 8697 8678 8705 87118694 8721 8702 8066 8464 8327 8326 8481 8331 948 62948 8328 8472 8485 8333 8476 8491 8332 8335 8482 8493 8334 8337 8486 8457 8492 8499 8494 8498 8505 8500 8507 8346 6900 8511 8353 8513 8357 8504 8506 8515 8352 8348 8502 8837 8822 8845 8832 8159 8826 84468843 8440 8432 8825 8804 87988131 8790 8427 8784 8776 8766 8760 8754 8744 8734 8085 8726 8712 8949 8079 8689 8095 8101 8109 8113 8117 8139 8833 8849 81658152 8151 8820 8816 8831 88218808 8812 8819 8428 8815 8800 83478344 8807 8342 8799 8783 8338 8787 8336 8495 8777 8756 8771 8763 8755 8747 8722 8077 8279 8475 8730 8738 8748 8764 8341 8772 8343 8778 8788 8345 8784 8814 8818 8803 8444 8440 84028789 87638886 8775 8888 8765 8986 84558080 8070 8070 8706 8069 8666888 8065 80578048 8056 80718684 885 8061 8055 8046 8693 8574 8051 8042 8047 8041 8026 8045 80378028 8672 8668 8546 8652 8665 8031 8022 8665 8650 8036 8693 8566 8025 8038 8032 8688 8745 0949 8858 8062 8733 8071 8753 80738743 8737 8716 8797 9145 8501 950 8463 102 228 60228 945 85 42 3 84 47 70 6204 8466 60047 6900 62946 947 8324 60169 462084 60949 62070 40 226 2 44 60044 31441 8436 9832 9831 9670 9663 9674 9667 9676 9669 9680 9673 9682 9847 69126 61007 60048 34 108 61109 61173 956 955 954 62952 952 951 168 73 169 949 953 170 74 60074 60005 60032 32 5 958 6 89 174 6217017391003 9843 69120 60049 107 46 49 48 9402 9428 9394 9088 9433 9408 9304 93929419 9384 9411 9378 93709393 9362 9387 9354 9379 93469371 9338 9365 9332 9355 9324 9314 9341 9308 9333 93009325 9820 92929317 9309 9059 9303 9040 98559276 9299 9036 90439260 9293 9032 9287 90399254 9279 9026 90319244 9265 9020 90259232 9023 9631 9819 69116 9639 9648 69111 9018 9259 9238 9029 9024 9277 9250 9035 9030 9266 9847 9285 9347 9493 9417 9388 9369 9342 9391 9366 9401 9345 9318
9016
9257
9236
9827
9022
9273
9248
9033
9028
9283
9258
9291
9034
9297
9274
9051
9307
9280
9313
9290
9323
9298
9331
9337
9310
9353
9326
9361
9334
9377
9348
9383
9356
9372
9407
9380
9427
9084
9404
9107
9443
9092
9679
9686
9675
9844
9840
9839
9836
87
9087
9837
9661
9668
9657
9664
9655
9662
9651
9658
60082
9649
82
9656
9645
9652
9823
71
69118
9643
9824
9827
60272
272
62002
45
35
30
60274
274
60222
80
43
222
60162
162
60224
224
60266
60160
60226
9644
68100
104
60232
946 69
84
8314
944
979
8465
232
165
61165
69107
230
60230
8908
61979
8213
842
238
67281
3140
8471
8325
8318
8458
8323
8310
8436
8317
8304
8627
8662
8687
8670
8697
8678
8705
8711
8694
8721
8702
8066
8464
8327
8326
8481
8331
948
62948
8328
8472
8485
8333
8476
8491
8332
8335
8482
8493
8334
8337
8486
8457
8492
8499
8494
8498
8505
8500
8507
8346
6900
8511
8353
8513
8357
8504
8506
8515
8352
8348
8502
8837
8822
8845
8832
8159
8826
8446
8843
8440
8432
8825
8804
8798
8131
8790
8427
8784
8776
8766
8760
8754
8744
8734
8085
8726
8712
8949
8079
8689
8095
8101
8109
8113
8117
8139
8833
8849
8165
8152
8151
8820
8816
8831
8821
8808
8812
8819
8428
8815
8800
8347
8344
8807
8342
8799
8783
8338
8787
8336
8495
8777
8756
8771
8763
8755
8747
8722
8077
8279
8475
8730
8738
8748
8764
8341
8772
8343
8778
8788
8345
8784
8814
8818
8803
8444
8440
8402
8789
8763
8886
8775
8888
8765
8986
8455
8080
8070
8070
8706
8069
8666
888
8065
8057
8048
8056
8071
8684
885
8061
8055
8046
8693
8574
8051
8042
8047
8041
8026
8045
8037
8028
8672
8668
8546
8652
8665
8031
8022
8665
8650
8036
8693
8566
8025
8038
8032
8688
8745
0949
8858
8062
8733
8071
8753
8073
8743
8737
8716
8797
9145
8501
950
8463
102
228
60228
945
85
42
3
84
47
70 6204
8466
60047
6900
62946
947
8324
60169
462084
60949
62070
40
226
2
44
60044
31441
8436
9832
9831
9670
9663
9674
9667
9676
9669
9680
9673
9682
9847
69126
61007
60048
34
108
61109
61173
956
955
954
62952
952
951
168
73
169
949
953
170
74
60074
60005
60032
32
5
958
6
89
174
62170
173
91003
9843
69120
60049
107
46
49
48
9402
9428
9394
9088
9433
9408
9304
9392
9419
9384
9411
9378
9370
9393
9362
9387
9354
9379
9346
9371
9338
9365
9332
9355
9324
9314
9341
9308
9333
9300
9325
9820
9292
9317
9309
9059
9303
9040
9855
9276
9299
9036
9043
9260
9293
9032
9287
9039
9254
9279
9026
9031
9244
9265
9020
9025
9232
9023
9631
9819
69116
9639
9648
69111
9018
9259
9238
9029
9024
9277
9250
9035
9030
9266
9847
9285
9347
9493
9417
9388
9369
9342
9391
9366
9401
9345
9318
16 17MAKING
COMPLEXITY
MANAGEABLE
IVU makes integrated resource planning possible and easy18 19 “With IVU. rail, we were able to
centralise the planning of personnel and vehicle deployment for all of Hungary. The integration of the actual data from our vehicle loca-tion system helps our dispatchers to react quickly to planning devia-tions and to reduce their effects on following trips.”
Ferenc Márton
Chief Operations Officer MÁV Hungarian State Railways
IVU.
rail.
vehicle
DISPATCHING
ROLLING STOCK.
Once the timetable and vehicle working schedule have been created, the dispatchers are faced with the challenge of organising the vehicle deployment as efficiently as possible. Vehicle management is particularly complicated in rail transport. Train formations may be split and continued as separate services, or vehicle groups may be removed or added. Such reconfigurations are all part of the dispatchers‘ everyday work.
IVU. rail. vehicle plans and controls the entire vehicle deployment in passenger and freight transport. The run performances and service intervals of the individual vehicles are monitored continuously and exchanged with the maintenance workshop systems via online interfaces. The detailed depiction of the parking facilities helps to pre-plan shunting procedures.
During operations, the dispatcher must react quickly to any changes like delays and cancellations. IVU. rail. vehicle supports this with the planned and actual displays and the calculation of arrival prognoses, including their effects on layover times and following trips.
When doing so, the dispatcher must be careful to consider vehicle equipment and conditions, integrate special trains, plan maintenance actions, relay and assign open parking spaces and take into account personnel allocations. Therefore, modern dispatching systems should give an overview of which vehicle is currently deployed and with which crew.
001
002
003
004
006
007
008
009
010
012
013
014
015
2101
2108
2103
6413/20
2103
225
116
120
T
001
002
003
004
006
007
008
009
010
012
013
014
015
2101
2108
2103
6413/20
2103
225
116
120
T
20 21IVU.
rail.
vehicle
EVERY VEHICLE IN ITS
CORRECT LOCATION.
IVU. rail. vehicle plans and controls the entire vehicle deployment, from long-term maintenance planning to the current timetable situation. IVU. rail. vehicle monitors individual run performances and service intervals. Track occupancies can be recorded in detail in stations and parking facilities, and shunting processes can be planned.
Optimising vehicle workings
Planning locomotives, multiple units and passenger coaches Vehicle working optimisation taking operating rules into account
Managing maintenance and operations
Pre-planning the maintenance window for the optimal utilisation of vehicles and maintenance workshops
Monitoring run performances and service intervals
Dispatching parking facilities and maintenance workshop transfers
Reacting to disruptions
Displaying vehicle positions in real-time, analysing the effects on subsequent trips
Maintain all delays and cancellations in view
Monitor pull-out and pull-in trips and vehicles‘ parking locations Find and allocate replacement vehicles, integrate short-term
22 23 „There is significant enhancement
in local public transport. ZIB and IVU combine mathematical research with engineering
expertise and practical experience in order to tap this potential.“
Prof Martin Grötschel
Vice President of Konrad-Zuse-Zentrum for Information Technologies in Berlin (ZIB)
IVU.
rail
OPTIMISATION AS
EFFICIENCY ENGINE.
Quick calculation of complex scenarios
Attain the best results while observing all requests – that is the job of the optimisation. If you are looking for the shortest path between two points, then the solution is fairly simple. However, if you wish to find the fastest travel path for a multitude of points while considering all of the boundary conditions, then optimisation turns into a highly-complicated arithmetic problem. Multi-layered automation tasks and decision-making processes can only be solved with IT and mathematics. Therefore, IVU cooperates with the “Optimisation” department of the Konrad Zuse Institute in Berlin (ZIB) for the development of optimisation components.
The optimisation of personnel and vehicle deployment is especially challenging. Thousands of duty elements must be combined into as few duties as possible within a short period of time. When doing so, all hard and soft rules for work time, breaks, qualifications, fares, travel paths and capacities must be observed. Therefore, the optimisation relies on a comprehensive database and complete rule systems. When examin-ing existexamin-ing systems in the course of optimaisation projects we are often able to identify invalid vehicle workings and duties.
The fine tuning of optimisation parameters, especially for larger scenar-ios, is a very complex and challenging task. The complete integration of the rule system ensures that the computed vehicle workings and duties conform to the rules and can be directly adopted into the operation. This optimises resource deployment and at the same time accelerates the planning processes while providing more flexibility.
IVU.
rail
AUTOMATION AND
OPTIMISATION.
Increased efficiency with the optimisation tools from IVU. rail by combining mathematical research with engineering know-how and hands-on experience.
Duty optimisation
Consider work-time rules and labour agreements, as well as soft operational constraints
Guarantee complete scheduling of all duty elements Incorporate qualification and capacity guidelines Consider multiple crewing / teams
Vehicle working optimisation
Consider service intervals, maintenance cycles and infrastructure capacities
Ensure uniform distribution of performance over a longer period of time
Create robust run schedules while simultaneously minimising required vehicles and necessary non-revenue trips
Weekly template optimisation
Reduce variations during the week with fewer overtime hours or sub-performances
Better distribution of days off and undesirable duties (e. g. late duties or split duties)
Acceleration of the entire planning process
Automatic personnel dispatching
Observe qualifications, capacities and rule systems Keep employee accounts balanced and allocate fairly Consider individual employee requests
26 27 “The products of the IVU. suite
have enabled us to develop a modern transport system in Santiago de Cali within the shortest possible space of time. This has had a positive impact on the quality of life and the cityscape.”
Luis Eduardo Barrera
President of Metro Cali S. A.
IVU. 30 YEARS
OF EXPERIENCE.
Our IVU. suite provides support for all task areas of a transport company and allows for integrated solutions with a single product: from planning and dispatching via operation management, to ticketing and passenger information, as well as settling transport contracts.
IVU systems plan routes, deploy buses and trains, provide passengers with information, ensure transfer connections, dispatch drivers, monitor fleets, sell tickets, combine data and increase efficiency. Whether you are looking for a complete solution or individual components – our products are based on open standards and can be integrated easily into a wide range of system environments.
Approximately 350 employees at eight locations, in seven countries and countless projects develop software, advise clients, work on new concepts, implement systems and optimise workflows. Our strength is quite evidently based on the performance, knowledge, motivation and personalities of the people who work at IVU.
CONTROLLING PLANNING FLEET
MANAGEMENT TICKETING PASSENGER INFORMATION
IVU.box IVU.validator
IVU.control
IVU.plan IVU.fleet IVU.fare IVU.realtime
IVU.pool
DISPATCHING IVU.vehicle
IVU IN USE AROUND
THE WORLD.
A growing community of clients ensures the continued development of IVU. rail. An exchange of information between the users is
encouraged, for example by means of user groups.
IVU. rail is currently being used by the following railway companies, further details can be found on
-> Page 6 and at www. ivu. de.
DEPARTMENT OF PLANNING, TRANSPORT AND
INFRASTRUCTURE,
Adelaide (AU)
Central timetable planning system for buses and trains in the wider Adelaide area.
EUROPORTE,
France (FR)
Personnel and vehicle scheduling for punctual and flexible cargo transport with 75 locomotives.
VNR VIETNAM RAILWAYS, Vietnam (VN)
Planning, optimisation and operative control of vehicles and employees across the entire country, as well as real-time passenger information.
VEOLIA TRANSPORT,
Germany (DE)
Planning and dispatch for all rail and bus companies in Germany on a shared database at corporate headquarters.
RIYADH,
Saudi Arabia (SA)
Driverless metro
at the Princess Nora bint Abdulrahman University.
BANGKOK (TH), KUALA LUMPUR (MY)
Planning and dispatch for rapid transit train services.
STOCKHOLMSTåG,
Stockholm (SE)
Integrated resource planning for suburban rail operations with 160 trains, and interfaces to the network operator and the maintenance workshop.
IVU locations IVU references
30
ALL ADVANTAGES
AT A GLANCE.
IVU. rail is a standard product with a modular construction. The modules can be implemented individually, as a whole or in combination with other systems or individual developments. All modules run on a single data-base, with open interfaces to all common peripheral systems, e. g. from the fields of HR management or maintenance workshop management.
IVU. rail. plan
Network
planning
IVU. rail. plan
Timetable
planning
IVU. rail. plan
Duty
scheduling
IVU. rail. crew
Roster
layout
IVU. rail. crew
Personnel
dispatch
IVU. rail. crew
Payroll
accounting
IVU. rail. plan
Vehicle
working
scheduling
IVU. rail. vehicle
Track
occupancy
IVU. rail. vehicle
Vehicle
dispatch
IVU. rail. vehicle
Vehicle
monitor
31
ivu. RAiL. PLAN
Network planning
Train stations and operating units Links and routes
Change of direction points Parking facilities
Any number of network point groups for regional assignments
Timetable planning
Editing in the graphical and tabular timetables Trip course and train formation building Sequence planning and vehicle orientation Footnotes and comments
Vehicle types and trip numbers
vehicle working scheduling
Link routes and transfer trips to vehicle workings Receive suggestions for appropriate following trips Consider train formations and changes of direction Pre-plan maintenance windows
Generate vehicle workings on the basis of parking actions Plan service blocks (refuelling, cleaning, maintenance) Vehicle scheduling over multiple days
Layover, buffer and preparation times
Duty scheduling
Configure duty, break & labour rules
Duty optimisation and adjustment optimisation Schedule additional duty elements
Automatic duty proposal
Travel path and passage trip search
Multiple crewing (train drivers, train conductors) Stationary personnel (shunters, train dispatcher, supervi-sors etc.)
Coupling performances, driver’s cabin changeover times, take overs/handovers
Generate additional duty pieces on the basis of the number of auxiliaries in the train formation Different duty rules for train conductors are possible Optimisation according to various crew types is possible
ivu. RAiL. CREw
Roster layout
Schematic and/or calendar-related planning Anonymous long-term preliminary planning Weekly template planning and optimisation Roster layout optimisation
User-definable roster layout rule system Shift class planning
Personnel dispatch
Automatic personnel dispatching
Consider requests, shift classes and accounts Report duty sign-on/off from mobile devices as well Online communication between train drivers/dispatcher User-definable dispatching levels
Qualification check and extension
Automatic account update (work time, weekly rest, etc.)
Payroll accounting
Connect HR systems (e. g. SAP, Peoplesoft) Profit centre splitting
Assessing planned and actual work times User-definable payroll rule system for all personnel timesheets User-definable payroll rule system for all wage agreements
ivu. RAiL. vEhiCLE
Track occupancy
Plan track occupancies in train stations and parking facilities
Consider track and depot capacities (restrictions) Consider station run order
Plan coupling procedures Supply planning
vehicle dispatch
Manage all vehicles
Monitor service intervals and run performances Connect to maintenance systems online Create special trips and transfer trips Process cancellations and disruptions Automatic vehicle parking
All parking facilities at a glance Short-term planning changes
vehicle monitor
Connect to vehicle location systems for actual data (vehicles, times, travel paths)
Difference of planned and actual data and delay prognoses
Support short-term disruption management Monitor pull-out and pull-in trips
Difference between planned and actual parking actions Direct control of passenger information
IVU Traffic Technologies AG Bundesallee 88 12161 Berlin Germany T + 49.30.859 06 -0 F + 49.30.859 06 -111 post@ivu. de www. ivu. de