Expansion Projects 2012-2016...5

Section TWO

Rehabilitation Projects 2012-2016...10

Section THREE

Projects Beyond 2016...40

Section FOUR

2011 Completed Projects...45

(3)

This includes $1.87 billion for southern Ontario, creating more

than 18,500 direct and indirect jobs. Improving Ontario's

transportation network is part of the government’s plan to

strengthen the economy. Key highway investments planned

between 2012 and 2016 include:

constructing the Windsor Essex Parkway

extending Highway 407 easterly

widening Highway 401 express and collector lanes between the

Highway 401/403/410 interchange and Hurontario Street in

Mississauga

building a new interchange at Highway 6 (Hanlon Expressway)

and Laird Road in Guelph

widening Highway 417 from Nicholas Street to Ottawa

Road 174 in Ottawa

2012 Planned Accomplishments

Southern Ontario

New highway

102km

New bridges 5

Highway rehabilitated

410km

Bridges rehabilitated

79

(4)

using recycled and shredded tires for bridge

(5)
(6)

Construction crews have begun widening

Highway 7/8 from four to six lanes between

Fischer-Hallman Road and Courtland

Avenue in west Kitchener. Expanding the

highway for 6.5 km will ease congestion

during rush hour as commuters head to

and from west Kitchener neighbourhoods.

Eleven bridges will be widened and repaired,

and a new concrete median barrier will be

built to separate eastbound and westbound

lanes, keeping traffic flowing efficiently

and safely. The work begins this year with

repairs to the Fischer-Hallman Bridge.

Work will move east in subsequent years,

finishing in 2015.

(7)
(8)

# Region Hwy Location Type of Work Date

1 WR 3 Leamington to Windsor, Phase 2, Essex County Rd. 11 to west junction Essex County Rd. 34 Two to five-lane widening 2012

2 WR 6 Hanlon Expressway, Laird Rd., Guelph New interchange 2013 3 WR 7N Kitchener to Guelph New four-lane highway Beyond 2016 4 CR 7 Brock Rd., Pickering to Hwy 12, Durham, FLOW Two to four-lane widening 2013 5 WR 7 & 8 Fischer-Hallman Rd. to Courtland Ave., Kitchener Four to six-lane widening 2015 6 WR 8 Kitchener Waterloo Expressway, Grand River to Highway 401, Build Canada Fund (BCF)* Four to six and four to eight-lane widening / resurfacing 2012 7 ER 17 Arnprior By-Pass, Phase 1, Regional Rd. 29 to Division St. Two to four-lane widening 2012 8 CR 26N Wasaga to Collingwood, Sixth line to existing Hwy 26, Phase 3A, Simcoe New four- lane highway 2012 9 ER 62 Hwy 401 to Foxboro, Belleville Two to four and five-lane widening 2014

10 CR 401 Hwy 410 to Hurontario St., Peel New interchange / widening 2013 11 ER 401 Hwy 15 to Frontenac Cty. Rd. 38 - Phase 4 - Montreal St. and CNR overheads, Kingston Bridge replacement / widening / interchange

improvements 2015 12 ER 401 Hwy 15 to Frontenac County Rd. 38, Phase 2, west of Sydenham Rd. to west of Montreal St., Kingston Four to six-lane widening 2012

13 WR 401 Colonel Talbot Rd. to Veterans Memorial Parkway, London including Wonderland Road and Veterans Memorial Pkwy

New interchange /

interchange improvements 2016

14 WR 401 & 3 Hwy 401 and Hwy 3 through Tecumseh, LaSalle and Windsor New six-lane below grade freeway / new four-lane at-grade service Rd. network 2015 15 WR 402 Bluewater Bridge to east of Murphy Rd., Sarnia (BIF)* Two to four westbound-lane widening 2014 16 WR 403 Oak Park Interchange, Brantford (Parnership with Interchange improvements / 2013

(9)

p

Map

# Region Hwy Location Type of Work

Target Completion Date

17 CR 404 Queensville Side Rd. to Ravenshoe Rd., York, Phase 4 of 4 (FLOW) New four- lane highway 2014 18 CR 404 Green Lane to Queensville Side Rd., York, Phase 3 of 4 (FLOW) New four- lane highway 2014 19 CR 406 Port Robinson Rd. to Main St., Niagara Two to four-lane widening 2015

20 CR 407E Brock Rd. to Harmony Rd. including a connection to Hwy 401 east of Lake Ridge Rd (Phase 1)

New 10km 6-lane highway, 12km 4-lane highway and 10km 4-lane freeway to freeway connection

2015

21 ER 417 Eagleson Rd. to Hwy 7, Ottawa (HOV)* Four to eight and four to six-lane widening 2014 22 ER 417 - OQW Hwy 416 to Anderson Rd., Phase 3D, Carling Ave. westbound and Kirkwood Ave. bridges, Ottawa Bridge replacements / widening 2013 23 ER 417 - OQW Hwy 416 to Anderson Rd., Phase 4B, Cyrville Rd. bridge, Ottawa Bridge replacement 2012 24 ER 417 - OQW Hwy 416 to Anderson Rd., Phase 5, Nicholas St. to Ottawa Rd. 174, Ottawa Six to eight-lane widening / bridge replacements /

rehabilitation / widenings 2015 Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

*

BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

(10)
(11)

Highway 401 between Avenue Road and

Bayview Avenue in Toronto carries about

400,000 vehicles per day. All express lanes,

east and west bound, and six bridges are

currently undergoing major rehabilitation.

The six bridges include the Hogg’s Hollow

Bridge and the Yonge Street overpass.

When repairs are complete, drivers will

notice new pavement and see updated

illumination, a new median and noise

barriers.

This project is one of several projects along

Highway 401 through Toronto and is part

of the Ministry of Transportation’s strategic

rehabilitation program for Highway 401

between Renforth Drive and Warden

Avenue.

(12)
(13)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

1 QEW Underway Bertie St., Niagara Bridge rehabilitation 2012 n/a 2 QEW Underway Credit River, Peel Bridge rehabilitation 2012 n/a 3 QEW Underway Glover Rd., Fifty Rd., Millen Rd., Hamilton Bridge rehabilitation 2012 n/a 4 QEW Underway Burlington Bay Skyway, Toronto-bound,Burlington/Hamilton Bridge rehabilitation 2012 n/a 5 QEW New 0.3 km east of Victoria Ave. to 1.5 km east of Casablanca Blvd., Toronto-bound, Niagara Resurfacing 2012 17.0 6 QEW New Hwy 420 to Lyons Creek Rd., Niagara Resurfacing 2012 9.0 7 QEW New Central Ave. to 0.5 km south of Gilmore Rd., Niagara Resurfacing 2012 4.0 8 QEW/406 Underway Thompson Rd. and Chestnut St., Niagara Bridge rehabilitations 2012 n/a 9 7 New 4th Line and Coles Crt. intersections in Acton, Halton Intersection improvements 2012 n/a 10 8 New Hwy 5/8, Peters Corners, Hamilton Intersection improvements 2013 n/a 11 11 New Memorial Ave. to Laclie St., Simcoe Resurfacing 2012 8.0 12 11 New Severn River bridge at Severn Bridge Bridge rehabilitation 2012 n/a 13 11 New Gull Lake bridges, north of Gravenhurst Resurfacing / bridge rehabilitation 2014 n/a 14 11 New South Muskoka River bridge, south of Bracebridge Bridge rehabilitation 2012 n/a 15 11 New 4.7 km north of Muskoka Rd. 117 Culvert replacement 2012 0.2 16 11 Underway Vernon Lake, northbound lane, Huntsville Bridge rehabilitation 2012 n/a 17 12 Underway Simcoe Rd. 37 to Hwy 93, Simcoe Resurfacing 2012 3.5 18 12 New CNR overhead in Midland, Simcoe Bridge replacement 2013 n/a

(14)

# Hwy Status Location Type of Work Date (km)

19 12 New Atherley Rd. to south junction of Hwy 11/12, Simcoe Resurfacing 2012 5.6 20 26 New Nottawasaga River to Stayner east limits, Simcoe Resurfacing 2012 15.6 21 35 New Hwy 118 northerly, Carnarvon Resurfacing 2012 7.9 22 35 New North of Haliburton Rd. 13, Halls Lake Culvert rehabilitation 2012 n/a 23 35/115 Underway Newcastle and CPR bridge, Durham Bridge rehabilitations and commuter parking lot 2012 n/a 24 48 New Herald Rd., York Signal installation 2012 n/a 25 58 New Thorold Stone Rd. to Hwy 406, Niagara Resurfacing 2013 4.0 26 60 New Oxtongue Lake Narrows bridge, east of Hwy 35 Bridge replacement 2013 n/a 27 93 Underway Waverley Rd. to north of Hillsdale, Simcoe Truck climbing lane / traffic signals 2012 1.6

28 141 New West of Hwy 11 westerly, Ullswater easterly Resurfacing 2012 19.8 29 400 Underway Hwy 11 to Hwy 93, northbound and southbound lanes, Simcoe Resurfacing / bridge rehabilitations 2013 16.2 30 400 New Hwy 93 to Simcoe Rd. 19, Simcoe Resurfacing 2014 15.7 31 400 New 1 km south of Major Mackenzie Dr. to 2.3 km north of King Rd., southbound

lanes, York Resurfacing 2012 7.8

32 401 Underway Hogg’s Hollow, eastbound and westbound express lanes, Toronto Bridge rehabilitation 2013 n/a 33 401 Underway Jane St. to Kipling Ave., westbound collector lanes, Toronto Reconstruction / bridge rehabilitation 2013 5.9 34 401 Underway Keele St., Toronto Bridge replacement 2013 n/a 35 401 Underway Warden Ave., Toronto Bridge rehabilitation 2013 n/a

(15)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

36 401 New Mill St., Morgans Corners, and Holt Rd., Durham Bridge rehabilitations 2013 n/a 37 401 New Allen Rd. interchange, Toronto Bridge rehabilitations 2012 n/a 38 401 New Bloor St., Durham Bridge rehabilitation 2012 n/a 39 401 New Noise barrier walls in Oshawa, Durham Noise barrier replacement 2013 n/a 40 403 Underway Various locations, Hamilton Bridge rehabilitation 2012 n/a 41 403 New Central Parkway to Hwy 401/410 interchange, eastbound collector lanes, Peel Resurfacing 2012 2.8 42 403 New Burnhamthorpe Rd., Eglinton Ave., Mississauga Rd., Peel Bridge rehabilitations 2013 n/a 43 403 New King Rd., Waterdown Rd., Lemonville Rd., Snake Rd., Halton and Hamilton Bridge rehabilitations 2013 n/a 44 406 New Geneva St. to south of Beaverdams Rd., Niagara Resurfacing 2013 9.0 45 427 Underway QEW to Hwy 401, southbound collector lanes, Toronto Reconstruction / bridge rehabilitations 2013 7.3 46 427 Underway QEW to Hwy 401, northbound collector lanes, Toronto Reconstruction / bridge rehabilitations 2014 7.3 401/427 Underway Various locations Overhead sign structures 2012 n/a Various New Various locations Bridge rehabilitations 2012 n/a Various New Various locations Resurfacing 2012 n/a Various New Various locations within GTA, Phase 1 of 2 Overhead sign structures 2013 n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(16)
(17)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

1 QEW New Beck Rd., Niagara Bridge rehabilitation 2013 n/a 2 QEW New Gilmore Rd., Niagara Bridge rehabilitation 2013 n/a 3 QEW New Grays Rd., Fruitland Rd., Winona Rd., Hamilton Bridge rehabilitations 2014 n/a 4 QEW New Westbound lanes near Brant St., Halton Operational improvements 2013 1.1 5 5 New Spencer Creek, Hamilton Bridge replacement 2013 n/a 6 11 New CNR and CPR overhead, north of Orillia, Simcoe Bridge replacements 2014 n/a 7 12 New Sturgeon River, Simcoe Bridge replacement 2014 n/a 8 26 New Wilson Dr., Simcoe Traffic signals 2013 n/a

9 401 New Jane St. to Avenue Rd., eastbound collector lanes, Toronto Reconstruction / bridge rehabilitations 2017 7.4 10 401 New Hope Townline Rd. and Cobbledick Rd., Durham Bridge replacements 2014 n/a 11 58/140 New Fork’s Rd., CNR and CPR bridges, Niagara Bridge replacements 2015 n/a 12 58/406 New Richmond St., Pine St., Queen St., Glendale Ave., Beaverdams Rd., Niagara Bridge rehabilitations 2014 n/a 13 400 New York / Simcoe boundary to Essa Rd., Simcoe, Phase 1 of 2 Resurfacing / bridge rehabilitations /

median barrier 2015 32.0 14 400 New Hwy 400 / 401 interchange, Toronto Bridge rehabilitations 2015 n/a 15 400 New Crown Hill, Simcoe Bridge replacement 2014 n/a 16 400 New North of Muskoka Rd. 5 northerly, Port Severn Resurfacing / culvert rehabilitation 2013 10.9 17 403 New Hwy 2, Hamilton Dr., Fiddler’s Green, Southcote Rd., Golf Links Rd., Mohawk Rd., Hamilton Bridge rehabilitations 2014 n/a 18 403 New 1 km west of Hwy 6 to 1 km west of Aberdeen Ave., Hamilton Resurfacing 2013 5.0

(18)

Map # Hwy Status Location Type of Work Completion Date Length(km)

Various New Various locations Bridge rehabilitations 2013 n/a Various New Various locations Resurfacing 2013 n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(19)

Hwy Location Type of Work

Project Length (km)

6 York Blvd. Hamilton Bridge rehabilitation n/a 8 Hwy 5 to west of Safari Rd., Hamilton Resurfacing 13.5

9 Holland Canal, York Bridge replacement n/a

11 CNR Bridge near Washago, Simcoe Bridge rehabilitation n/a 11 Hawk Rock Creek, Kashe River, south of Gravenhurst Culvert rehabilitation n/a 11 Muskoka Road 44 northerly, south of Huntsville Resurfacing 9.6 11 Stephenson Rd. 12 northerly Preventive resurfacing 5.1 12 Simcoe Rd. 37 to Hwy 400, Simcoe Resurfacing 12.5 35 Halls Lake Culvert, north of Hwy118, Hall's Lake Culvert rehabilitation n/a 69 Structures, south of Muskoka Road 169, Foot's Bay Bridge rehabilitation n/a 89 Hwy 400 to Essa Township 8th Line, Simcoe Resurfacing 7.6 89 Innisfil Creek Bridge, Simcoe Bridge replacement n/a

118 Anson Creek and Black River Bridgess, west of Hwy 35 Bridge rehabilitation n/a 141 Rosseau River Bridge, east of Hwy 632, Rosseau Bridge rehabilitation n/a 400 South of Crooked Bay Road northerly, Crooked Bay Resurfacing 8.9 400 North Simcoe County Rd. 23, Simcoe Bridge rehabilitation n/a 400 Lower Big Chute Rd., Coldwater River Bridge, Simcoe Bridge rehabilitation n/a 400 Severn River Bridge, Port Severn, Simcoe Bridge rehabilitation / replacement n/a

(20)

Hwy Location Type of Work (km)

400 Severn River Boat Channel Bridge, Port Severn, Simcoe Bridge rehabilitation / replacement n/a 400 York / Simcoe boundary to Essa Rd., Simcoe, Phase 2 of 2 Resurfacing / bridge rehabilitations / median barrier 7.8 401 Hogg’s Hollow, eastbound & westbound collector, Toronto Structual coating n/a 401 Hwy 403 ramp, Peel Bridge rehabilitation n/a 401 Renforth Dr. to Hwy 410, express lanes, Peel Resurfacing 5.8 401 Eastbound ramp over Heart Lake Rd., Peel Bridge rehabilitation n/a 401 Dixie Rd., Peel Bridge rehabilitation n/a 401 Kipling Ave, Toronto Bridge rehabilitation n/a 401 Hwy 48 to Warden Ave., westbound express, Toronto Resurfacing 5.7 401 Trafalgar Rd. to Halton Rd. 25, Halton Resurfacing and bridge rehabilitations 9.2 403 Desjardin Canal eastbound lanes, Halton Bridge rehabilitation n/a 403 CNR Subway, Hamilton Bridge rehabilitation n/a 403 Plains Rd., Hamilton Bridge rehabilitation n/a 403 CPR Subway and Longwood Rd., Halton, Hamilton Bridge rehabilitations n/a 403 Central Parkway to Hwy 401/410 interchange, express lanes and eastbound collector lanes, Peel Resurfacing 4.4 403 1 km west of Winston Churchill Blvd. to Ford Dr., Halton / Peel Resurfacing 6.2 404 McNicoll Ave., Toronto Bridge rehabilitation n/a

(21)

Hwy Location Type of Work

Project Length (km)

404 John St., York Bridge rehabilitation n/a 404 19th Ave., York Bridge rehabilitation n/a 404 Steeles Ave., York Bridge rehabilitation n/a 404 St. John Sd. Rd., York Bridge rehabilitation n/a 406 QEW interchange to Geneva St., Niagara Resurfacing 6.0 409 Belfield structure, Toronto Bridge rehabilitation n/a

410 Bovaird Dr. to Queen St., Peel Resurfacing 3.3 427 Bloor St., Toronto Bridge rehabilitation n/a 427 Burnhamthorpe Rd., Toronto Bridge rehabilitation n/a 427 Rathburn Rd., Toronto Bridge rehabilitation n/a 427 Albion Rd. and CNR bridge, Toronto Bridge rehabilitations n/a 427 Hwy 401 to Campus Rd., Toronto Resurfacing 2.9 QEW 1 km east of Victoria Ave. to 0.6 km west of Seventh St., Niagara Resurfacing 5.6 QEW Christie St. and Maple Ave., Niagara Bridge rehabilitations n/a QEW Burlington Bay Skyway, Niagara-bound, Burlington / Hamilton Bridge rehabilitation n/a QEW Burloak Dr., Halton Bridge rehabilitation n/a QEW Glendale Ave., Niagara Bridge rehabilitation n/a QEW Hwy 403 ramp over Ford Dr., Halton Bridge rehabilitation n/a

(22)

Hwy

Location

Type of Work

Length

(km)

QEW Baker Rd., Niagara Bridge rehabilitation n/a QEW Netherby Rd., Niagara Bridge rehabilitation n/a QEW Townline Rd., Niagara Bridge rehabilitation n/a QEW Black Creek bridge, Niagara Bridge replacement n/a QEW Bowen Rd., Niagara Bridge replacement n/a QEW Walkers Line, Halton Bridge rehabilitation n/a QEW Dorval Dr., Halton Bridge rehabilitation n/a QEW Winston Churchill Blvd., Halton Bridge rehabilitation n/a QEW Seventh St., Niagara Bridge replacement n/a Various Various locations Bridge rehabilitations n/a

Various Various locations Resurfacing n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(23)
(24)

# Hwy Status Location Type of Work Date (km)

1 7 Underway Havelock to Norwood Resurfacing / passing lanes 2012 7.7 2 7 Underway South Junction Hwy 115 to Peterborough Rd. 15 Resurfacing / structural culvert replacement 2012 3.6 3 7 New Scott Rd. westerly to Hwy 41, Kaladar Resurfacing / passing lane 2013 15.0 4 7 New Sharbot Lake westerly to Scott Rd. Resurfacing 2012 25.0 5 7 New Wemyss to Maberly Passng lanes / intersection Improvements 2013 1.0 6 7 New Marmora to Havelock Resurfacing 2013 13.6 7 7A/7 New Trout Creek Bridge and CNR bridge Bridge rehabilitations 2013 n/a 8 17 Underway CNR overhead, Renfrew Bridge rehabilitation 2012 n/a 9 17 Underway CPR overhead, Petawawa Bridge rehabilitation 2012 n/a 10 17 Underway East of Renfrew Cr. 42 to Renfrew Cr. 26 Resurfacing 2012 5.4 11 17 New Snake River bridge, Cobden Bridge rehabilitations 2012 n/a 12 17 New Stonecliffe to Bissett Creek Resurfacing 2012 12.5 13 28 Underway Renfrew Rd. 514 to Denbigh Resurfacing 2012 18.7 14 28 Underway Peterborough / Haliburton boundary to Haliburton/Hastings Boundary Resurfacing 2012 11.6 15 28 New Former Hwy 134 northerly to Stoney Lake Rd. Realignment / Intersection Improvements 2013 2.6 16 28 New Hastings County Line to Bancroft south limits Resurfacing 2013 12.8 17 35 Underway Rd. 121, Long Beach Intersection improvements 2012 n/a

(25)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

19 60 Underway Bonnechere River bridge at Deacon Bridge rehabilitation 2012 n/a 20 60 Underway Renfrew Rd. 61 to Douglas Resurfacing 2012 6.5 21 62 New Bancroft to Hickey Settlement Rd. Pavement presevation 2012 10.0 22 127 Underway Papineau Creek and Little Mississippi bridges, Maynooth Bridge rehabilitations 2012 n/a 23 138 New North Raisin River bridges, south of Rd. 43 Bridge rehabilitations 2013 n/a 24 148 Underway Hazley Bay bridge, Pembroke Bridge rehabilitation 2012 n/a 25 401 Underway Trent River bridge, Trenton Bridge rehabilitation / widening 2012 n/a 26 401 Underway CNR & Boundary Rd Bridges, Cornwall Bridge replacements 2014 n/a 27 401 Underway Moulinette underpass, interchange 778, Long Sault Bridge replacement 2012 n/a 28 401 Underway Carman Rd. underpass, Iroquois Bridge replacement 2012 n/a 29 401 Underway CNR overhead and Hwy 37 underpass, Belleville Bridge rehabilitations 2013 n/a 30 401 Underway Crystal Springs 1000, LaRue Mills Rd. and County Rd. 2 underpasses Bridge rehabilitations 2013 n/a 31 401 Underway Lennox and Addington Rd. 41 to Wymans Rd, Napanee Resurfacing 2012 15.1 32 401 New Frontenac Rd. 38 to Lennox and Addington Rd. 4 Resurfacing 2013 17.5 33 401 New Hwy 416 to Carmen Rd. Resurfacing 2012 17.0 34 401 New Dickinson Dr. underpass, Brookdale Ave. underpass, McConnell Ave. underpass

Summerstown Rd Underpass, Cornwall Area Bridge rehabilitations 2013 n/a 35 401 New Beechwood Rd. underpass and Palace Rd. overpass Bridge rehabilitations 2013 n/a

(26)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

36 401 New Moulinette Rd. to Upper Canada Resurfacing 2012 20.5 37 401 New Mallorytown Rd. to Brockville Resurfacing 2012 9.0 38 401 New East of North Augusta, Brockville Noise barriers 2012 1.0 39 401 New Cornwall Centre Rd. overpass Bridge replacements 2014 n/a 40 416 Underway 1.4 km north of Rd. 43 to Rd. 6, Roger Stevens Dr. Resurfacing 2012 13.5 41 416 New Hwy 401 to County Rd. 44 Resurfacing 2012 30.2 42 417 Underway Boundary Rd. underpass, Ottawa Bridge rehabilitation 2014 n/a 43 417 Underway Prescott Russell Rd. 14 and Rd. 10 bridge overpasses Bridge rehabilitations 2012 n/a 44 417 New Stormont Dundas and Glengary Rd. 20, Casselman Bridge rehabilitations 2013 n/a 45 1000 Underway Resurfacing Thousand Islands Parkway Resurfacing 2012 11.0

1000 New Thousand Islands Parkway bridges Bridge rehabilitations 2013 n/a various New Various highways Culvert replacements 2012 n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(27)
(28)

#

Hwy

Status Location

Type of Work

Date

(km)

1 7 New Structural culverts, Oakwood Culvert replacement/ rehabilitation 2013 n/a 2 7 New Structural culvert, McGarry Creek Culvert replacement 2013 n/a 3 17 New Petawawa River bridge, Petawawa Bridge rehabilitations 2015 n/a 4 15 New Seeleys Bay northerly to Crosby Resurfacing / passing lanes 2014 23.9 5 35 New Trent Canal bridge, Rosedale Bridge rehabilitation 2014 n/a 6 138 New St. Andrews bridge Bridge rehabilitation 2013 n/a 7 401 New County Rd. 45, underpass, Division St. Bridge rehabilitation 2014 n/a 8 401 New Mitchell Rd. underpass Bridge rehabilitation 2013 10.0 9 401 New Trent River bridge, Quinte West Bridge rehabilitation 2014 n/a 10 401 New Glen Miller Rd. interchange 526 bridge Bridge rehabilitation 2014 n/a 11 417 New Hwy 34 and Hwy 138 underpasses Bridge rehabilitations 2014 n/a 12 417 New Casselman Rd. underpass Bridge rehabilitation 2013 n/a 13 417 New 8th Line to Russell Rd. Resurfacing 2013 7.1 14 Ferry Docks New Stella, Amherst Island and Millhaven, Hwy 33 Dock replacement 2014 0.5 Various New Various highways Culvert replacements 2013 n/a

(29)

Hwy Location Type of Work

Project Length (km)

7 Fall River bridge, Sharbot Lake Bridge rehabilitation n/a 7 Crowe River bridge, Marmora Bridge rehabilitation n/a 7 Salmon River bridge, Arden Bridge replacement n/a 7 Otonabee River and CNR eastbound lane bridges Bridge rehabilitation n/a 7,28,118 Hwy 7 Ouse River bridge, Norwood, Hwy 28 Eels Creek bridge, Woodview, Hwy 118 Irondale River Bridge replacements / culvert replacement n/a 15 County Rd. 42 to Youngs Hill Rd. and Crosby Creek bridge Resurfacing / bridge replacement 2.8 17 Renfrew Rd. 26 To Petawawa Township boundary Resurfacing 6.6 17 Mississippi River bridge, Arnprior Bridge rehabilitation n/a 33 Frontenac Rd. 20 to Bath Resurfacing 14.5 35 City of Kawartha Lakes Rd. 121 northerly to Coboconk Resurfacing 19.9 41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a

41 North of Rankin Culvert replacement n/a

41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a

41 Hwy 60 to Hwy 17 Resurfacing 29.0

62 Ashley St. to Hastings Rd. 14, Foxboro Resurfacing 3.4 62 Moria Lake bridge Bridge rehabilitation n/a 62 Foxboro / Stirling 14 to Ivanhoe S Lt. Resurfacing 10.3 62 Structural Culverts Eldorado, Crofton and Bannockurn Culvert replacements n/a 132 Constant Creek bridge Realignment / bridge replacement 1.0

138 Monkland to Hwy 417 Resurfacing 16.9

148 CPR overhead bridge, Pembroke Bridge rehabilitation n/a 401 & 62 Hwy 401 east of Rd. 30 and Hwy 62, Pearsall Creek Culvert replacements n/a

(30)

Hwy Location Type of Work (km)

401 Cornwall to Morrisburg bridges Bridge rehabilitations n/a 401 Napanee area bridges Bridge rehabilitations n/a 401 Upper Canada Rd. underpass, Morrisburg Bridge rehabilitation n/a 401 Aultsville County Rd. underpass Bridge rehabilitation n/a 401 Lennox and Addington County Rd. 41 overpass and Napanee River and Selby Creek bridges Bridge rehabilitations n/a 401 County Rd. 2 / Highway 34 underpass Bridge rehabilitation n/a 401 Power Dam Drive underpass, Cornwall Bridge rehabilitation n/a 401 Lennox and Addington County Rd. 4 to County Rd. 41, Napanee Resurfacing 14.6 417 Bearbrook Road bridges Bridge Rehabilitations n/a 417 Limoges Rd. to 8th Line Rd., Ottawa Resurfacing 19.6 417 St. Eugene Rd. underpass Bridge rehabilitation n/a 417 Ramsayville Rd. overpass Bridge rehabilitation n/a 417 Hwy 7 to March Rd., Ottawa Resurfacing 9.2 1000 Landons Bay and Jones Creek bridges Bridge rehabilitation / replacement n/a Various Various highways Culvert Replacements n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(31)
(32)

# Hwy Status Location Type of Work Date (km)

1 3 New Grand River bridge, Cayuga Bridge replacement 2014 n/a 2 6 Underway Wellington Rd. 7 to Fergus Resurfacing / culvert rehabilitation 2012 12.1

3 6 New Port Dover to Jarvis

Resurfacing / bridge rehabilitation / intersection improvements

2012 13.2

4 6 New North of Laird Rd. to Woodlawn Rd., Guelph Resurfacing 2012 8.8 5 7 Underway Middlesex Rd. 50 to Perth Rd. 9, St. Marys Resurfacing / bridge / culvert rehabilitation 2013 17.8 6 7 Underway Rockwood to Halton Rd. 32 Resurfacing / bridge rehabilitation 2012 4.1 7 8 New MTO Commuter Parking Lot / GO TRANSIT FACILITY at Sportsworld

Drive Commuter parking lot 2012 n/a 8 10/89 New Shelburne to Primrose Resurfacing 2012 5.5 9 21 New Tiverton to Port Elgin Resurfacing 2012 20.8 10 21 New Sheppardton to Kingsbridge Resurfacing 2012 9.8 11 21 New Bayfield to Goderich Resurfacing / culvert rehabilitation /

replacement 2014 20.0 12 21 New Amberley to Kincardine Resurfacing 2012 17.9 13 21 New Grand Bend to Hendrick Rd. Resurfacing / culvert rehabilitation /

replacement 2012 7.8 14 23 New Various locations including Thames River Bridge, Flat Creek Bridge, Bridge / culvert replacement / bridge 2012 n/a

(33)

Map

# Hwy Status Location Type of Work

Target Completion Date Project Length (km)

16 24 New Simcoe to Scotland Resurfacing / culvert rehabilitation 2012 15.9 17 26 Underway Woodford to Meaford Resurfacing / culvert rehabilitation 2012 9.8 18 40 New Various locations, Chatham to Wallaceburg Bridge / culvert rehabilitations 2012 n/a 19 40 New Stanley Line to Courtright Line, south of Sarnia Resurfacing 2012 6.8 20 85 New Lancaster St. to Waterloo Rd. 15, Waterloo Resurfacing / culvert / bridge rehabilitation 2015 7.6 21 401 Underway Chatham-Kent Rd. 2 and Dillon Rd. underpass, east of Tilbury Bridge rehabilitation 2012 n/a 22 401 Underway Putnam Commercial Vehicle Inspection Facilities Rehabilitation 2013 n/a 23 401 New Kenesserie Rd., Duart Rd., Chatham-Kent Bridge rehabilitation 2012 n/a 24 401 New Drake Rd., Chatham-Kent Bridge rehabilitation 2012 n/a 25 401 New Bloomfield Rd., Chatham-Kent Bridge rehabilitation 2012 n/a

26 401 New Wellington Rd. 32, Wellington Rd. 35, Hwy 6, Guelph Bridge rehabilitation 2013 n/a 27 401 New Hwy 6, west ramp terminal, Morriston Interchange improvement /

resurfacing 2012 n/a 28 401 New Blacks Rd. to Currie Rd., West Lorne Resurfacing 2012 22.2 29 401/402 New Interchange ramps, west of London Resurfacing 2012 n/a 30 401/403 Underway Various locations, Chatham-Kent, Elgin County, Brantford Bridge rehabilitations 2013 n/a

(34)

# Hwy Status Location Type of Work Date (km)

31 401/403 New Interchange ramps, east of London Resurfacing 2012 n/a 32 402 Underway London Line, First School Rd., Arkona Rd., Centre Rd. underpasses, west of StrathroyBridge rehabilitations 2012 n/a 33 402 New East of Strathroy Culvert rehabilitation 2012 n/a 34 402 New 1.7 km east of Hwy. 21 to Kerwood Rd., Warwick Resurfacing 2012 19.6 35 402 New Front St. to Mandaumin, eastbound lanes Resurfacing 2012 15.3

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(35)
(36)

# Hwy Status Location Type of Work Date (km)

1 3 New Canfield, Haldimand County Reconstruction / drainage 2013 0.7

2 3 New Kettle Creek, Balaclava St. underpass, First Ave. underpass, Burwell Rd.

underpass, St. Thomas Bridge rehabilitations 2014 n/a 3 3 New Delhi to Simcoe Resurfacing 2013 14.1 4 6 New Chatsworth to Owen Sound Resurfacing 2013 11.0 5 6 & 21 New Springmount to Hepworth including Shallow Lake Bridge, Stokes River Bridge,

Sauble River Bridge

Resurfacing / bridge rehabilitation/ bridge

/ culvert replacement 2014 14.7

6 89 New

Mount Forest to Shelburne including South Saugeen River Bridge west, South Saugeen River Bridge east, Mud Creek Bridge, Grand River Bridge

Bridge replacement /

rehabilitation 2014 n/a 7 89 New Harriston to Mount Forest Resurfacing / culvert replacements 2013 14.5 8 401 New Victoria Rd. to Orford Rd., westbound lanes Chatham-Kent Resurfacing 2013 8.0 9 401 New Kent Bridge Rd. to Victoria Rd. eastbound lanes, Chatham-Kent Resurfacing 2013 7.3

10 401 New Highway 40 interchange, Chatham-Kent

Bridge replacement / culvert rehabilitation / interchange improvements

2014 n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(37)

Hwy Location Type of Work

Project Length (km)

3 Hwy 19 / Vienna Rd., Tillsonburg Intersection improvements n/a 3 Essex Rd. 34 to Essex Rd. 27, west of Leamington Resurfacing 10.2 4 Kippen River Bridge and Ausable River Bridge, Hensall Bridge rehabilitation n/a 4 Talbotville to Middlesex Rd. 35 Resurfacing 5.9 4 Medway Creek Bridges, north of London Bridge rehabilitations n/a 6 Argyle St. Grand River Bridge, Caledonia, Highway 7191 Bridge replacement n/a 6 Hwy. 401 to south of Clair Rd. Resurfacing 4.8 6 Various locations, Hepworth to Tobermory Culvert rehabilitations n/a 6 Rocky Saugeen River Bridge and Pottawatomi River Bridge Bridge rehabilitation n/a

6 Jarvis to Hagersville Resurfacing 8.2

6 Hagersville to Caledonia Resurfacing 14.0

6 Morriston to Hwy 401 Resurfacing 1.1

7 Perth Rd. 9, Wildwood Conservation area to Stratford Resurfacing / culvert rehabilitations 9.0

7 Kitchener to Guelph Resurfacing 9.7

(38)

Hwy Location Type of Work (km)

8 Mitchell to Sebringville Resurfacing 9.4

9 Kincardine to Bruce Rd. 7 Resurfacing 8.0

21 Port Elgin to Southampton to Alvanley Resurfacing 26.2

23 Bornholm to Monkton Resurfacing 8.8

23 Mitchell to Bornholm Resurfacing 7.4

24 Brant Rd. 5 to Glen Morris Rd., north of Brantford Resurfacing 4.8 26 Thornbury to Collingwood Rehabilitation 13.2 40 Churchill Rd. to McGregor Rd., Sarnia Resurfacing 3.2

40 Chatham to Wallaceburg Resurfacing 20.4

85 Krug St. to Lancaster St., Kitchener Resurfacing / bridge rehabilitations 2.8 401 Hespeler Rd. underpass, Cambridge Bridge rehabilitation n/a 401 Fountain St., Speedsville Rd., Hwy 8 Ramp, Cambridge Bridge replacement / rehabilitation n/a 401 Hwy 19 underpass Bridge replacement / interchange improvements n/a 401 Norwich Ave. underpass Bridge replacement / interchange improvements n/a

(39)

Hwy Location Type of Work

Project Length (km)

402 Miller Rd., Springer Rd., Carriage Rd., Sharon Rd., Woodhull Rd., Westdel Bourne, White Oak Rd. underpasses, west of

London Bridge rehabilitations n/a

402 Kerwood Rd. to Middlesex Rd. 81, west of Strathroy, eastbound lanes Resurfacing 20.3 402 Strathroy to London Bridge rehabilitations n/a 402 Adelaide Rd. underpass, CNR overpass, Sydenham River Bridge east of Strathroy Bridge rehabilitations n/a 402 / 40 Hwy 402, Front St., and CNR overpass and Hwy 40 / C.N.R. overhead, Sarnia Bridge rehabilitations n/a 403 Ewing Dr., Tollgate Rd., Hwy 24 / King George Rd., North Park St., West St. and Wayne Gretzky Pkwy underpasses,

Brantford Bridge rehabilitations n/a

403 Grand River Bridge, west of Brantford Bridge rehabilitation n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

(40)
(41)

Ontario continuously looks at its long-term

transportation infrastructure needs to determine

where the greatest benefits can be realized for

our economy and the lives of Ontarians. Planning

beyond 2016 ensures our highways and bridges

are built and maintained to support traffic levels

and transportation needs for decades to come.

Identified on the following pages are some

projects in the planning stages that could

support growth, improve traffic flow and increase

safety in southern Ontario. These projects are

still subject to further study and prioritization,

and may be considered for future development.

(42)

GTA - West Corridor Planning and EA Study Niagara to GTA Corridor Planning and EA Study

Peterborough / Hwy 7 Area Planning and Highway Corridor Study Simcoe Area Multi-Modal Transportation Strategy Brantford to Cambridge Corridor Study

Highway Description

3 Windsor to Leamington, Phase 3 5/6 Interchange, Hamilton

6 Hanlon Expressway interchanges, Guelph 6N Extension to Caledonia

6N North of Freelton to Maltby Rd., Guelph 7 Hwy 7, Town of Perth limits

7 Scott’s Corners to Fowlers Corners, Peterborough 7/8 Stratford to New Hamburg

8 Sportsworld Dr. to Hwy 401, interchange improvements, Kitchener 12 South Jct. Hwy 48 to north Jct. County Rd. 48, Beaverton

17 Arnprior to Renfrew

(43)

Highway Description

35 Hwy 115 to Lindsay

40 Lambton Rd. 34 to Hwy 402, Sarnia

89 Hwy 400 to Rosemont

400 Toronto to Barrie

400 Major Mackenzie Dr. to King Rd., York (HOV lanes)* 401/400 Interchange, Toronto

401 Montreal St. to Hwy 15, Kingston 401 Burnham St. to County Rd. 45, Cobourg 401 Mississauga to Milton

401 Cambridge to Wellington County / Halton region boundary 401 Hwy 8 to Hespeler Rd., Cambridge

401 Chatham - Kent

403 QEW to Hwy 407, Oakville / Mississauga

404 Hwy 7 to Newmarket

406 Welland to Port Colborne

410 Hwy 401 to Bovaird Dr., Brampton

427 Hwy 409 to Hwy 407, Toronto (HOV lanes)*

(44)

QEW McLeod Rd. to Mountain Rd., Niagara Falls QEW Garden City Skyway, Niagara

QEW Hwy 403 interchange, Oakville

QEW Hwy 403 to Hwy 427

*

BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

(45)
(46)

2011 Southern Ontario

Accomplishments

New highways

62 km

New bridges

5

Highways rehabiliated

562 km

Bridges rehabiliated 56

major southern Ontario highway projects

completed last year.

(47)

Highway 7 was widened from two lanes to

four lanes west of Ottawa from Highway 417

to Carleton Place, a growing area in Eastern

Ontario. Economic benefits of this widening

include an increase in development and the

number of businesses.

The drive to downtown Ottawa has been

shortened by 25 minutes and commuters can

use HOV lanes and carpool. They can also use

two new commuter parking lots at Dwyer Hill

Road and Cemetery Road.

Between Highway 417 and Carleton Place,

26 kilometres of highway was widened. An

8-kilometre stretch was paved using perpetual

pavement. This type of pavement is tough

enough to withstand serious stress for at least

50 years. If needed, in the future only the

surface layer of the highway will be repaved

saving time and money.

(48)

7 Brock Rd. to Durham Rd. 30, Durham Resurfacing 9 Hwy 27 to Simcoe Rd. 10, Shomberg Resurfacing 11 Laclie St. to South Sparrow Lake Rd., Simcoe Resurfacing

11 Killworthy, Sparrow underpass, Gravenhurst Bridge rehabilitation 11 Hwy 118 to Muskoka Road 117, Bracebridge Preventive resurfacing 12 CNR overhead bridge, Orillia Bridge replacement 26 Hwy 26 at Simcoe County Rd. 28 Signal installation 35 Muskoka Road 117 southerly, Dorset Preventive resurfacing 35/115 Wilmot Creek and Farewell Creek culverts, Clarington Culvert rehabilitation 48 South of York Rd. 9 to 4 km north of York Rd. 9 Resurfacing

60 Hwy 35 to Oxtongue Lake Narrows, Dwight Resurfacing 60 Algonquin Park West Gate westerly Resurfacing

89 Nottawasaga River Bridge, Alliston Bridge rehabilitation 400 St. Vincent St. Bridge, Barrie (ISF)* Bridge rehabilitation 400 Innisfil Creek culvert, Innisfil (ISF)* Culvert rehabilitation

400 Hwy 88 interchange, Simcoe Interchange reconstruction 400 Simcoe Road 19 to north junction Hwy 12/400 interchange, Simcoe Resurfacing

(49)

Hwy Location Type of Work

401 Renforth Dr. north and southbound Bridges (ISF)* Bridge rehabilitations 401 Dixie Road underpass, Mississauga (ISF)* Bridge rehabilitation 401 Various locations Overhead sign structures 401 Trafalgar Rd., Milton Bridge rehabilitation 401 Hwy 404 to Victoria Park Ave. eastbound collector, 500 m Noise barrier panel replacement 403 Central Parkway to Winston Churchill Blvd., Mississuaga Resurfacing

404 Aurora Rd. to Stouffville Rd., York Resurfacing

409 Hwy 401 to Hwy 427, Toronto

Resurfacing / bridge rehabilitations /median barrier replacement / highway lighting QEW Victoria Ave. to East of Casablanca Blvd. (Niagara Bound) Resurfacing

Various Various culverts, Toronto-Durham Area Culvert rehabilitation Various Various locations Bridge rehabilitation Various Various locations Selective resurfacing

*

BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

(50)

7 Resurfacing - Perth East To West Limits Resurfacing

7 Hwy 417 to Carleton Place , Phase 3 of 3, Ashton Station Rd to Carleton Place 2 to 4 lane widening/bridge rehabilitation 7A Fleetwood Creek Bridge Bridge Rehabilitation 17 Deux Rivieres to northeast regional boundary Resurfacing

17 Renfrew Rd 40 to Cobden Resurfacing

17 Renfrew Rd. 4 westerly to Renfrew Rd. 61 Resurfacing

28 Stoney Lake Rd to Youngs Point Resurfacing and Intersection improvements 33 Intersection Improvements Speers Blvd, Amherstview Intersection Improvements

35 Durham Rd. 20 To Hwy 7A Resurfacing

37 Moira River Bridge, North Of Belleville Bridge Rehabilitation 41 Vennachar Junction northerly to Hwy 28 Resurfacing

41 Snake River Bridge Bridge Rehabilitation

62 Crofton To Rossmore Resurfacing

115 Hwy 35 To Tapley Quarter Line Resurfacing/concrete re-texuring 401 Frontenac Rd. 38 To Lennox & Addington Rd. 4 New paved shoulders

401 Trenton To Brighton Resurfacing

401 CPR Overhead Removal, Prescott Bridge Rehabilitation Interchange

(51)

Hwy Location Type of Work

416 Rd 6 To Rd 73, Manotick Resurfacing

417 Kenyon-Roxborough Rd to Limoges, westbound lanes Resurfacing

417 Tayside Municipal Drain Culvert Replacement 417 Skye Rd Overpass, St. Bernardin Bridge Rehabilitation 417 - OQW Hwy 416 to Anderson Rd. (Phase 3A) Carling Ave. eastbound bridge, Ottawa Bridge replacements/widening Various Culvert replacements various highways Culvert replacements

(52)

3 Aylmer to Carter Rd. Resurfacing 3 John Pound Rd. To Simcoe St., Tillsonburg Resurfacing

4 Kippen to Clinton Resurfacing / culvert rehabilitations 6 Hanlon Expressway, Guelph Intersection improvements

6 Durham to Dornoch Resurfacing

7&8 Waterloo Rd. 51 to Fischer-Hallman Rd., Kitchener Resurfacing 7&8 Shakespeare to New Hamburg Resurfacing

8 Perth Rd. 135 to Stratford Resurfacing / bridge rehabilitation

21 Hwy. 9 to Tiverton Resurfacing

21 Shashawanda Creek Bridge, north of Forest Bridge replacement 21 Amberley to Kincardine, various locations Bridge rehabilitations 21 Underwood to Port Elgin Culvert rehabilitations 21/9 Tiverton to Underwood and Kincardine to Bruce County Rd. 7 Culvert rehabilitations 24 Brant Rd. 53 to Hwy 403, west of Brantford Resurfacing / bridge replacement 24 Brant Rd. 23 to Brant Rd. 5, north of Brantford Resurfacing

40 Rokeby Line to Churchill Line, Sarnia Resufacing / bridge rehabiliations 40 Wallaceburg to Chatham-Kent Rd. 33 Bridge / culvert rehabilitations 401 Blacks Rd., Fumival Rd., Dunorough Rd., Southminister Bourne, Bridge Rehabilitations

(53)

Hwy Location Type of Work

401 Hwy 4 to Hwy 402, London Resurfacing

401 Highbury Ave., London to Regional Boundary, various locations Resurfacing 401 Woodstock to Cambridge Four to six-lane widening 402 Nauvoo Rd. to Centre Rd., Strathroy Resurfacing

402 Waterworks Rd., Camlachie Rd., Oil Heritage Rd., Hwy 21, east of Sarnia Bridge Rehabilitations 402 Longwoods Rd. To Woodhull Rd., London Resurfacing

(54)

References

Related documents

Please select an occupational family, group, and sub-group for your first job after graduation from Auburn University.. Architecture and Engineering Occupations

• CAIR Research pilot using community based participatory principles to document stories of resilience among urban American Indian elders at the Tucson Indian Center. •

(1872–2016) of the floodplain vegetation of a segment of the heavily regulated upper Rhine River to different static approaches for the es- timation of its PNV a) a statistical

(C) After determining a set of partitions that maximize the modularity Q (or a similar quality function), it is interesting to test whether the community structure is different

[ 3 ] In order to calculate the self-sputtered neutral flux at the Moon, we must assemble three components: (1) the den- sities and distributions of the various neutral constituents

The Career + Professional Development Office is responsible for the review and approval of co-op opportunity postings, but Emily Carr and the Career + Professional Development

Kematangan karir merupakan cerminan dari proses perkembangan individu untuk meningkatkan kapasitas dalam membuat keputusan karir (Richard, 2007, hlm. 475), menyatakan

Rural Americans throughout Yadkin Valley’s service area, and indeed throughout the markets of NTCA, OPASTCO, and WTA members, are enjoying universal voice service, access to