• No results found

Postoperative Nausea and Vomiting Following General Anaesthesia: A Prospective Study on Surgical Patients in the University of Calabar Teaching Hospital, Calabar, Nigeria

N/A
N/A
Protected

Academic year: 2020

Share "Postoperative Nausea and Vomiting Following General Anaesthesia: A Prospective Study on Surgical Patients in the University of Calabar Teaching Hospital, Calabar, Nigeria"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2. Incidence of postoperative nausea and vomiting among gynaecological and non- gynaecological patients
Table 3. Incidence of postoperative nausea and vomiting among male and female patients
Table 6. Induction agents and PONV
Table 8. Intraoperative analgesics and PONV

References

Related documents

In this pumping test facility we obtain, for each fixed pumping head, the pumped flow versus input voltage, simultaneously we measure the consumed current and

Bloxham, Susan (2014) Assessing assessment: new developments in assessment design, feedback practices and marking in higher education.. In: Fry, Heather,

Das Hauptproblem ist jedoch die kanzerogene Wirkung nach Langzeitbelastung mit den aromatischen Aminen und die beiden hier untersuchten Amine 4-ABP und o- Toluidin sind als

In this work, glassy carbon electrodes were modified with molybdenum and manganese oxides by means of electrochemical deposition and the modified electrodes were used for

Relationships of herbage production (lb./acre) in the spring to mulch the previous fall on Sutherlin Soil, Hopland Field Station, California. Other measures

How- ever, since not all subjects were willing to participate this program, we further categorize the baseline sample into two groups: those who received health promotion

14 The DISarm system shall allow government officials to enter information concerning contractor companies, including company location, type of business, company contact.. 15

(2010) and Ram et al (2013) studies the complex system having two subsystem with controller and standby complex system with waiting repair policy using