An Efficient Combination of Dispatch Rules for Job-shop Scheduling Problem

N/A
N/A
Protected

Academic year: 2021

Share "An Efficient Combination of Dispatch Rules for Job-shop Scheduling Problem"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. Distribution of makespan when a second priority job is se- se-lected only once (ft10)
TABLE III
Table VI presents the result of the combined rule U j  . By comparing Table IV with Table VI, a number of the mark “*” is fewer than Table IV
TABLE VII

References

Related documents

We commenced training by introducing Dandelion traineeship with the building blocks of a Software Testing lifecycle such as Methodologies, Terminology, and

ST (Small Tree): 15’- 30’ LS (Large Shrub): 8’-taller MS (Medium Shrub): 4’- 8’ SS (Small Shrub): less

It has to be noted that the set of key elements works for a correct OHSMS implementation, in order to obtain an assessment of the organization and management model adopted

The ubiquitous nature of social media in higher education, the frequency of racialized hate dispensed on social media on college campuses, the need to advance research

These results indi - cate that the main driving force for economic growth before de- centralization was the education sector, whereas, following fiscal decentralization,

Census Bureau, Current Population Survey, Annual Social and Economic Supplements Note: The 1999 estimates reflect the results of verification questions that were asked of people

 Via  functional  design,  technical

(2) on the roof of a #building#, greater than four feet in height, as measured from the maximum height limit, or the finished level of the roof, whichever is higher, provided