Addendum to RFP for Supply, Installation and Maintenance of Server, Storage and

Virtualization Solution

Ref No.: HO/DIT/Server, Storage and Virtualization /2015-16/01 Date: 13.04.2015

Page

1

of

3

Addendum to RFP for

Supply, Installation and

Maintenance of Servers, Storage

and Virtualization Solution

Allahabad Bank

Ref No.:HO/DIT/SERVER, STORAGE & VIRTUALIZATION/2015-16/01 Dated: 13.04.2015

Addendum Date: 07

th

August, 2015

(2)

Addendum to RFP for Supply, Installation and Maintenance of Server, Storage and

Virtualization Solution

Ref No.: HO/DIT/Server, Storage and Virtualization /2015-16/01 Date: 13.04.2015

Page

2

of

3

Introduction

The Bank has floated the Tender Ref No.

HO/DIT/Server, Storage &

Virtualization/2015-16/01 Dated: 13.04.2015

for Supply, Installation and

Maintenance of Server, Storage and Virtualization Solution in the Bank.

Pre Bid Queries Clarifications

:

As per the terms of the RFP document, a pre–bid meeting was held on 09

th

July,

2015 attended by the bidder’s representatives.

As an outcome of the clarifications sought by the bidders at the pre-bid meeting

and the queries received from the bidders by e-mail, this addendum dated

07.08.2015 to the RFP document is being issued herewith. The Addendum covers

clarifications to the queries raised by the bidders, and other additional information,

which the Bank deems fit to be furnished to the bidders.

Bidder should submit a detailed masked commercials along with technical bids,

which must include all the line items of bill of material with detailed configurations,

quantity etc.

All other terms and conditions of the Tender document remain unchanged. Any

deviations will not be entertained with respect to the legal, terms & conditions of

the RFP. Please treat this Addendum as an integral part of the Tender document

issued.

No further queries pertaining to this Addendum will be entertained.

Chief Manager (IT)

Allahabad Bank

DIT-Head Office

(3)

Addendum to RFP for Supply, Installation and Maintenance of Server, Storage and

Virtualization Solution

Ref No.: HO/DIT/Server, Storage and Virtualization /2015-16/01 Date: 13.04.2015

Page

3

of

3

Pre Bid Queries Clarifications

:

1. Timeline for P2V migration of all applications should not be more than 14 weeks.

Procurement of hardware and planning of migration are independent activities,

so it should carry out parallel and not incur additional time.

2. The Schedule of RFP is amended as under:

Last Date and time for sale of RFP

24

th

August 2015 17:00 Hours

IST

Last date and time of submission of

Bid(Technical & Commercial)

25

th

August 2015 15:30 Hours IST

Date and time of opening of Technical Bids

25

th

August 2015 16:30 Hours IST

Date and time of opening/downloading of

Commercial Bids

Will be intimated to the qualified

bidders in due course.

3.

Other Clarifications:

Any payment related, legal, contractual, obligation,

liability, terms and condition or related concerns by any bidder are regarded as

"

RFP Requirement Stands

” and

any deviations in these areas will not be

entertained.

Other clarifications/queries/clauses raised by the bidders are

amended/ clarified in the following table. Apart from these queries no other

changes are done in the RFP.

Responses towards all other queries /clarifications/clauses raised by the

bidders may be treated as “RFP Requirement Stands”

(4)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

1 Addendum dated 30.06.2015

Clause:10.2.1.14

Page 4 Should co-exist with the current environment as there would be some applications on non-virtualized environment interacting with applications in virtualized environment

Please detail 'current environment' and 'some applications' Current environment means existing setup which are not getting altered or affected during migration. * some of the applications could be still with non-virtualization environment post migration; those applications which are hosted in non end of support servers.

2 Addendum dated 30.06.2015

Clause:10.6.15 & 10.7.4

Page 7 General Queries What are the 'existing monitoring and ticketing solutions available at

Bank' Bank is being used Tivoli* for monitoringand CCM.net is being currently used for ticketing.

3 Addendum dated 30.06.2015 Clause:10.7.50

Page 10 Solution should be integrated to existing ITIL Service Support Areas

functions including but not restricted to Event Management, Incident Management, Request fulfillment, Problem Management, Access Management

List of 'existing ITIL Service Support' tools required Bank is being currently used Tivoli* for monitoring and Bidder is expected to factor integration with existing Tivoli component. Pl refer RFP clause 2.4.28 & 2.4.29 for more details.

4 Addendum dated 30.06.2015 Clause:10.7.59

Page 10 Solution should be able to extend (through emails/hyperlink/SMS) the

existing helpdesk of the Bank for Call Log and escalation maintenance.

Which are 'existing helpdesk of the Bank for Call Log and escalation

maintenance' under consideration ? CCM.net is existing application which iscurrently being used for helpdesk 4 Addendum dated

30.06.2015 Clause:10.7.59

Page 10 Solution should be able to extend (through emails/hyperlink/SMS) the

existing helpdesk of the Bank for Call Log and escalation maintenance.

Which are 'existing helpdesk of the Bank for Call Log and escalation

maintenance' under consideration ? CCM.net is existing application which iscurrently being used for helpdesk

5 RFP Page 2, Page 3

of Schedule A-Bill of Material

Hardware / Software / Licenses: Backup server (1 rack mount server and adequately factored in a VM as redundant server of primary backup server)

Backup server need to have Tape Library access where as Tape Library can't be accessible from any VM running on Intel platform. Hence we need to have physical server even for failover, Pl suggest do we need to propose backup server in redundant mode?

Yes; Bidder can propose a pair of backup servers in DC and DR

6 RFP RFP Page 15,

point 2.4.48 General Queries What is the Operating system on clients? Microsoft Windows

7 RFP RFP Page 15,

point 2.4.48 General Queries Do the symantec management console configured and hardened ? It is expected to be as it is in runningcondition, if the successful Bidder finds any flaws or challenges during migration or implementation Bidder has to take the ownership and responsibility to fix the issue

8 RFP RFP Page 15,

point 2.4.48 General Queries Is the console server configured to push the new licenses ? It is expected to be as it is in runningcondition, if the successful Bidder finds any flaw or challenge during migration or implementation Bidder has to take the ownership and responsibility to fix the issue

(5)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

9 RFP RFP Page 15,

point 2.4.48 General Queries need to confirm whether Bank is looking for any upgradation on thesysmantec endpoint ver 12.1 to latest. Version upgradation and updates arecontinuous process and Bidder is expected to factor for the necessay upgradation and updates during the contract period.

10 RFP RFP Page 104,

note 2 General Queries As per our understanding, the OS Licenses will be provided by the Bank.Please confirm whether the understanding is correct. Bidder is expected to use the existingLicenses available with the bank. If solution sized and provided by the bidder requires upgradation of Licenses, the same has to be factored and provided by the bidder at no additional cost to the Bank.

11 RFP RFP Page 56

point 3.34 General Queries Will the servers which won't be bought back require monitoring? Yes, Bidder is expected to factorcomponent for monitoring of such servers

12 RFP RFP page 11,

point 2.4.23 General Queries Would Bank like to continue with the Old Tivoli Hardware Setup or go fornew Hardware Setup. Bidder is expected to consider Tivoliservers also for P2V migration 13 RFP

Clause:2.4.12 11 There will be separate virtual machines forWeb Server, Application Server, and Database Server etc. All will be in different logical zones separated through firewall to communicate to each other. Accordingly the connectivity should be established for making them operational. In no case communication will be permitted without Firewall and/or IPS. Bidder has to ensure the communication in the desired way and all the required hardware, software etc, if required will be provided by bidder only.

Is bidder required to provide firewall and IPS ? Bidder needs to use Bank's existing firewall / IPS; however if bidder feels necessary then they may keep provision for virtual firewall / IPS as part of sizing. 13 RFP

Clause:2.4.12 11 There will be separate virtual machines forWeb Server, Application Server, and Database Server etc. All will be in different logical zones separated through firewall to communicate to each other. Accordingly the connectivity should be established for making them operational. In no case communication will be permitted without Firewall and/or IPS. Bidder has to ensure the communication in the desired way and all the required hardware, software etc, if required will be provided by bidder only.

Is bidder required to provide firewall and IPS ? Bidder needs to use Bank's existing firewall / IPS; however if bidder feels necessary then they may keep provision for virtual firewall / IPS as part of sizing.

14 Addendum dated 30 june 2015 /scope considerations 3

2 Bidder needs to adequately factor 10G ports as required for the implementation of the project for bank’s core router and core switches

What is the model of Core Router & Core Switch, also what is the EOL &

EOS date for Core Router & Switch ? Core Router: CISCO ASR1006Core Switch: CISCO WS-C4510R+E. EOL/EOS dates are not yet published by OEM. Bidder needs to factor the interface and compatible line cards for the router and switch as per their proposition (like SFP and / or SFP+ and / or GBIC)

15 Addendum dated 30 june 2015/ Clause:10.6.3

6 Solution should be able to provide existing

Host Firewall Protection Please clarify on the current Host firewall protection used by bank Symantec 16 Addendum dated 30

june 2015 Clause:10.6.4

6 Solution must offer ability to utilize existing Intrusion Detection System / Intrusion Protection System

What is the EOL & EOS date for existing IDS & IPS. Also what is the

priod of licences procured for existing IPS & IPS ? Perimeter IPS: Cisco SourcefireInternal IPS: IBM XGS. EOL & EOS dates are not yet declared.

(6)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

17 Addendum dated: 30 june 2015

Clause:10.1.1

3 On-demand Self-service: Applications should have self provision computing capabilities. This shall also provide Automation and Orchestration, Capacity Management, Life Cycle Management and Catalogue and directory Maintenance.

Clarity from Bank is required related to Directory Maintenance. It is Active Directory in case of Microsoft OS and LDAP in case of UNIX / LINUX OS. Bank is currently connected to all domain users through Microsoft Active Directory.

18 RFP

Clause:2.4.28 13 The Bank is having Tivoli EMS solutiondeployed for management and monitoring of storage and backup capabilities (TBSM) for it’s DC and DRC environment. The Bidder needs to adequately factor additional EMS / Storage / Backup tool licenses and integration of such licenses with proposed Virtualization Management, Monitoring and Audit tool to ensure direct extraction of SLA measurement report from single window EMS platform., The bidder also needs to adequately plan the capacity of EMS / Storage and Backup Mgmt. hardware and propose the upgradation and re-sizing of EMS / Storage / Backup hardware (if any).

There are some physical servers(qty=43) which Bank have retained with them.(These are not included in the server Buyback list.) How will the Backup and monitoring of these servers happen?

Bidder is required to provision for such backup of all servers which are still in support.

18 RFP

Clause:2.4.28 13 The Bank is having Tivoli EMS solutiondeployed for management and monitoring of storage and backup capabilities (TBSM) for it’s DC and DRC environment. The Bidder needs to adequately factor additional EMS / Storage / Backup tool licenses and integration of such licenses with proposed Virtualization Management, Monitoring and Audit tool to ensure direct extraction of SLA measurement report from single window EMS platform., The bidder also needs to adequately plan the capacity of EMS / Storage and Backup Mgmt. hardware and propose the upgradation and re-sizing of EMS / Storage / Backup hardware (if any).

There are some physical servers(qty=43) which Bank have retained with them.(These are not included in the server Buyback list.) How will the Backup and monitoring of these servers happen?

Bidder is required to provision for such backup of all servers which are still in support.

19 Addendum dated 30 june 2015

Clause:10.1.2

3 Resource Pooling: Computing, storage and network resources are shared to serve multiple applications with location

independence and are discoverable over IP with minimum latency. Server, Storage and Network Virtualization Software with required security capabilities would be required to ensure resource pooling.

Clarity required from Bank on location independence .True location independence calls for heavy investment on load balancer and storage geocluster / metro cluster features. This will increase the investment to great extent.

Bidder needs to factor location independence in true sense, however it should be factored as part of 2nd year's implementation.

20 Addendum dated 30 june 2015

Clause:10.2.1.11

4 Solution should support 3rd party cloud management solutions and have an API that allows for custom development

Bank to clarify regarding the services requirement and integration/

development scope. Bank is not in a position to clarify this incurrent state of Indian Banking scenario because integration may be required with other oraganizations like Credit buraeu, regulator, statutory authority, payment system, RRBs or other Banks. 21 Addendum dated 30

june 2015 Clause:10.3.13

5 Should have software load balancing feature to ensure while dynamically scaling up/down virtual machines.

Need calrity from bank as these kind of features requires additional software and itegration at multiple layers including load blancer and orchestrator along with hypervisor .

Bidder is required to provision for any such necessary components.

22 Addendum dated 30

june 2015/10.3.14 5 Software should have the capability to createVirtual Machines with required number of vCPUs.

Request Bank to please specify the quantities. Bidder should factor with respect to the solution sizing proposed.

(7)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

23 Addendum dated 30 june 2015

Clause:10.6.2

6 Solution should have capability to apply ACLs

for access at network layer These are network specifications. Not Virtualisation/cloud specifications.Request Bank to remove. Considered as removed. 24 Addendum dated 30

june 2015 Clause:10.6.2.

6 Solution should be able to provide existing Host Firewall protection for the virtual machine also.

These are network specifications. Not Virtualisation/cloud specifications.

Request Bank to remove. Solution should be able to provide existingHost Firewall Protection 25 Addendum dated 30

june 2015 Clause:10.6.4

6 Solution must offer ability to utilize existing Intrusion detection System / Intrusion Protection system to seamlessly extend into Virtualization environment

These are network specifications. Not Virtualisation/cloud specifications.

Request Bank to remove. Solution must offer ability to utilize existingIntrusion Detection System / Intrusion Protection System

26 Addendum dated30 june 2015

Clause:10.8.9

11 Solution should provide a Knowledge base to store history of useful incident resolution or integrate into the existing knowledge base if available with the Bank.

Request Bank to remove as it is an EMS function, not an Virtualisation

Software function. Bidder is required to factor intergrationbetween Virtualization management & monitoring tool and existing or proposed EMS for generation of incident and issue resolution knowledge base.

27 RFP FMS The RFP asks for DB Support, Please share the Databases

OEM,Version & Count. Bidder needs to factor DB support for allused DBs like Microsoft SQL Server, Oracle, DB2 and other open source Databases.

27 RFP FMS The RFP asks for DB Support, Please share the Databases

OEM,Version & Count. Bidder needs to factor DB support for allused DBs like Microsoft SQL Server, Oracle, DB2 and other open source Databases.

28 Addendum dated

25.05.2015 3 SAN Switch: All 3 SAN switches published in“Schedule C- Current Configuration Details” at DC and DR in HA mode (total 6 switches in DC and 6 switches in DR, total 12 switches) are 100% utilized. All these switches are reached End of Support. Bidder needs to consider the replacement of these above switches with connectivity with in scope new hardware to be procured and in-support hardware as mentioned in the RFP.

We understand that x86 servers which will be migrated on virtual setup will go away after completion of this project, in that case ports will become free on these SAN switches.

As per this clause replacement of SAN switches is asked, however these many ports would not be required once x86 servers are diconnected after migration.

Please confirm how many ports are required for existing devices in the new SAN switches bidder will be proposing for this tender

Bidder needs to consider all in support servers which are yet to reach end of support during sizing of the solution.

29 RFP 13 The bidder also needs to adequately plan the capacity of EMS / Storage and Backup Mgmt. hardware and propose the upgradation and re-sizing of EMS / Storage / Backup hardware (if any).

New backup servers will be provided as asked in the RFP. Pleae clarify

the hardware requirement if any for EMS setup. Bidder should adequately factor andpropose.

30 RFP Page No: 113

Point 3 …….Should have active / passive anddisaster recovery setup also Please suggest if we require to quote and configure backup server in HAmode or it can be configured on a single physical machine. Please note in commercial sheet it is mentioned additional virtual server to be planned for backup which is not feasible to deploy in virtual server. if Bank needs HA deployment then two physical servers required at each site.

It should be considered in High Availability mode.

(8)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

31 RFP Page No: 113,

11 and 12.10 The proposed backup solution must supportat least AES 256-bit encryption capabilities Remove point 12.10 as it is duplicate for point 11 Remove point 12.10as it is duplicate for point 11 Considered as removal of the duplicate

32 RFP Page No: 113

Point 4 ….Backup Licensing (to VTL) shall supporttotal storage capacity of source data (Virtual servers).

Delete VTL is not part of the current backup architecture and RFP

requirement. Considered as removed

33 RFP Page No: 113

Point 4 The proposed backup solution shouldsupport both LAN and LAN Free backups and should offer CPU independent Licensing policy for the entire solution.

The proposed backup solution should support both LAN and LAN Free backups (only on clients which are SAN connected) and should offer CPU independent Licensing policy for the entire solution. SAN based backups are feasible with clients which have SAN connectivity (HBA cards installed)

The proposed backup solution should support both LAN and LAN Free backups (only on clients which are SAN connected) and should offer CPU independent Licensing policy for the entire solution.

34 RFP Page No: 113

Point 10 The proposed backup software shouldsupport searching data using either structured and unstructured Information. The proposed backup software should support contextual search based on meaning.

The proposed backup software should support searching data using either structured and unstructured Information. Support for contextual search based on meaning is vendor specific.

The proposed backup software should support searching data using either structured and unstructured Information. Semantic search is optional however it is recommended.

35 RFP RFP page no

111 SAN SWITCH - Should be minimum of 24ports of at least 8 Gbps scalable to minimum of 48 FC ports

Existing SAN switches specifications are not sufficient. Please change the specifications. Based on our due diligence we find out that Bank will need 96 ports SAN switches with minimum 72 ports activated. Please revised the SAN switches specifications.

Bank has mentioned a minimum spec, Bidder needs to factor with respect to their solution sizing and provisioning.

35 RFP RFP page no

111 SAN SWITCH - Should be minimum of 24ports of at least 8 Gbps scalable to minimum of 48 FC ports

Existing SAN switches specifications are not sufficient. Please change the specifications. Based on our due diligence we find out that Bank will need 96 ports SAN switches with minimum 72 ports activated. Please revised the SAN switches specifications.

Bank has mentioned a minimum spec, Bidder needs to factor with respect to their solution sizing and provisioning.

36 RFP page no 112 BACKUP SERVER - Upto 16 GB per slot, at

least 8 slots in totals". Does this mean backup server to be fully populated with 16 GB memoryDIMM i.e. 128 GB per server ? These specifications increase hardware cost. This is much higher sizing for backup server.

Bank has mentioned a minimum spec, Bidder needs to factor with respect to their solution sizing and provisioning.

37 RFP RFP page no

112 18 Form Factor Rack Mountable Maximum2U Form factor : Rack / Blade Rack

38 RFP RFP page no

112 Giagabit Ethernet Adapter - Two numbers ofdual ports Ethernet cards of 10/100/1000 Mbps. All ports should' support teaming feature and teaming to be implemented

Please revise the specification as" Dual ports Ethernet/FCOE cards of 10 Gb/s. " 10 Gbps dual ports cards are recommended to increase LAN based backup.

Giagabit Ethernet Adapter - Two numbers of dual ports Ethernet/FCOE cards of 10/100/1000 Mbps / 10 Gbps. All ports should' support teaming feature and teaming to be implemented.

39 RFP RFP page no

112 HBA CARD Two numbers of single port8Gbps HBA card to connect to SAN SwitchesPlease revise the specification as" Dual ports FC HBA / FCOE cards of 8Gb/s OR higher." 8 Gbps dual ports cards are recommended to increase LAN free backup.

Dual ports FC HBA / FCOE cards of 8 Gb/s OR higher.

40 Addendum dated

30.06.2015 Page 4 Clause10.3 Hypervisor Kindly clarify whether specifications provided in section 10.3 Hypervisoroverrule hypervisor related clarifications provided in previous Addendum and RFP.

Clarifications provided in previous Addendum and RFP will prevail. 41 Addendum dated

30.06.2015 Page 6 Clause10.4.3 Solution should provide the capability tomigrate the Virtual Machine files from one storage array to another storage server

Is Storage vMotion to be implemented or Bank wants to evaluate as

(9)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

42 Addendum dated

30.06.2015 Page 7 Clause10.6.11 Solution should have 2 factor authenticationfor accessing virtual machines Please clarify whether 2 factor authentication is required forAdministrative purpose ? If so please provide how many admin users will have access to virtual machines.

Please suggest if the Data Center East-west traffic needs to be monitored and introspected in a policy driven manner ? Network virtualization / NSX needs to be proposed in that case.

Bidder consideration is correct, bidder may consider only five admin users.

43 Addendum dated 30.06.2015 Page4, 8,11Clause 10.2.1.5, 10.7.25, 10.7.61, 10.7.62, 10.7.63,

10.7.61 Solution should possess capabilities to extent resource & cloud fabric

management onto other Private Clouds 10.7.62 Solution should be able to move identified workloads to another private cloud or burst into available public cloud (leaders as identified in Gartner Magic Quadrant). 10.7.63 Solution should be able to give back its capacity that can be used by other private cloud

10.7.25 Solution should be able to manage virtual and physical assets across multiple Private Clouds - implying that a specific Cloud should have the ability to get resources from other Clouds

10.2.1.5 Solution should be able to provide workload migration and interoperability between private and public clouds even cloud-bursting into available public cloud options (Azure, AWS, Softlayer, VMware public cloud and other major public cloud players as identified in Gartner Magic Quadrant)

Please clarify what is Bank's strategies for Cloud adoption ? Is bank looking for Hybrid cloud on day 1 or to support in future roadmap. Our experience is that for these specifications cost of cloud mgmt. software will increase significantly. Please conform whether Bank wants Bidder to propose the solution factoring the necessary licenses.

Bidder needs to consider the cloud solution for implementation from 2nd year ; Bidder should factor and keep provision for licenses in accordance. 43 Addendum dated 30.06.2015 Page4, 8,11Clause 10.2.1.5, 10.7.25, 10.7.61, 10.7.62, 10.7.63,

10.7.61 Solution should possess capabilities to extent resource & cloud fabric

management onto other Private Clouds 10.7.62 Solution should be able to move identified workloads to another private cloud or burst into available public cloud (leaders as identified in Gartner Magic Quadrant). 10.7.63 Solution should be able to give back its capacity that can be used by other private cloud

10.7.25 Solution should be able to manage virtual and physical assets across multiple Private Clouds - implying that a specific Cloud should have the ability to get resources from other Clouds

10.2.1.5 Solution should be able to provide workload migration and interoperability between private and public clouds even cloud-bursting into available public cloud options (Azure, AWS, Softlayer, VMware public cloud and other major public cloud players as identified in Gartner Magic Quadrant)

Please clarify what is Bank's strategies for Cloud adoption ? Is bank looking for Hybrid cloud on day 1 or to support in future roadmap. Our experience is that for these specifications cost of cloud mgmt. software will increase significantly. Please conform whether Bank wants Bidder to propose the solution factoring the necessary licenses.

Bidder needs to consider the cloud solution for implementation from 2nd year ; Bidder should factor and keep provision for licenses in accordance.

44 Addendum dated

30.06.2015 page 4, Clause10.2.1.12 Solution must support standards-basedREST and SOAP interfaces REST and SOAP are two diffierent type of interfaces supported bydifferent OEMs please write it as - Solution must support standards-based interfaces like REST, SOAP.

Solution must support standards-based interfaces like REST and / or SOAP and / or similar

45 Addendum dated

30.06.2015 Cloud Management self-service How many end users will have access to Cloud self-service portal? Whatis expected number of concurrent users accessing to the portal? Need for licesing purpose.

At Head Office, Zonal Office, Project Office, Project Management Office Users (Approx. 50 Users)

46 Commercial Sheet Com2 Cost of ATS/AMC AMC/ATS to be proposed for Cloud related solutions for how many years? Since Cloud will be introduced from second year onward, does Bidder need to factor AMC/ATS for 3 years or 4 year.

Bidder needs to provision end of the contract means 3rd year, 4th year, 5th year

(10)

Addendum to RFP for SUPPLY, INSTALLATION AND MAINTENANCE OF SERVER, STORAGE VIRTUALIZATION SOLUTION (Ref No.: HO/DIT/SERVER, STORAGE VIRTUALIZATION/2015-16/01 Dated: 13.04.2015)

Sl. NO. Section and Clause Page No RFP Text Query Response to the Query

47 Addendum Dated 30th

June, 2015 Page 4Clause:10.2.1. 11

Solution should support 3rd party cloud management solutions and have an API that allows for custom development

Our Feedback: Generally one cloud management solution managing multiple hypervisor and infrastructure allows you to have different flavors of virtualization and their management solution from a single console. Having multiple 3rd party cloud solution management will lead to additional complexity and this is a unique offering of a particular vendor. Recommendation: Point to be changed as - Solution should support multiple hypervisors and infrastructure management from a single pane of glass and allow Rest API based integration and provision for customization of solution

Solution should support multiple

hypervisors and infrastructure management from a single view and allow API based integration and provision for customization of solution

48 Addendum Date: 30th

June, 2015 Page 4,Clause:10.2.1. 12

Solution must support standards-based

REST and SOAP interfaces Our Feedback: Rest and SOAP are similar interfaces. Ourrecommendation: Point to be changed as - Solution must support standards based either REST or SOAP interfaces –

Solution must support standards-based interfaces like REST and / or SOAP and / or similar

49 Addendum Date: 30th

June, 2015 Page 5,Clause: 10.3.7 Solution should be able to dynamicallyallocate and balance computing capacity across collections of hardware resources of one physical box

aggregated into one unified resource pool

Our Feedback: Point is not very clear and resource pool is specific terminology by Vendor VMware. Though we believe the objective is to let VMs dynamically leverage the resources in a private cloud for optimum utilization. Recommendation: The solution shall allow VMs dynamically leverage the resources in a private cloud for optimum utilization and effective load balancing across cloud.

The solution shall allow VMs dynamically leverage the resources in a private cloud for optimum utilization and effective load balancing across cloud / clouds. 49 Addendum Date: 30th

June, 2015 Page 5,Clause: 10.3.7 Solution should be able to dynamicallyallocate and balance computing capacity across collections of hardware resources of one physical box

aggregated into one unified resource pool

Our Feedback: Point is not very clear and resource pool is specific terminology by Vendor VMware. Though we believe the objective is to let VMs dynamically leverage the resources in a private cloud for optimum utilization. Recommendation: The solution shall allow VMs dynamically leverage the resources in a private cloud for optimum utilization and effective load balancing across cloud.

The solution shall allow VMs dynamically leverage the resources in a private cloud for optimum utilization and effective load balancing across cloud / clouds. 50 Addendum Date: 30th

June, 2015 page 6,Clause:10.6.8 Solution should support VLAN isolation bysupporting multiple networks per resource pool.

Our feedback: This is a VMware terminology specific to a particular vendor. The point should be changed as, “the solution should support VLAN isolation”

Point may be considered as The solution should support VLAN isolation

51 Addendum Date: 30th

June, 2015 Page 6,Clause:10.6.9 Solution should support encryptedcommunication (AES 256 bit or stronger) between cloud framework and all target systems.

Our feedback: This needs more clarity. Why an encryption is required in

a private cloud. If this is for public cloud and hybrid cloud, its ok. Bidder needs to factor the encryption asoptional item and it should be made available and enabled during integration with public cloud or hybrid cloud. 52 Addendum Date: 30th

June, 2015 page:7 & 8Clause: 10.7.5 & 10.7.24

Solution should be able to offer choice of various Service offering on multiple hypervisors (such as Hyper-V, ESXi, KVM, Xen) with an option to select multi operating systems such as Windows 2008, Windows 2012, RHEL / SUSE Linux, etc.

Solution should have the ability to manage Virtual Assets across the major multiple virtualization platforms (Microsoft Hyper-V, VMware, Xen,KVM,etc).

We do not support KVM This is an optional requirement of the Bank; it should be made available and enabled during integration with public cloud or hybrid cloud. Bidder may factor any adequate additional / third party component / license if found necessary for the solution.

53 Addendum Date: 30th

June, 2015 Page :10Clause: 10.7.47

Solution should support following modeling scenarios: Physical to Virtual, Virtual to Virtual or Virtual to Physical or Test to production or any of the combinations

Complied with 3rd party tools (Doubletake) Bidder may factor any adequate additional / third party component / license if found necessary for the solution.

References

Related documents

The process of well-path planning and drillstring design for given geological targets are subject to Bottom Hole Assembly BHA directional performance, torque and drag

He argued that language is neither an adequate expression of thought, nor an accurate representation of “reality.” The lecture was itself a polemical response to a brief

CHAPTER   1 5: S URGERY : G ENERAL Q U I C K   T A B L E S  © O  NLINE M ED E D 124 Breast Cancer  P ICK THE TREATMENT Local Disease: Surgical Therapy Lumpectomy + Radiation

including radiation dose, to enable them to make informed decisions about their examinations and treatment, encouraging their full participation in treatment

Critical Timeframe Now Hardware Virtualization Network Virtualization Server Virtualization Storage Virtualization Applications Infrastructure Dimensions of Virtualization

Networked Storage and Storage Virtualization Server Virtualization VM 1 VM 2 Desktop Virtualization Desktop VM Virtual App Virtual App Networking Storage Servers

Based on cloud computing and virtualization technology, we establish a cloud computing server storage architecture, design deployment of server virtualization service, and

EMC Rainfinity Global File Virtualization (GFV) optimizes heterogeneous NAS and file server environments making them simpler to manage while dynamically moving information