ADCP 95-007 Issue 2, September 1999 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 12905-A
SBC Companies
Fiber Distribution Frame
Interbay Management Panel
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 2
I. Introduction Page 3
II. Recommended Jumper lengths Page 5 III. Cross-Connecting Procedures for Lower Route Page 6 IV. Multibay Cross-Connecting Procedures
A. Routing jumpers between adjacent bays in a multibay lineup
1. Connecting ports on the outside
edges of adjacent bays Page 9 2. Connecting ports on the same
sides of adjacent bays Page 10 3. Connecting ports on the inside
edges of adjacent bays Page 11 V. Cross-Connecting Procedures for Upper Route Page 12 VI. Multibay Cross-Connecting Procedures for
Upper Route Page 15
ADCP 95-007
Issue 2, September 1999
I. Introduction
This routing guide is intended for SBC Companies for the best cable management within bay lineups using ADC FDF with an upper and lower trough. Minimum jumper length in all cases is 2m (approximately 6 ft.) to prevent intermodule noise. Do not use this procedure if upper trough is not present or for non-ADC FDF bay configurations.
ADC Assistance
Technical
Assistance
800 366-3891 Ext. 3475
Center
Customer
Service
800 366-3891 Ext. 3000
Returns
800 366-3891 Ext. 3748
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 4 12906-B 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R
BAY 1 BAY 2 BAY 3 BAY 4
FOT OSP FOT OSP
TOP TROUGH UPPER ZONE BLANK LOWER ZONE LOWER TROUGH 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R
Bay Zoning Map
1. Locate Origination and Destination points on Zone Map. 2. If EITHER Origination OR Destination is in a lower zone (1L,
1R, 2L, 2R, 3L, 3R, 4L, 4R, 5L, 5R) use procedure on page 6, Cross-Connecting Procedures for Lower Route.
3. If BOTH Origination AND Destination is in an upper zone (6L, 6R, 7L, 7R, 8L, 8R, 9L, 9R) use procedure on page 12,
ADCP 95-007
Issue 2, September 1999
II. Recommended Jumper Lengths
Lower Trough Upper Trough NUMBER OF UPPER TROUGHS REQUIRED PATCHCORD LENGTH (M) 1 2 3 4 5 6 7 8 9 10 11 12 3 4 4 5 6 7 8 8 9 10 11 12 12656-B NUMBER OF LOWER TROUGHS REQUIRED PATCHCORD LENGTH (M) 1 2 3 4 5 6 7 8 9 10 11 12 4 5 5 6 7 8 9 9 10 11 12 13 13049-A
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 6
III. Cross-Connect Procedures for Lower Route
31 32 33 39 19 20 21 25 26 27 PULL DOWN TO OPEN 1 13093-A 5 6 11 12 17 18 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 2 13094-A 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 12018-A 3
TERMINATE one end of the patchcord at the appropri-ate port.
1
ROUTE the patchcord through the vertical cable guides to the lower trough. 2
PLACE the patchcord in the lower trough.
ADCP 95-007
Issue 2, September 1999
III. Cross-Connect Procedures for Lower Route
(continued)
94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 88 89 90 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 22 23 24 28 29 30 4 12019-A 31 32 33 39 19 20 21 25 26 27 PULL DOWN TO OPEN 5 13095-A 5 6 11 12 17 18 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 6 13096-AROUTE the unterminated end of the patchcord to the second connection port. NOTE: Be sure to leave the extra patchcord slack in the lower trough.
4
TERMINATE the second end of the patchcord to the appropriate port.
5
ROUTE the second end of the patchcord through the vertical cable guides to the lower trough.
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 8 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 13097-A 7 INCORRECT ROUTING CORRECT ROUTING
DO NOT WRAP PATCH CORD MULTIPLE TIMES
AROUND SAME SPOOL
DO NOT WEAVE PATCH CORD AROUND
SPOOLS
III. Cross-Connect Procedures for Lower Route
(continued)
LOOP the patchcord slack, located in the lower
trough, over the appropri-ate interbay management spool.
NOTE: See appropriate application drawing lo-cated within this user manual for recommended specific cable routings. 7
ADCP 95-007
Issue 2, September 1999
IV. Multibay Cross-Connecting Procedures
for Lower Route
12907-A Connecting ports on the outside edges
of adjacent bays
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 10
IV. Multibay Cross-Connecting Procedures
for Lower Route (continued)
12908-B Connecting ports on the same sides
of adjacent bays
ADCP 95-007
Issue 2, September 1999
IV. Multibay Cross-Connecting Procedures
for Lower Route (continued)
12909-B Connecting ports on the inside edges
of adjacent bays
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 12
V. Cross-Connecting Procedures for Upper Route
21 PULL DOWN TO OPEN 1 13098-A PULL DOWN TO OPEN 13099-A 2 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 PULL DOWN TO OPEN PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 13100-A 3
TERMINATE one end of the patchcord at the appropri-ate port.
1
ROUTE the patchcord through the vertical cable guides to the upper
trough. 2
PLACE the patchcord in the upper trough.
ADCP 95-007
Issue 2, September 1999
ROUTE the unterminated end of the patchcord to the second connection port. NOTE: Be sure to leave the extra patchcord slack in the upper trough.
4
TERMINATE the second end of the patchcord to the appropriate port.
5
ROUTE the second end of the patchcord through the vertical cable guides to the upper trough.
6
V. Cross-Connecting Procedures for Upper Route
(continued)
PULL DOWN TO OPEN 13101-A 4 21 PULL DOWN TO OPEN 5 13102-A PULL DOWN TO OPEN 13103-A 6ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 14 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN PULL DOWN TO OPEN 13108-A 7 INCORRECT ROUTING CORRECT ROUTING
DO NOT WRAP PATCH CORD MULTIPLE TIMES AROUND SAME SPOOL
DO NOT WEAVE PATCH CORD AROUND
SPOOLS
V. Cross-Connecting Procedures for Upper Route
(continued)
LOOP the patchcord slack, located in the upper
trough, under the appropri-ate interbay management spool.
NOTE: See appropriate application drawing lo-cated within this user manual for recommended specific cable routings. 7
ADCP 95-007
Issue 2, September 1999
VI. Multibay Cross-Connecting Procedures
for Upper Route
12910-A Connecting ports on the outside edges
of adjacent bays
ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 16
VII. Fiber Optic Terminal (FOT) Jumper Routing
13365-A FOT TO FOT EQUIPMENT OSP Rear View PATCHCORD BUNDLE (ALL TO THE SAME MODULE) ROUTE BEHIND SPOOLS PATCHCORD CHANNEL NOTE:
Work from the top down. Arrange bundles inside to outside in channel.
LEAVE SERVICE LOOP BELOW SPOOL BUNDLE TO OTHER MODULE ROUTE THROUGH FANNING TREE LOOP CORRESPONDING TO