ADCP 95-007 Issue 2, September 1999 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 12905-A

SBC Companies

Fiber Distribution Frame

Interbay Management Panel

(2)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 2

I. Introduction Page 3

II. Recommended Jumper lengths Page 5 III. Cross-Connecting Procedures for Lower Route Page 6 IV. Multibay Cross-Connecting Procedures

A. Routing jumpers between adjacent bays in a multibay lineup

1. Connecting ports on the outside

edges of adjacent bays Page 9 2. Connecting ports on the same

sides of adjacent bays Page 10 3. Connecting ports on the inside

edges of adjacent bays Page 11 V. Cross-Connecting Procedures for Upper Route Page 12 VI. Multibay Cross-Connecting Procedures for

Upper Route Page 15

(3)

ADCP 95-007

Issue 2, September 1999

I. Introduction

This routing guide is intended for SBC Companies for the best cable management within bay lineups using ADC FDF with an upper and lower trough. Minimum jumper length in all cases is 2m (approximately 6 ft.) to prevent intermodule noise. Do not use this procedure if upper trough is not present or for non-ADC FDF bay configurations.

ADC Assistance

Technical

Assistance

800 366-3891 Ext. 3475

Center

Customer

Service

800 366-3891 Ext. 3000

Returns

800 366-3891 Ext. 3748

(4)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 4 12906-B 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R

BAY 1 BAY 2 BAY 3 BAY 4

FOT OSP FOT OSP

TOP TROUGH UPPER ZONE BLANK LOWER ZONE LOWER TROUGH 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R 8L 8R 9L 9R 7L 7R 6L 6R 5L 5R 4L 4R 3L 3R 2L 2R 1L 1R

Bay Zoning Map

1. Locate Origination and Destination points on Zone Map. 2. If EITHER Origination OR Destination is in a lower zone (1L,

1R, 2L, 2R, 3L, 3R, 4L, 4R, 5L, 5R) use procedure on page 6, Cross-Connecting Procedures for Lower Route.

3. If BOTH Origination AND Destination is in an upper zone (6L, 6R, 7L, 7R, 8L, 8R, 9L, 9R) use procedure on page 12,

(5)

ADCP 95-007

Issue 2, September 1999

II. Recommended Jumper Lengths

Lower Trough Upper Trough NUMBER OF UPPER TROUGHS REQUIRED PATCHCORD LENGTH (M) 1 2 3 4 5 6 7 8 9 10 11 12 3 4 4 5 6 7 8 8 9 10 11 12 12656-B NUMBER OF LOWER TROUGHS REQUIRED PATCHCORD LENGTH (M) 1 2 3 4 5 6 7 8 9 10 11 12 4 5 5 6 7 8 9 9 10 11 12 13 13049-A

(6)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 6

III. Cross-Connect Procedures for Lower Route

31 32 33 39 19 20 21 25 26 27 PULL DOWN TO OPEN 1 13093-A 5 6 11 12 17 18 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 2 13094-A 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 12018-A 3

TERMINATE one end of the patchcord at the appropri-ate port.

1

ROUTE the patchcord through the vertical cable guides to the lower trough. 2

PLACE the patchcord in the lower trough.

(7)

ADCP 95-007

Issue 2, September 1999

III. Cross-Connect Procedures for Lower Route

(continued)

94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 88 89 90 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 22 23 24 28 29 30 4 12019-A 31 32 33 39 19 20 21 25 26 27 PULL DOWN TO OPEN 5 13095-A 5 6 11 12 17 18 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 52 53 54 28 29 30 PULL DOWN TO OPEN 6 13096-A

ROUTE the unterminated end of the patchcord to the second connection port. NOTE: Be sure to leave the extra patchcord slack in the lower trough.

4

TERMINATE the second end of the patchcord to the appropriate port.

5

ROUTE the second end of the patchcord through the vertical cable guides to the lower trough.

(8)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 8 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 46 47 48 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 13097-A 7 INCORRECT ROUTING CORRECT ROUTING

DO NOT WRAP PATCH CORD MULTIPLE TIMES

AROUND SAME SPOOL

DO NOT WEAVE PATCH CORD AROUND

SPOOLS

III. Cross-Connect Procedures for Lower Route

(continued)

LOOP the patchcord slack, located in the lower

trough, over the appropri-ate interbay management spool.

NOTE: See appropriate application drawing lo-cated within this user manual for recommended specific cable routings. 7

(9)

ADCP 95-007

Issue 2, September 1999

IV. Multibay Cross-Connecting Procedures

for Lower Route

12907-A Connecting ports on the outside edges

of adjacent bays

(10)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 10

IV. Multibay Cross-Connecting Procedures

for Lower Route (continued)

12908-B Connecting ports on the same sides

of adjacent bays

(11)

ADCP 95-007

Issue 2, September 1999

IV. Multibay Cross-Connecting Procedures

for Lower Route (continued)

12909-B Connecting ports on the inside edges

of adjacent bays

(12)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 12

V. Cross-Connecting Procedures for Upper Route

21 PULL DOWN TO OPEN 1 13098-A PULL DOWN TO OPEN 13099-A 2 4 5 6 94 95 96 64 65 66 10 11 12 70 71 72 16 17 18 34 35 36 40 41 42 46 47 48 76 77 78 22 23 24 82 83 84 52 53 54 28 29 30 58 59 50 88 89 90 PULL DOWN TO OPEN PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 13100-A 3

TERMINATE one end of the patchcord at the appropri-ate port.

1

ROUTE the patchcord through the vertical cable guides to the upper

trough. 2

PLACE the patchcord in the upper trough.

(13)

ADCP 95-007

Issue 2, September 1999

ROUTE the unterminated end of the patchcord to the second connection port. NOTE: Be sure to leave the extra patchcord slack in the upper trough.

4

TERMINATE the second end of the patchcord to the appropriate port.

5

ROUTE the second end of the patchcord through the vertical cable guides to the upper trough.

6

V. Cross-Connecting Procedures for Upper Route

(continued)

PULL DOWN TO OPEN 13101-A 4 21 PULL DOWN TO OPEN 5 13102-A PULL DOWN TO OPEN 13103-A 6

(14)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 14 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN 94 95 96 64 65 66 70 71 72 76 77 78 82 83 84 52 53 54 58 59 50 88 89 90 PULL DOWN TO OPEN PULL DOWN TO OPEN 4 5 6 10 11 12 16 17 18 34 35 36 40 41 42 46 47 48 22 23 24 28 29 30 PULL DOWN TO OPEN PULL DOWN TO OPEN 13108-A 7 INCORRECT ROUTING CORRECT ROUTING

DO NOT WRAP PATCH CORD MULTIPLE TIMES AROUND SAME SPOOL

DO NOT WEAVE PATCH CORD AROUND

SPOOLS

V. Cross-Connecting Procedures for Upper Route

(continued)

LOOP the patchcord slack, located in the upper

trough, under the appropri-ate interbay management spool.

NOTE: See appropriate application drawing lo-cated within this user manual for recommended specific cable routings. 7

(15)

ADCP 95-007

Issue 2, September 1999

VI. Multibay Cross-Connecting Procedures

for Upper Route

12910-A Connecting ports on the outside edges

of adjacent bays

(16)

ADCP 95-007 Issue 2, September 1999 PN 1067274 Rev A Page 16

VII. Fiber Optic Terminal (FOT) Jumper Routing

13365-A FOT TO FOT EQUIPMENT OSP Rear View PATCHCORD BUNDLE (ALL TO THE SAME MODULE) ROUTE BEHIND SPOOLS PATCHCORD CHANNEL NOTE:

Work from the top down. Arrange bundles inside to outside in channel.

LEAVE SERVICE LOOP BELOW SPOOL BUNDLE TO OTHER MODULE ROUTE THROUGH FANNING TREE LOOP CORRESPONDING TO

References

Related documents

Online community: A group of people using social media tools and sites on the Internet OpenID: Is a single sign-on system that allows Internet users to log on to many different.

Automotive component and precision machining sales increased by HUF 130 million, or 3.6%, comparing to the same period of 2003, while agricultural and general machinery sales

The optimization goal is to compute routes (starting at the depot, visiting the locations and finishing at the depot) for all the vehicles in the given time horizon, which minimize

The principle hypotheses for this work include (1) if an automation system has been virtually prototyped and commissioned using the component-based approach in a virtual

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

Svoronos, Les privilèges de l'Église (see η.. John remained in office for years after Manuel's accession, eventually adapting to the new mood of corrupt

• Based on intention to treat, VRET achieves more rapid responses, and higher response rates, than imaginal exposure for PTSD. • Combination VRET with pharmacotherapy has

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,