ChiCago Plan Commission

former Children’s memorial hosPital

(Pd 158 - amended)

(2)

existing hosPital CamPus

FULLERTON

LINCOLN

(3)

site uses & tyPes of housing

270

aPartments

(+Wf)

270

aPartments

(+Wf)

98,000sf

retail

ParKing

60 Condominiums

senior

housing

156 rooms

64,000 sf

retail

(4)
(5)

existing hosPital CamPus

FULLERTON

LINCOLN

(6)

existing hosPital CamPus

imPaCt of Children’s memorial hosPital When it Was oPerational

• 1.5 million people a year visited the site

• Approximately 4,100 people a day visited the site

• Almost 23,300 vendors a year

(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)

oPen sPaCe - existing hosPital buildings

(26)

ProPosed oPen sPaCe

Children’s

garden

memorial

garden

Central

Plaza

57,000 sf of oPen sPaCe

(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)

site uses & tyPes of housing

270

aPartments

(+Wf)

270

aPartments

(+Wf)

98,000sf

retail

ParKing

60 Condominiums

senior

housing

156 rooms

64,000 sf

retail

(36)
(37)
(38)
(39)
(40)
(41)
(42)

building height - existing and ProPosed

exIstIng buIldIngs

proposed buIldIngs

190’8”

2014 - 190’8”

172’0”

(43)

traffiC - existing hosPital

traffiC imPaCt of Children’s memorial

hosPital When it Was oPerational

• 1.5 million people / year visited the site

• Approximately 5,000 ambulances / year

• Almost 23,300 vendors

• 12,500 truck deliveries

• 30% of all traffic on lincoln Avenue

generated by hospital

• parking structure averaged 1,332 cars / day

(44)

traffiC - existing hosPital

long-standing traffiC issues

• Congested traffic flow through 6-way intersections

• Many deliveries and curb cuts along lincoln

• impeded traffic flow along Fullerton

• left turns into Hospital along Fullerton

• poor pedestrian crosswalks

• Conflict between automobiles & bicycles

(45)

traffiC imProvements

imProvements to long-standing traffiC issues

• Halsted / Belden

• Orchard / Lincoln / Belden

• Lincoln Avenue

• Fullerton / Orchard

• Fullerton Avenue

• Fullerton / Lincoln / Halsted

• 64% reduction in AM traffic from CMH

• 35% reduction in PM traffic from CMH

(46)

iMPrOveMents:

• Add traffic signal

(along with DePaul

school of Music)

HAlsted / belden interseCtion

(47)

iMPrOveMents:

• Add sidewalk bump-outs

in appropriate locations

at signal

• Add continental

crosswalk markings

• Provide continuous bike

lanes in either direction

linColn / orCHArd / belden interseCtion

(48)

iMPrOveMents:

• reduce the number of curb

cuts from seven to three

• Add sidewalk bump-outs

at signal

• Add continental crosswalk

markings

• Provide continuous bike

lanes in either direction

linColn avenue

(49)

iMPrOveMents:

• Add traffic signal

• Add continental crosswalk

markings

• synchronize traffic signals

to provide “gaps”, making

traffic more efficient

• Add bump-outs at all

corners

Fullerton / orCHArd interseCtion

(50)

iMPrOveMents:

• Add Westbound Fullerton

right turn lane

• extend right & left turn

lanes on Lincoln

• extend right & left turn

lanes on Halsted

• Add sidewalk bump-outs

in appropriate locations

at signal

• expand sidewalks around

existing Annex Building

• Provide continuous bike

lanes in either direction

Fullerton / linColn / HAlsted interseCtion

(51)

• Provide below-grade loading

for central block and

senior housing

• eliminate Westbound left

turns into the hospital

• synchronize traffic signals

to provide “gaps” for service

vehicles to exit

• synchronize traffic signals

to provide “gaps” for Burling

vehicles

fullerton loading aCCess

(52)

no deliveries during

rush hour

loading hours:

• Deliveries Prohibited:

• 7:00 am to 9:00 am

• 4:00 pm to 6:00 pm

• Open 6:00 am to 9:00 pm

full-time doCKmaster

• 8 Loading Docks

• 9 Loading Positions

loading for senior

housing

fullerton loading aCCess

(53)

fullerton loading aCCess

(54)

develoPment ProPosal

SITE AREA

F.A.R.

F.A.R. AREA

TOTAL RETAIL

APARTMENTS

544 UNITS

CONDOMINIUMS

30-60 UNITS

SENIOR HOUSING

156 ROOMS

SUSTAINABILITY

PARKING

OPEN SPACE

262,963 SF

190'-8"

19 STORIES

162,596 SF

760 TOTAL

3.50

LEED SILVER + 50% GREEN ROOF

DEVELOPMENT PROPOSAL

57,153 SF - 21.73% OF SITE

919,480 SF

1,044 SPACES

HEIGHT

TOTAL RESIDENTIAL

(55)

eConomiC benefits

restore eConomiC vitality

• $122 Million in new City tAxes on A site

that Previously did not Pay taxes

• totAl eConoMiC iMpACt $3.5 billion

• 2,500 ConstruCtion And relAted jobs

• 250 perMAnent jobs will be CreAted

(56)
(57)
(58)
(59)

2012 - 294 ft

27 stories

2012 - 250 ft

24 stories

2012 - 155 ft

14 stories

(60)

2014 - 190 ft

19 stories

2014 - 78 ft

5 stories

(61)
(62)

2012 - 294 ft

27 stories

(63)

2014 - 190 ft

19 stories

(64)
(65)

2012 - 250 ft

24 stories

(66)

2014 - 190 ft

19 stories

(67)
(68)

vieW looKing north along linColn avenue

2012 - 155 ft

14 stories

january 2014

(69)

vieW looKing north along linColn avenue

february 2014

78 ft, 5 stories

References

Related documents

Impact: Hazardous Waste Spillage’s must be cleaned up in accordance with the emergency procedure for spillage to reduce any pollution of land or water

The aim of this study was to evaluate the predictive factors and attitudes of curricular and specialized teachers towards socially assistive robotics and the

Using a range of media which non-youth workers have at times mistaken as mere ‘treats’ – sport, the arts, outdoor activities, residential experience and so on – youth work seeks

DRD1, 1812 dopamine receptor, adenylate cyclase activating pathway DRD2, 1813 dopamine receptor, adenylate cyclase inhibiting pathway GRM7, 2917 G-protein coupled receptor

The 2D or 3D structure of non-textual spaces (buildings or abstract places) often allows spatial structuring of information, for example by placing various links and signs in

17" alloy wheels with all-season tires KESSY keyless access with push-button start App Connect smartphone integration Heatable front seats and washer nozzles Panoramic

We provide evidence on the PPP hypothesis using a sample of …fty Spanish cities for a long time period through the application of panel data unit root tests.. Although results

The Project involves the construction of sidewalk curb ramps at intersections along Gemini Way between Dale Boulevard and Minnieville Road, and the construction of a