Republic of the Philippines

Department of Public Works and Highways

Department of Public Works and Highways

OPIF ASSESSMENT WORKSHOP:

OPIF ASSESSMENT WORKSHOP:

LESSONS GAINS AND OPPORTUNITIES

LESSONS GAINS AND OPPORTUNITIES

LESSONS GAINS AND OPPORTUNITIES

LESSONS GAINS AND OPPORTUNITIES

MARIA CATALINA E. CABRAL, PhD

MARIA CATALINA E. CABRAL, PhD

Assistant Secretary for Planning

Assistant Secretary for Planning

10 June 2010

10 June 2010

(2)

OUTLINE OF PRESENTATION

OUTLINE OF PRESENTATION

™

™

Relationship

Relationship of

of OPIF

OPIF in

in the

the DPWH

DPWH

Strategic

Strategic Planning

Planning

™

™

Facilitating

Facilitating Factors

Factors

™

™

Facilitating

Facilitating Factors

Factors

™

™

Hindering

Hindering Factors

g

g

Factors

™

™

Support

Support Needed

Needed from

from DBM

DBM

™

™

Support

Support Needed

Needed from

from other

other Oversight

Oversight

Agencies

Agencies

Agencies

Agencies

(3)

Sustained Economic Growth through Poverty Reduction

SOCIETAL GOALS

Access to Markets and Production

Areas and Physical Integration of the Nation

Safe Environment

through Infrastructure Facilities

SECTORAL GOALS

Safe, fast, economical and

reliable inter-regional and

inter-urban mobility of people,

goods and services

Protection of Lives and

Properties

against Major Floods

Enhances Living Conditions of

Population through Other

Infrastructure

ORGANIZATIONAL

GOALS

National roads

maintenance

services

National roads

construction services

Major flood control

maintenance and

construction services

Other basic

construction and

maintenance services

MAJOR FINAL

OUTPUTS

EXTERNAL RELATIONS

PROGRAM DELIVERY

INTERNAL SUPPORT

KEY RESULTS

Public Effective Planning & Design Maintenance Org/HRM/Integrity Information Financial Procurement Internal ResourcePhysical Research & Standards

AREAS

Construction

Relations Partnership Funding Design Construction Maintenance IntegrityDev’t. Mgmt Mgmt Mgmt Control ResourceMgmt DevelopmentStandards

(4)

DPWH GOVERNANCE SCORECARD

DPWH GOVERNANCE SCORECARD

DPWH GOVERNANCE SCORECARD

DPWH GOVERNANCE SCORECARD

(5)

Perspectives in Measuring DPWH Performance

Perspectives in Measuring DPWH Performance

Perspectives in Measuring DPWH Performance

Perspectives in Measuring DPWH Performance

™

™

Social

Social Impact

Impact

™

™

P

P

™

™

Processes

Processes

™

™

Resource

Resource Stewardship

Stewardship

™

™

Resource

Resource Stewardship

Stewardship

™

™

People

People

™

(6)

Obj ti

Social Impact

Social Impact

Objectives:

• Safe environment through quality infrastructure facilities

• Increased mobility and total connectivity of people

• Increased mobility and total connectivity of people

through quality infrastructure resulting to improved

quality of life

Measures

Targets

Initiatives

2010

2020

2030

Implement needs-driven network

d

l

d

1.

Transport Cost (in PhP)

1.69

1.60

1.50 development and asset

preservation programs

2.

National road network

75%

85%

100%

Implement National Roads

Improvement Program

Improvement Program

3.

International Roughness

Index

5.5

4.5

4.0

Implement needs-driven network

development and asset

preservation programs

4.

Flood-protected area

20%

42%

82%

Implement comprehensive flood

control program in major river

basins

(7)

Processes

Processes

Objectives:

• Comply and be recognized for conforming with

i t

ti

ll

t d t d d

internationally-accepted standards

• Institutionalize and cascade best practices in DPWH’s

processes

p

Measures

Targets

Initiatives

2010

2020

2030

5. Absorptive Capacity

80%

90%

100%

Implement continuing institutional

capacity development program

Implement ISO certification program for

6. ISO

Certification

0

5

5

Implement ISO certification program for

DPWH core offices

All

All l

All large Implement ISO certification program for

All

large B

All large

B & A

All large

&

medium

DPWH contractors

(8)

Resource Stewardship

Resource Stewardship

Resource Stewardship

Resource Stewardship

Objectives:

• Continuously commit to an effective and efficient

tili ti

f

utilization of resources

• Implement reforms in financial and physical resource

management at all levels in DPWH

g

Measures

Targets

Initiatives

2010

2020

2030

7.

Adherence to

programming criteria

50%

75%

90%

Advocacy for adherence to

programming criteria among

various stakeholders

8. Time and cost control

55%

65%

90%

Strengthen supervision and

monitoring & evaluation of

project implementation

(9)

Resource Stewardship

Resource Stewardship

People

People

Objectives:

• Institutionalize a corporate environment that nurtures

i t

it

d

ll

integrity and excellence

• Continuously upgrade an empowered, highly

professional, skilled and well-compensated workforce

p

,

p

Measures

Targets

Initiatives

2010

2020

2030

Enhance employee feedback

10. Personnel satisfaction

60%

80%

95%

Enhance employee feedback

mechanism and implement

productivity-based reward

system

11.

Performance composite

index

70%

85%

100%

Implement comprehensive HRM

program

I

l

t

l

12. Personnel accreditation

55%

80%

100%

Implement personnel

accreditation program

(10)

Resource Stewardship

Resource Stewardship

External

External

Objectives:

• Create a dynamic, highly functional and sustainable

i t

bli

t

hi

private-public partnership

• Build an image highlighting DPWH’s core values of

public service, integrity, excellence, professionalism

p

,

g y,

, p

and teamwork

Measures

Targets

Initiatives

2010

2020

2030

8.

Stakeholders' approval

rating

C+

B

A

Support multi-stakeholder

partnership program

(11)

FACILITATING FACTORS

FACILITATING FACTORS

™

Clearly defined indicators for measuring

performance and desired outputs

™

Good monitoring and reporting system

g

p

g y

™

Timely release of funds by DBM to deliver

desired outputs as scheduled

desired outputs as scheduled

™

Complete system tools for prioritization of

roads flood control and other infrastructure

roads, flood control and other infrastructure

projects

(12)

FACILITATING FACTORS

FACILITATING FACTORS

™

Continuous cascading/information

dissemination on the OPIF process through

trainings and workshops

™

Provisions and mechanics to avoid changing

scope of work of projects and moving targets

™

Continuous provisions of PDE funds

(13)

HINDERING FACTORS

HINDERING FACTORS

™

Forward estimates not yet robust due to moving

target and changing scope of works

g

g g

p

™

Frequent realignment of funds

™

Non-release of MVUC funds for maintenance of

roads (i.e. NRIMP II)

™

Poor linkage between planning and budgeting

(DPWH, NEDA and DBM)

™

No database for asset preservation for flood

control structures and facilities in major river

basins and principal rivers

(14)

™

Continuous conversion of Local Roads to

HINDERING FACTORS

HINDERING FACTORS

™

Continuous conversion of Local Roads to

National Roads

L t

d

ti l

l

f f

d

™

Late and partial release of funds

™

Implementation of projects outside DPWH

mandate (local projects)

™

OPIF concept is not easily absorbed by the

p

y

y

implementing offices

™

Monitoring and reporting system not yet fully

™

Monitoring and reporting system not yet fully

aligned with OPIF

™

No central database yet that links planning

™

No central database yet that links planning,

(15)

SUPPORT NEEDED FROM DBM

SUPPORT NEEDED FROM DBM

™

Timely and full release of project funds to

attain desired targets and meet contractual

obligations

obligations

™

Automatic release of funds for line item

j t

projects

™

Promote advocacy of OPIF to external

stakeholders involved in the budgeting

process

™

Delinking VIILP projects from DPWH Infra

(16)

SUPPORT NEEDED FROM OTHER

SUPPORT NEEDED FROM OTHER

OVERSIGHT AGENCIES

OVERSIGHT AGENCIES

E l

l

ti

f

j

i f

j t

OVERSIGHT AGENCIES

OVERSIGHT AGENCIES

™

Early evaluation of major infra projects

™

Strengthen oversight functions to ensure

implementation of reforms agenda by

other agencies

™

Strong linkage between planning and

(17)

g{ ~ l

g{ ~ l

g{tÇ~ lÉâ

g{tÇ~ lÉâ

(18)

DPWH GOVERNANCE SCORECARD

DPWH GOVERNANCE SCORECARD

B aseline

Perspectives

Objectives

Measures

Targets

Initiatives

-2009 2010 2020 2030

a. Increased mobility and total connectivity of people through quality infrastructure resulting to improved quality of life.

1. Transport cost (in PhP per pass enger‐km.)

1.69 1.69 1.6 1.5 Implement needs ‐driven network development and asset preservation programs

b. Safe environment through quality infrastructure facilities .

2. National road network 73% 75% 85% 100% Implement national roads improvement program

1. Social Impact

3. International Roughness Index

5.5 5.5 4.5 4 Implement needs ‐driven asset preservation program

4. Flood‐protected area 19% 20% 42% 82% Implement comprehensive flood control program in major river basins

a. Institutionalize and cascade best practices in DPWH’s proces ses down to the dis trict level.

5. Absorptive Capacity 55% 80% 90% 100% Implement continuing ins titutional capacity development program

2. Processes

b. Comply and be recognized for conforming with internationally accepted standards.

6. ISO Certification 0 0 5 5 6.1 Implement ISO certification program for DPWH core offices 0 All Large B All Large B & A All Large & Medium

6.2 Implement ISO certification program for DPWH contractors

3. Resource

S d hi

a. Continuously commit to an effective and ffi i ili i f

7. Adherence to

i i i

50% 50% 75% 90% Advocacy for adherence to programming

i i i l k h ld

Stewardshi p effici ent utilization of res ources. programmi ng criteri a criteri a among vari ous external stakeholders b. Implement reforms in financial and

phys ical resource management at all levels In DPWH.

8. Time and cos t control ND 55% 65% 90% Strengthen s upervision and monitoring & evaluation of project implementation 9. Systems improvement 1 2 4 6 Enhance resource planning and management

s ystems

a Institutionalize a corporate environment 10 Personnel satisfaction 60% 60% 80% 95% Enhance employee feedback mechanism and 4 People a. Institutionalize a corporate environment

that nurtures integrity and excellence.

10. Personnel satisfaction index

60% 60% 80% 95% Enhance employee feedback mechanism and implement productivity‐based reward s ystem b. Continuously upgrade an empowered,

highly professional, skilled and well‐ compensated workforce.

11. Performance composite index

70% 70% 85% 100% Implement comprehensive HRM program

12. Personnel accreditation 55% 55% 80% 100% Implement personnel accreditation program 4. People

a. Create a dynamic, highly functional and sustainable private‐public partnership.

13. Stakeholders’ approval rating

b. Build an image highlighting DPWH’s core values of public service, integrity, excellence, professionalism and teamwork.

5. External C+ C+ B A Support multi ‐stakeholder partnership

(19)

Sustained Economic Growth through Poverty Reduction

SOCIETAL GOALS

Access to Markets and Production

Areas and Physical Integration of the Nation

Safe Environment

through Infrastructure Facilities

SECTORAL GOALS

Safe, fast, economical and

reliable inter-regional and

inter-urban mobility of people,

goods and services

Protection of Lives and

Properties

against Major Floods

Enhances Living Conditions of

Population through Other

Infrastructure

ORGANIZATIONAL

GOALS

National roads

maintenance

services

National roads

construction services

Major flood control

maintenance and

construction services

Other basic

construction and

maintenance services

MAJOR FINAL

OUTPUTS

EXTERNAL RELATIONS

PROGRAM DELIVERY

INTERNAL SUPPORT

KEY RESULTS

Public Effective Planning & Design Maintenance Org/HRM/Integrity Information Financial Procurement Internal ResourcePhysical Research & Standards

AREAS

Construction

Relations Partnership Funding Design Construction Maintenance IntegrityDev’t. Mgmt Mgmt Mgmt Control ResourceMgmt DevelopmentStandards

References

Related documents

Employees exposed to high involvement management (HIM) practices have higher subjective wellbeing, fewer accidents but more short absence spells than “like” employees

The University will increase the percentage of Maine high school graduates who pursue higher education; and of that percentage, those who attend in-state institutions; those

Sudionici koji su postigli viši rezultat na dimenziji adaptivnog perfekcionizma se statistički značajno razlikuju u percepciji motivacijske klime usmjerene na

An adult took a Yup’ik course online, and did a lot of coursework in the library. A librarian said he was taking accounting courses online. An adult was able to complete her GED

Public Management B.P.M., Minor Design & Social Inquiry. Public Procurement UG Design &

14. Helps in achieving goals i.e. individual, organizational & social objectives. Involves procurement, development & maintenance of human resource. HR planning: HRP refers to

I am also an Accredited Mortgage Consultant and as a credit representative of AMP Financial Planning am authorised to provide credit advice regarding how to structure debt,

Our practice and the representative(s) listed in this Guide provide services to you as authorised representative(s) and credit representative(s) of AMP Financial Planning