Standard operating procedure

Title: How to conduct a procurement procedure

Status: PUBLIC Document no.: SOP/EMA/0121

Lead author Approver Effective date: 04.09.14 Name: Caroline Maignen Name: Stefano Marino Review date: 04.09.17 Signature: On file Signature: On file Supersedes:

SOP/EMA/0121 and SOP/EMA/0122

Date: 03.09.14 Date: 04.09.14 TrackWise record no.: 4043

1. Purpose

This SOP describes the procedure for the preparation of a procurement contract and the role of the Contracts and Procurement Support Officer or her replacement therein.

2. Scope

This SOP applies to all procurement procedures of all values concluded by the European Medicines Agency except for those with a value of less than €15,000. The choice of procurement procedures available is set out in the Agency’s Financial Regulation and Implementing rules applicable to the budget of the EMA. It is the responsibility of the Authorising Officer to choose the appropriate procedure.

Each procedure will be conducted slightly differently according to the rules governing it but all will be conducted in accordance with the principles of transparency, equal treatment and non-discrimination. In order to avoid a different SOP for each procurement procedure, this SOP sets out the main common steps involved in all procedures (except for value less than €15,000) indicating the cases where particular important variations in procedure occur.

3. Responsibilities

It is the overall responsibility of each Authorising Officer to ensure that this procedure is adhered to for each procurement contract.

The responsibility for the execution of a particular part of this procedure is identified in the right-hand column.

(2)

4. Changes since last revision

This SOP consolidates and streamlines SOP/EMA/0121 and SOP/EMA/0122 and updates references.

5. Documents needed for this SOP

The following forms for this SOP are required and can be found in the location identified:

 Standard procurement contracts are available in Word, New, Contracts tab.

 Recommended templates for invitations to tender, tender documents and appointment of committees can be found on the Procurement webpage.

 Standard ACPC report is available in Word, File, New, Contracts tab.

6. Related documents

 Public Procurement Directive DIR/2004/18/EC

 Financial Regulation applicable to the budget of the European Medicines Agency applicable as of 1 January 2014 in particular Title V Procurement thereof

 Rules for the implementation of certain provisions of the Agency’s Financial Regulation applicable as of 1 January 2014

 Vade Mecum on Public Procurement Procedures in the European Commission

 Article 7 of Rules of Procedure of the Advisory Committee on Procurement and Contracts of 3 September 2012 (or as may be updated)

 Charter of tasks and responsibilities of authorising officers by delegation of 1 June 2004

 Charter of tasks and responsibilities of the verifying officer and verifying assistant(s) of 30 September 2009

 Regulation (EC) No 45/2001 on the protection of individuals with regard the processing of personal data by the European Union institutions and bodies

7. Definitions

Advisory Committee on Procurement and Contracts: The ACPC gives its opinion in an

advisory capacity on procurement contracts and supplementary agreements.

Authorising Officer: The Authorising Officer of the Agency is the Executive Director but powers

may be delegated by the Executive Director to an Authorising Officer by delegation. The Authorising Officer implements the Agency’s budget in accordance with the financial rules of the Agency, on his/her own responsibility and within the limits of the appropriations authorised. The Authorising Officer is responsible for implementing revenue and expenditure in accordance with the principles of sound financial management and for ensuring that the requirements of legality and regularity are complied with. The Authorising Officer acts in accordance with the Charter of tasks and responsibilities of authorising officers by delegation.

(3)

Buyer’s profile: Area on the Agency’s external website where information on tenders is published.

Contracts and Procurement Support Officer: The Contracts and Procurement Support Officer

provides advice and support to Authorising Officers, Initiating Agents and all other staff members as required with all procurement procedures and the subsequent conclusion of contracts. The Contracts and Procurement Support Officer provides centralised reports on procurement contracts concluded to third parties (e.g. Court of Auditors) on the basis of information maintained by Initiating Agents. The Contracts and Procurement Support Officer may be replaced during absence by the Assistant to the Contracts and Procurement Support Officer.

Contracts database: This database contains data on contracts concluded by Authorising Officers

on behalf of the Agency for purchases of goods, services, works as well as building contracts.

Cooling-off period: This applies to contracts covered by the Public Procurement Directive

2004/18/EC and is a period of 14 calendar days after dispatch of award and rejection notifications or after a pre-award notice is published in the Official Journal of the European Union, in case of negotiated procedures without prior publication of a contract notice. During these 14 calendar days no contract can be signed.

Evaluation committee: a board appointed by the Authorising Officer to evaluate tenders.

Ex post evaluation: This refers to the activities indicated in the Agency’s Financial Regulation

which are conducted to evaluate in terms of the human and financial resources allocated and the results obtained in order to verify that they were consistent with the objectives set.

Exclusion criteria: These criteria determine whether an economic operator is authorised to

participate in a procurement procedure and not in an exclusion situation such as bankruptcy.

Initiating Agent: The Initiating Agent assists the Authorising Officer with the duties mentioned.

The Initiating Agent maintains valid data on procurement contracts concluded by the Authorising Officer. The Initiating Agent files all original signed procurement contracts in the

Division/Department concerned and makes available, as required, copies to the Contracts and Procurement Support Officer.

Mandatory filing plan: This is the filing plan for procurement procedures available on the

Procurement webpage.

Negotiated tender procedure: a tender procedure whereby the contracting authorities shall

consult tenderers of their choice who satisfy the stipulated selection criteria, and negotiate the terms of the contract with one or more of them.

Open tender procedure: a tender procedure whereby all interested economic operators may

submit a tender when the contract value is over the threshold of the Public Procurement Directive.

Opening committee: a board appointed by the Authorising Officer to open tenders.

Pre-qualification questionnaire: This is a questionnaire recommended to be sent to candidates

applying to be considered for a restricted tender and relates to exclusion and selection criteria.

Procurement contract: A procurement contract is any contract for pecuniary interest concluded

in writing by the Agency in order to obtain goods, services or the execution of works.

Procurement decision: This is a document signed by the Authorising Officer of his/her decision to

start a procurement procedure. It will refer to the strategic and/or legal context of the

procurement (e.g. Work Programme, Heads of Division decision etc). It will indicate the expected deliverables of the contract and objectives to be achieved, any particular risks or milestones. In

(4)

case of re-tendering it shall indicate whether or not an ex post evaluation of the performance of the contract to date has been carried out.

Procurement procedure: a call for tender using an open, restricted or negotiated procedure with

or without publication of a contract notice in the Official Journal of the European Union as appropriate.

Restricted tender procedure: a tender procedure whereby all economic operators may ask to

take part but only short-listed candidates satisfying the stipulated selection criteria are invited simultaneously and in writing by the contracting authorities to submit a tender. Such tender is used when the contract value exceeds €60,000.

Selection criteria: The selection criteria are designed to check whether an operator is capable of

performing the contract.

Tender documentation: Includes any documentation necessary for the execution of a

procurement procedure. This will normally include an invitation to tender letter, technical specifications including costing sheet and a draft contract.

Verifying Officer and Verifying Assistant(s): At the request of the Authorising Officer, the

Verifying Officer and/or Assistant verifies the operational and financial aspects of an operation in an ex ante capacity, in order to control the risks involved. The VO checks conformity of a procurement procedure and the contract to be concluded with the Financial Regulation and the Implementation Rules. The Verifying Officer acts in accordance with the Charter of tasks and responsibilities of the verifying officer and verifying assistant(s).

Abbreviations used in this SOP:

ED = Executive Director

CPSO = Contracts and Procurement Support Officer AO = Authorising Officer

VO = Verifying Officer and Verifying Assistant(s) IA = Initiating Agent

ACPC = Advisory Committee on Procurement and Contracts FR = Financial Regulation

IR = Implementation Rules of the Financial Regulation OJEU = Official Journal of the European Union

(5)

8. Process map(s)/ flow chart(s)

Start 1.1 AO provides procurement planning and updates to CPSO 1.2 AO passes information to CPSO for ex ante

publication

1.3 AO selects appropriate procurement

procedure, plans time frame

and nominates person

to run tender

1.4 Allocation of reference number for tender

1.5 AO informs relevant Agency staff of plan to procure 2.1. AO appoints opening and evaluation committees (if applicable) 2.2 AO makes all decisions on draft tender documentation. to be sent to CPSO for review

2.3 CPSO reviews all Documentation and provides comments 2.4 Update of draft tender documents according to CPSO comments 2.5 Preparation and dispatch of text for OJEU &

publication by CPSO (f applicable) 2.6 Procurement Procedure is executed 2.7 Draft committee report prepared and sent

to CPSO for comments and review prior to signature 2.8 Committee report finalised 2.9 AO decision to proceed with a contract or abandon procedure? Abandon/cancel End 2.10 Above or below ACPC threshold? 2.11 ACPC report prepared and sent to CPSO

for review

2.12 CPSO reviews draft report and

may make comments 2.13 ACPC report finalised 2.14 ACPC gives opinion 2.15 AO makes contract award decision and nominates contract manager Above ACPC threshold Proceed Go to 2.16

(6)

2.16 CPSO reviews contract award decision 2.17 AO signs final award decision 2.18 Draft letters prepared to tenderers 2.19 CPSO reviews draft letters 2.20 Letters finalised. Bank details requested & exclusion criteria proof (if applicable) 2.21 Standstill period Implemented (if applicable). 2.22 Requests for further information responded to 3.1 IA raises commitment (if applicable) & sends final draft contract to CPSO for review 3.2 VO Charter Workflow applies for non-framework contracts 3.2 VO Charter Workflow applies for non-framework contracts 3.3 CPSO reviews draft contract and makes comments with copy to VO 3.4 Comments by VO to CPSO? 3.5 Upon receipt of comments of VO, CPSO contacts AO to advise and assist 3.6 IA actions commitment (for non-framework contract) and contract signature occurs 4.1 If award notice is needed, IA informs CPSO of date of signature & CPSO publishes award notice 4.2 IA files original contract in Department concerned 4.3 IA enters into contracts database (except under EUR 15K) 4.4 Finalisation of filing of documents 4.5 CPSO conducts procurement debriefing 4.6 CPSO prepares reports on Contracts concluded 4.7 Conduct of contract management 4.8 Update contracts database with addenda 4.9 Ex post evaluation reports conducted as required 4.10 Review of future requirements, taking into account lessons learned and ex post evaluation reports End Under €60.000 Yes No comments From 2.15

(7)

9. Procedure

Step Action Responsibility

1.0 Procurement Planning

1.1 AO provides advance information and on any planned procurement procedure prior to the beginning of the financial year and for the subsequent two financial years to CPSO and updates as required for publication to management.

AO

1.2 For contracts up to EUR 60,000 where ex ante publication is required on the Agency’s buyer’s profile, AO passes relevant information to CPSO for publication.

AO

1.3 AO decides the appropriate type of procurement procedure and plans the timeframe, consulting with CPSO if required for advice. AO nominates staff member responsible for running the procurement procedure.

AO

1.4 Allocation of reference number from the Agency’s contract numbering system and creation of procurement folder in DREAM with restricted access.

Person running the tender 1.5 AO informs relevant Agency staff of the plan to procure. AO

2.0 Execution of the procurement procedure

2.1 Mandatory appointment of opening and evaluation committees for procedures over €60,000. For procedures under €60,000 appointment of committees as decided by AO.

AO

2.2 AO makes all decisions on draft tender documentation necessary including draft contract, making use of Agency’s standard procurement contracts and other relevant standard documents and templates. The person running the tender sends all documentation for CPSO for review.

AO/Person running the tender

2.3 CPSO reviews all documentation and provides comments to the

person running the tender in writing. CPSO 2.4 The person running the tender updates finalises draft tender

documentation in light of CPSO’s comments, consulting with the AO as needed, and where the tender is to be advertised in the OJEU the person running the tender provides the documents in the correct format for publication on the Agency’s external webpage.

Person running the tender

2.5 Preparation and dispatch of text for publication of contract notice in Official Journal of the European Union and on the Agency’s buyer’s profile. Publication of notice in OJEU and on Agency’s buyer’s profile.

CPSO

2.6 Person running the tender executes relevant procurement procedure in accordance with the FR and IR, Regulation (EC) No 45/2001 and any other relevant Standard Operating Procedure and/or internal step-by-step guides provided by CPSO, consulting with the AO during the procedure as needed.

Person running the tender/AO

2.7 At the end of the evaluation, the draft evaluation committee report ranking the tenders is sent to CPSO for comment and review prior to signature by the committee members.

Person running the tender 2.8 The person running the tender updates finalises draft evaluation

committee report in light of CPSO’s comments, consulting with the evaluation committee as needed.

Person running the tender 2.9 Upon the basis of the finalised evaluation committee report the AO

decides whether to proceed with a contract or abandon the procedure. If decision is to abandon or cancel, procedure ends.

(8)

Step Action Responsibility

2.10 The person running the tender checks whether contract value is above ACPC threshold and if an opinion is required from ACPC. If opinion is not required go directly to 2.15.

AO

2.11 If over threshold of ACPC, the person running the tender prepares a draft ACPC report and annexes and submits this to CPSO for review.

Person running the tender 2.12 CPSO reviews the draft ACPC report and may make comments in

writing to AO. CPSO

2.13 AO finalises the ACPC report in light of CPSO’s comments and

submits to ACPC. AO

2.14 ACPC gives an Opinion, if applicable. ACPC 2.15 AO makes the contract final award decision to proceed or abandon

the procedure and nominates the responsible person(s) for (i) general administration of the contract e.g. price review and (ii) monitoring of performance of supplier. Person running the tender prepares draft award decision.

AO/person running the tender

2.16 CPSO reviews draft award decision. CPSO 2.17 AO signs final award decision, taking into account CPSO’s

comments. AO

2.18 Person running the tender prepares draft letters to inform successful and unsuccessful tenderers accordingly and submits to CPSO for review.

Person running the tender 2.19 CPSO reviews draft letters. CPSO 2.20 Person running the tender finalises letters for signature by AO and

requests successful tenderers to provide bank details if not already held by the Agency and proof regarding exclusion criteria if required. Letters are dispatched.

Person running the tender 2.21 AO implements the ten day standstill period where applicable. If

any challenge is made, AO reviews and decides whether or not to proceed with contract signature or suspend contract signature. AO obtains proof regarding exclusion criteria from successful tenderer, where applicable.

2.22 Requests for further information from unsuccessful tenderers are

responded to within the legal deadlines. Person running the tender

3.0 Contract Conclusion

3.1 In case of non-framework contracts, IA raises the financial commitment and sends the dossier with the final draft contract to the VO for ex ante verification and in parallel IA sends the final draft contract to CPSO for review. In case of framework contracts, IA sends IA sends only the final draft contract to CPSO for review as no financial commitment is required.

IA

3.2 VO Charter workflow applies for non-framework contracts. VO/AO/IA/ED 3.3 In all cases CPSO reviews draft contract and may make comments

to AO with copy to VO. CPSO indicates to AO any required suggestions or changes to the final draft contract electronically in track-changes mode and sends a copy to the VO.

CPSO

3.4 If VO makes comments to CPSO go to 3.5. If VO does not make any comments, go to 3.6.

VO 3.5 Upon receipt of a copy of comments raised by VO relating to an ex

ante check of a contract, CPSO contacts AO to initiate a discussion to advise and assist AO.

CPSO

3.6 Upon completion of contract checks, IA actions the commitment for

(9)

Step Action Responsibility 4.0 Post Contract Award

4.1 If award notice in OJEU is required, IA informs CPSO of the date of signature of the contract within 40 days of such signature and CPSO prepares and publishes award notice in the OJEU and on the Agency’s external website.

IA/CPSO

4.2 IA files all original signed contracts in the Department concerned. IA 4.3 As soon as possible and within a maximum of 48 days of signature

of contract by both parties, IA completes the entry of all relevant data on the contract into the contracts database, except for contracts under €15,000 in value.

IA

4.4 Finalisation of filing of all procurement documents using mandatory

filing plan. For contracts under €60,000 go to 4.6. AO 4.5 For contracts over €60,000 CPSO conducts debriefing of

procurement procedure and provides feedback to AO. CPSO 4.6 CPSO prepares all annual reports on contracts concluded for the

whole Agency and other centralised reports as and when required using the data entered by IA in the contracts database.

CPSO

4.7 Conduct of contract management at suitable intervals of execution of the contract (document performance reviews, update of service level agreements, price reviews, renewals etc) and signature of addenda.

AO/delegated Project Manager/IA 4.8 Update of contracts database with signed addenda. IA

4.9 Conduct of ex post evaluation reports as requested by AO. Project Manager or IA

4.10 Before contract expiry, AO reviews future requirements, taking into account any lessons learned and any ex post evaluation reports. Review if new procurement procedure is required.

AO

End of Process.

10. Records

All tender documentation and other records relating to procurement procedures involved in this procedure will be collected and maintained by the AO electronically inDocument Records Electronic Archive Management, ensuring appropriate levels of security, and in hard copy in the Division of the Authorising Officer or in the Agency’s official off-site storage facility. The AO shall conserve the supporting documentation for the relevant period as stated in the Agency’s Business Classification Scheme. IA shall file all original signed contracts in the Division concerned.

(10)

References

Related documents