• No results found

994 Structural PDF Booklet

N/A
N/A
Protected

Academic year: 2021

Share "994 Structural PDF Booklet"

Copied!
20
0
0

Loading.... (view fulltext now)

Full text

(1)

DESIGNCRITERIA DESIGNCRITERIA 100TN002-1 100TN002-1 CODESANDSTANDARDS CODESANDSTANDARDS 2010CALIFORNIABUILDINGCODE 2010CALIFORNIABUILDINGCODE (CBC)(CBC) W/STATEOF W/STATEOF CAAMENDMENTSCAAMENDMENTS ASCE7-05 ASCE7-05 ACI318-05 ACI318-05 AISC360-05,341-05,358-05 AISC360-05,341-05,358-05 ACI530-05/ASCE5-05/TMS402-05 ACI530-05/ASCE5-05/TMS402-05 ACI530.1-05/ASCE6-05/TMS602-05 ACI530.1-05/ASCE6-05/TMS602-05 2005NDS 2005NDS VERTICALLOADS VERTICALLOADS SOILSVALUES SOILSVALUES ALLOWABLESOILSPRESSURE@GRADE ALLOWABLESOILSPRESSURE@GRADE D L 2 5 0 0 P S F D L 2 5 0 0 P S F D L + L L 2 5 0 0 P S F D L + L L 2 5 0 0 P S F DL+LL DL+LL +SEISM+SEISMIC3333IC3333 PSFPSF ROOFLIV ROOFLIVELOAD=ELOAD= 20PSF20PSF

FLOORLIV FLOORLIVELOAD=125PSFELOAD=125PSF FLOORPA FLOORPARTITIRTITIONLIVELOAONLIVELOAD=D= 15PSF15PSF CORRID

CORRIDORS=ORS= N/APSFN/APSF LIVELOADSAREREDUCED LIVELOADSAREREDUCED WHEREWHERE PERMITTEDBYCODE. PERMITTEDBYCODE. LATERALLOADS LATERALLOADS SEISMIC: SEISMIC: SITECLA SITECLASSCSSC CS=CS= 0.2260.22633 S S = 0 . 5 0 7 ; S S = 0 . 5 0 7 ; S D S = 0 . 4 0S D S = 0 . 4 055 S1= S1= 0.225;SD1=0.225;SD1= 0.2360.236 R = 5 . 5 ; I = 1 . 5 ; I P = 1 . 5 R = 5 . 5 ; I = 1 . 5 ; I P = 1 . 5 Ω ΩO = 2 . 5 ; C D = 4O = 2 . 5 ; C D = 4 OCCUPANCYCATEGORY:IV OCCUPANCYCATEGORY:IV SEISMICDESIGNCATEGORY:D SEISMICDESIGNCATEGORY:D SEIS SEISMICBASESHMICBASESHEAR=EAR= 472KIPS472KIPS SEISMICFORCERESISTINGSYSTEM: SEISMICFORCERESISTINGSYSTEM: BLDGFRAME-SPECREINFCMUSW BLDGFRAME-SPECREINFCMUSW ANALYSISPROCEDURE:EQ.LAT'LFORCE ANALYSISPROCEDURE:EQ.LAT'LFORCE WIND: WIND: BASI BASICWINDSPEED=90MPHCWINDSPEED=90MPH EXPOSURECATEGORYC EXPOSURECATEGORYC I W - = I W - = 1 . 11 . 15 ; G C P I = 0 . 1 85 ; G C P I = 0 . 1 8 4. 4. 1. 1. 2. 2. 3. 3. 1) 1) 2) 2) 3) 3) FOOTING FOOTING MINIMUMDEPTH= MINIMUMDEPTH= 18IN18IN MINIMUMWIDTH= MINIMUMWIDTH= 12IN12IN

POWDERACTUATEDFASTENERS(SHOTPINS) POWDERACTUATEDFASTENERS(SHOTPINS) 100TN016-1

100TN016-1

THESENOTESGOVERNALLCONDITIONS

THESENOTESGOVERNALLCONDITIONS CALLEDOUTONCALLEDOUTON THEPLANSAS'SHOTTHEPLANSAS'SHOT PINS'UNLESSPINS'UNLESS SPECIFICALLYNOTEDOTHERWISE.

SPECIFICALLYNOTEDOTHERWISE. ALLSHOTPINS

ALLSHOTPINS SHALLBEX-UUNSHALLBEX-UUN IVERSALKNURLEDSHANKFASTENERSWITHSHANKDIAMETERIVERSALKNURLEDSHANKFASTENERSWITHSHANKDIAMETER OF0.157"AS

OF0.157"AS MANUFACTUREDBYHILTIINCORPORATEDINMANUFACTUREDBYHILTIINCORPORATEDIN ACCORDANCEWITHICCACCORDANCEWITHICC ESR-2269ESR-2269 ANDTHEHILTI

ANDTHEHILTI 2008'PRODUCTTECHNICALGUIDE'2008'PRODUCTTECHNICALGUIDE' SHOTPINSDRIVEN

SHOTPINSDRIVEN INTOSTEELBASEMATERIALSHALLMAINTAINAINTOSTEELBASEMATERIALSHALLMAINTAINA MINIMUMEDGEDISTANCEMINIMUMEDGEDISTANCE ATALLSTEELELEMENTSOF

ATALLSTEELELEMENTSOF 1/2"AND1/2"AND MINIMUMFASTENERSPACINGSHALLBE1".MINIMUMFASTENERSPACINGSHALLBE1". LENGTHLENGTH OFPIN

OFPIN SHALLBEASREQUIREDSHALLBEASREQUIRED TOPENETRATETHRUSTEELMEMBERU.N.O.TOPENETRATETHRUSTEELMEMBERU.N.O. AT3/4"THICKAT3/4"THICK STEEL,PENETRATIONNEEDNOTEXCEED1/2".

STEEL,PENETRATIONNEEDNOTEXCEED1/2". SHOTPINSDRIVENINTO

SHOTPINSDRIVENINTO CONCRETEBASEMATERIALSHALLMAINTAINAMINIMUMCONCRETEBASEMATERIALSHALLMAINTAINAMINIMUM EDGEDISTANCEEDGEDISTANCE ATALLCONCRETE

ATALLCONCRETE ELEMENTSOF3"ANDELEMENTSOF3"AND MINIMUMFASTENERSPACINGSHALLBE4".MINIMUMFASTENERSPACINGSHALLBE4". PINSPINS SHALLHAVE1

SHALLHAVE1 1/4"PENETRATIONU.N.O.1/4"PENETRATIONU.N.O. MINIMUMCONCRETETHICKNESSSHALLBE3MINIMUMCONCRETETHICKNESSSHALLBE3 TIMESTIMES THEPENETRATIONDEPTH.CONCRETESHALLATTAINFULL

THEPENETRATIONDEPTH.CONCRETESHALLATTAINFULL DESIGNSTRENGTHPRIORTODESIGNSTRENGTHPRIORTO INSTALLINGINSTALLING SHOTPINS.

SHOTPINS. SHOTPINSDRIVENINTO

SHOTPINSDRIVENINTO 31/4"31/4" MINIMUMLIGHTWEIGHTCONCRETEFILLMINIMUMLIGHTWEIGHTCONCRETEFILL OVER3"X20OVER3"X20 GAGA MINIMUMMETALDECKMAYBE

MINIMUMMETALDECKMAYBE INSTALLEDFROMTHETOPINSTALLEDFROMTHETOP ORFROMORFROM THEBOTTOMINTHEBOTTOMIN EITHEREITHER THEHIGHOR

THEHIGHOR LOW LOW FLUTE.PINSFLUTE.PINS INSTALLEDFROMTHETOPINSTALLEDFROMTHETOP SHALLBESPACEDASSHALLBESPACEDAS NOTEDABOVENOTEDABOVE FORTYPICALCONCRETEELEMENTS.

FORTYPICALCONCRETEELEMENTS. PINSINSTALLEDFROMTHEBOTTOMPINSINSTALLEDFROMTHEBOTTOM INTHEHIGHINTHEHIGH FLUTESFLUTES SHALLBEINSTALLEDWITHIN1"

SHALLBEINSTALLEDWITHIN1" OFFLUTECENTER.OFFLUTECENTER. PINSINSTALLEDFROMTHEPINSINSTALLEDFROMTHE BOTTOMINTHEBOTTOMINTHE LOW

LOW FLUTESSHALLBEINSTALLEDWITHIN1"FLUTESSHALLBEINSTALLEDWITHIN1" OFTHEFLUTEOFTHEFLUTE CENTERANDSHALLBECENTERANDSHALLBE NOCLOSERNOCLOSER THAN1

THAN1 1/8"TOTHE1/8"TOTHE EDGEOFTHEEDGEOFTHE LOW LOW FLUTE. FLUTE. PINSINSTALLEDFROMTHEBOTTOMSHALLPINSINSTALLEDFROMTHEBOTTOMSHALL BESPACEDNO

BESPACEDNO CLOSERTHAN5.1"CLOSERTHAN5.1" PARALLELTOTHEFLUTES.PINSPARALLELTOTHEFLUTES.PINS SHALLHAVE1"SHALLHAVE1" PENETRATIONPENETRATION U.N.O.CONCRETESHALLATTAINFULL

U.N.O.CONCRETESHALLATTAINFULL DESIGNSTRENGTHPRIORTODESIGNSTRENGTHPRIORTO INSTALLINGSHOTPINS.INSTALLINGSHOTPINS. 1. 1. 2. 2. 4. 4. 5. 5. 6. 6. 3.

3. ALLSHOTPIALLSHOTPINSSHALLINCNSSHALLINCLUDEP8STELUDEP8STEELWASHEELWASHERS.RS.

THEOPERATOR,TOOL,AND

THEOPERATOR,TOOL,AND FASTENERSHALLBEPRE-QUALIFIEDBYTHEPROJECTINSPECTOR.FASTENERSHALLBEPRE-QUALIFIEDBYTHEPROJECTINSPECTOR. SHOTPININSTALLERSSHALLBE

SHOTPININSTALLERSSHALLBE CERTIFIEDBYHILTIANDCERTIFIEDBYHILTIAND HAVEACURRENTHAVEACURRENT HILTIISSUEDHILTIISSUED OPERATORSLICENSE.SHOTPININSTALLATIONSHALLMEETALL OPERATORSLICENSE.SHOTPININSTALLATIONSHALLMEETALL OSHAREQUIREMENTS.OSHAREQUIREMENTS. 7.

7. SHOTPINSUSED

SHOTPINSUSED TOATTACHHANGERWIRESTOATTACHHANGERWIRES FORSUSPENDEDCEILINGSSHALLBEFORSUSPENDEDCEILINGSSHALLBE TESTEDTESTED INACCORDANCEWITH

INACCORDANCEWITH DSAIR25-2DSAIR25-2 8. 8. FOUNDATIONS FOUNDATIONS 310TN001-1 310TN001-1 ALLFOUNDATIONWORKSHALLBE

ALLFOUNDATIONWORKSHALLBE DONEINDONEIN ACCORDANCEWITHTHEREQUIREMENTSOFACCORDANCEWITHTHEREQUIREMENTSOF THETHE SOILSREPORT#8798.01DATEDJUNE

SOILSREPORT#8798.01DATEDJUNE 24,2010&24,2010& SUPPLEMESUPPLEMENTALLETTERDATEDFEBRUARY10,NTALLETTERDATEDFEBRUARY10, 20112011 BYWALLACE-KUHL&ASSOCIATES.

BYWALLACE-KUHL&ASSOCIATES. FOUNDATIONSSHALLBEARONCOMPACTEDEXISTINGSOILS FOUNDATIONSSHALLBEARONCOMPACTEDEXISTINGSOILS ORFIRMORFIRM NATIVESOILNATIVESOIL SEENOTESANDDETAILSON

SEENOTESANDDETAILSON SHEETS1.02SHEETS1.02 ALLFILLING,BACKFILLINGANDCOMPACTIONSHALL

ALLFILLING,BACKFILLINGANDCOMPACTIONSHALL BEDONEUNDERBEDONEUNDER THEOBSERVATIONOFATHEOBSERVATIONOFA REPRESENTA

REPRESENTATIVEOFTHETIVEOFTHE SOILSENGINEERANDMUSTSOILSENGINEERANDMUST BECOMPACTEDTOTHEBECOMPACTEDTOTHE MINIMUMMINIMUM DENSITYSPECIFIEDINACCORDANCEWITHTHE

DENSITYSPECIFIEDINACCORDANCEWITHTHE PROCEDUREOUTLINEDINTHEPROCEDUREOUTLINEDINTHE SOILSREPORT.SOILSREPORT. BUILDINGPADCONSTRUCTIONSHALLCONFORM

BUILDINGPADCONSTRUCTIONSHALLCONFORM TOTHEREQUIREMENTSOFTOTHEREQUIREMENTSOF THESOILSREPORT.THESOILSREPORT. THEEXTENTANDDEPTH

THEEXTENTANDDEPTH OFOVEREXCAVATIONANDPLACEMENTOFENGINEEREDFILLSHALLOFOVEREXCAVATIONANDPLACEMENTOFENGINEEREDFILLSHALL ATAT AMINIMUMBE

AMINIMUMBE ASSHOWNONASSHOWNON THEPLANS.THEPLANS. FINALDEPTHANDFINALDEPTHAND EXTENTOFEXCAVATIONEXTENTOFEXCAVATION ANDFILLSHALL

ANDFILLSHALL BEDETERMINEDATTIMEBEDETERMINEDATTIME OFCONSTRUCTIONBYAOFCONSTRUCTIONBYA REPRESENTAREPRESENTATIVEOFTHETIVEOFTHE SOILSENGINEER.FOUNDATION

SOILSENGINEER.FOUNDATION DEPTHSINDICATEDONPLANSAREDEPTHSINDICATEDONPLANSARE FORESTIMATINGFORESTIMATING PURPOSESONLY.

PURPOSESONLY. BOTTOMSOFALLFOUNDATIONSSHALL

BOTTOMSOFALLFOUNDATIONSSHALL BELEVEL.BELEVEL. CHANGESINBOTTOMOFCHANGESINBOTTOMOF FOUNDATIONFOUNDATION ELEVATIONSHALLBEMADEACCORDING

ELEVATIONSHALLBEMADEACCORDING TOSTEPPEDFOOTINGDETAILONTOSTEPPEDFOOTINGDETAILON THETYPICALTHETYPICAL DETAILSHEET.

DETAILSHEET.

FOUNDATIONCONCRETEMAYBEPLACEDDIRECTLY FOUNDATIONCONCRETEMAYBEPLACEDDIRECTLY INTONEATINTONEAT EXCAVATIO

EXCAVATIONSPROVIDEDPRIORNSPROVIDEDPRIOR WRITTENAPPROVALISOBTAINEDWRITTENAPPROVALISOBTAINED ANDA

ANDA REPRESENTAREPRESENTATIVEOFTHETIVEOFTHE SOILSENGINEERDETERMINESSOILSENGINEERDETERMINES THATTHEEXCAVATIONSARESTABLE. THATTHEEXCAVATIONSARESTABLE. WIDTHOFALLWIDTHOFALL UNFORMEDFOUNDATIONSSHALLBEINCREASEDBY UNFORMEDFOUNDATIONSSHALLBEINCREASEDBY 2'' 2'' FROMFROM PLANDIMENSION.OTHERWISE,FOUNDATIONSSHALL PLANDIMENSION.OTHERWISE,FOUNDATIONSSHALL BEFULLYBEFULLY FORMED.USE

FORMED.USE MINIMUMPLANKINGSHOWNTOMINIMUMPLANKINGSHOWNTO PROTECTAGAINSTPROTECTAGAINST SLOUGHING,ASREQUIRED.

SLOUGHING,ASREQUIRED. PLANKINGDOESNOTREPLACEPLANKINGDOESNOTREPLACE FORMWORKREQUIREDTOSTABILIZEEXCAVATION. FORMWORKREQUIREDTOSTABILIZEEXCAVATION. THESURFACEOFALL

THESURFACEOFALL HORIZONTALCONSTRUCTIONJOINTSSHALLBEHORIZONTALCONSTRUCTIONJOINTSSHALLBE CLEANED&ROUGHENEDCLEANED&ROUGHENED BYEXPOSINGCLEANAGGREGATESOLIDLYEMBEDDEDIN

BYEXPOSINGCLEANAGGREGATESOLIDLYEMBEDDEDIN MORTARMATRIX.MORTARMATRIX. NOTIFYTHESTRUCTURALENGINEER48

NOTIFYTHESTRUCTURALENGINEER48 HOURSBEFORECASTINGFOUNDATIONS.HOURSBEFORECASTINGFOUNDATIONS. AREPRESENTATIVEOFTHESOILSENGINEERSHALL

AREPRESENTATIVEOFTHESOILSENGINEERSHALL ADVISETHEBUILDINGOFFICIALINADVISETHEBUILDINGOFFICIALIN WRITINGTHAT:

WRITINGTHAT: A.THEBUILDING

A.THEBUILDING PADWASPREPAREDINPADWASPREPAREDIN ACCORDANCEWITHTHESOILSACCORDANCEWITHTHESOILS REPORT.REPORT. B.THEUTILITY

B.THEUTILITY TRENCHESHAVEBEENPROPERLYBACKFILLEDANDCOMPACTEDAND;TRENCHESHAVEBEENPROPERLYBACKFILLEDANDCOMPACTEDAND; C.THE

C.THE FOUNDATIONEXCAVATIONSFOUNDATIONEXCAVATIONS,FORMINGAND,FORMINGAND REINFORCEMENTCOMPLYWITHTHEREINFORCEMENTCOMPLYWITHTHE REPORTANDAPPROVEDPLAN. REPORTANDAPPROVEDPLAN. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. 22xx1122 1x81x8 22xx1122 FTG FTG WIDTH WIDTH +2'' +2'' PLAN PLAN STRUCTURALSTEEL STRUCTURALSTEEL 500TN001-1 500TN001-1 FABRICATION,ERECTIONANDMATERIALSSHALLCONFORMWITH

FABRICATION,ERECTIONANDMATERIALSSHALLCONFORMWITH THEAISCSPECIFICATIONFORTHEAISCSPECIFICATIONFOR THEDESIGN,FABRICATIONANDERECTION

THEDESIGN,FABRICATIONANDERECTION OFSTRUCTURALSTEELFOROFSTRUCTURALSTEELFOR BUILDINGSANDTHEBUILDINGSANDTHE CALIFORNIABUILDINGCODE,LATESTEDITIONS.

CALIFORNIABUILDINGCODE,LATESTEDITIONS. STRUCTURALSTEELWIDEFLANGESHAPESSHALLCONFORMWITH STRUCTURALSTEELWIDEFLANGESHAPESSHALLCONFORMWITH ASTMA992.ASTMA992. ALLOTHERALLOTHER STRUCTURALSTEELROLLEDSHAPES(CHANNELS,ANGLES,ETC)AND STRUCTURALSTEELROLLEDSHAPES(CHANNELS,ANGLES,ETC)AND PLATESSHALLCONFORMPLATESSHALLCONFORM WITHASTMA36,UNO.

WITHASTMA36,UNO. STEELPIPESHALLCONFORMTO

STEELPIPESHALLCONFORMTO ASTMA53,TYPESEORASTMA53,TYPESEOR S,GRADEB.S,GRADEB. ALLHOLLOW STRUCTURA

ALLHOLLOW STRUCTURALSECTIONS(HSS) SHALLCONFORMTOASTMA500,GRADELSECTIONS(HSS) SHALLCONFORMTOASTMA500,GRADE B.B. ALLSTRUCTURALSTEELSHALLRECEIVEMINIMUMOF

ALLSTRUCTURALSTEELSHALLRECEIVEMINIMUMOF ONESHOPCOATONESHOPCOAT OFREDPRIMEROFREDPRIMER PAINT.PAINT. DONOT

DONOT PAINTAREASTOBEPAINTAREASTOBE FIELDWELDED,FIREPROOFED,GALVANIZED,TORECEIVEFIELDWELDED,FIREPROOFED,GALVANIZED,TORECEIVE SLIP-CRITICALHIGHSTRENGTHBOLTS,OR

SLIP-CRITICALHIGHSTRENGTHBOLTS,OR TOBEEMBEDDEDINTOBEEMBEDDEDIN CONCRETE.PROVIDECONCRETE.PROVIDE ADDITIONALPAINTINGASNOTEDIN

ADDITIONALPAINTINGASNOTEDIN THESPECIFICATIONS.THESPECIFICATIONS. ALLSTRUCTURALSTEELSHALLBE

ALLSTRUCTURALSTEELSHALLBE ERECTEDPLUMBANDTRUEERECTEDPLUMBANDTRUE TOLINE.TOLINE. TEMPORARYBRACINGTEMPORARYBRACING SHALLBEINSTALLEDAND

SHALLBEINSTALLEDAND SHALLBELEFTINSHALLBELEFTIN PLACEUNTILOTHERPLACEUNTILOTHER MEANSAREPROVIDEDTOMEANSAREPROVIDEDTO ADEQUATELYBRACETHESTRUCTURE.CONTRACTOR

ADEQUATELYBRACETHESTRUCTURE.CONTRACTOR RESPONSIBLRESPONSIBLEFOREFOR REVIEWINGALLBASEREVIEWINGALLBASE PLATEANDSUPPORTCONDITIONSDURING

PLATEANDSUPPORTCONDITIONSDURING ERECTIONANDBRACINGASERECTIONANDBRACINGAS REQUIRED.SEEREQUIRED.SEE AISCAISC ANDOSHAREQUIREMENTS.

ANDOSHAREQUIREMENTS. PLACENON-SHRINKGROUTUNDER

PLACENON-SHRINKGROUTUNDER ALLBASEPLATESBEFOREADDINGVERTICALLOAD.ALLBASEPLATESBEFOREADDINGVERTICALLOAD. STRUCTURALSTEELBELOW

STRUCTURALSTEELBELOW GRADESHALLHAVE3GRADESHALLHAVE3 INCHESMINIMUMOFCONCRETEINCHESMINIMUMOFCONCRETE COVER.COVER. BOLTEDCONNECTIONSSHALLCONSISTOF

BOLTEDCONNECTIONSSHALLCONSISTOF UNFINISHEDBOLTSCONFORMINGTOASTMUNFINISHEDBOLTSCONFORMINGTOASTM A307A307 UNLESSNOTEDOTHERWISE.WHERE

UNLESSNOTEDOTHERWISE.WHERE HIGHSTRENGTHBOLTSAREINDICATED,HIGHSTRENGTHBOLTSAREINDICATED, BOLTSBOLTS CONFORMINGTOASTMA325

CONFORMINGTOASTMA325 ORASTMA490ORASTMA490 ASNEEDEDSHALLBEASNEEDEDSHALLBE PROVIDED.PROVIDED. ANCHORRODSCAST

ANCHORRODSCAST INCONCRETEORINCONCRETEOR MASONRYSHALLBEHEADEDBOLTSWITHMASONRYSHALLBEHEADEDBOLTSWITH CUTCUT THREADSCONFORMINGTOASTMF1554

THREADSCONFORMINGTOASTMF1554 GR.36,GR.36, 55,OR55,OR 105ASINDICATEDON105ASINDICATEDON DRAWINGS.DRAWINGS. ALLBOLTEDCONNECTIONSAND

ALLBOLTEDCONNECTIONSAND BASEPLATESSHALLHAVESTANDARDCUTWASHERSUNLESSBASEPLATESSHALLHAVESTANDARDCUTWASHERSUNLESS NOTEDOTHERWISE.WASHERSFORBASEPLATESSHALLCONFORM NOTEDOTHERWISE.WASHERSFORBASEPLATESSHALLCONFORM TOASTMF844UNLESSTOASTMF844UNLESS NOTEDOTHERWISE,ANDSHALLBE

NOTEDOTHERWISE,ANDSHALLBE PLACEDATTOPANDPLACEDATTOPAND BOTTOMOFPLATE.BOTTOMOFPLATE. "SLIP-CRITICAL"BOLTEDCONNECTIONS:

"SLIP-CRITICAL"BOLTEDCONNECTIONS:

PROVIDE1/2"DIAMETERSTITCHBOLTSAND

PROVIDE1/2"DIAMETERSTITCHBOLTSAND RINGFILLS,SPACEDATRINGFILLS,SPACEDAT NOTMORETHANNOTMORETHAN 2'-0"ON

2'-0"ON CENTERFORALLCENTERFORALL DOUBLEANGLEMEMBERS.DOUBLEANGLEMEMBERS. ATWOODTO

ATWOODTO STEELPARALLELCONTACT,BOLTWITH1/2"STEELPARALLELCONTACT,BOLTWITH1/2" DIAMETERBOLTSATMAXIMUMDIAMETERBOLTSATMAXIMUM 24"CC.

24"CC. HOLESFORUNFINISHEDBOLTS

HOLESFORUNFINISHEDBOLTS SHALLBEOFSHALLBEOF THESAMENOMINALDIAMETEROFTHESAMENOMINALDIAMETEROF THEBOLTTHEBOLT PLUS1/16".

PLUS1/16". USESTANDARDAISCGAGEANDUSESTANDARDAISCGAGEAND PITCHFORBOLTSPITCHFORBOLTS EXCEPTASNOTEDEXCEPTASNOTED OTHERWISE.

OTHERWISE. WELDINGSHALLBEDONE

WELDINGSHALLBEDONE BYTHEELECTRICARCBYTHEELECTRICARC PROCESSINACCORDANCEWITHPROCESSINACCORDANCEWITH AMERICANAMERICAN WELDINGSOCIETYSTANDARDS,USINGONLYCERTIFIEDWELDERS. WELDINGSOCIETYSTANDARDS,USINGONLYCERTIFIEDWELDERS. ALLGROOVEWELDSSHALLALLGROOVEWELDSSHALL HAVECOMPLETEPENETRATIONUNLESSNOTEDOTHERWISE.ALL

HAVECOMPLETEPENETRATIONUNLESSNOTEDOTHERWISE.ALL EXPOSEDWELDSSHALLBEEXPOSEDWELDSSHALLBE GROUNDSMOOTH.

GROUNDSMOOTH. ALLELECTRODESFORWELDINGSHALLALLELECTRODESFORWELDINGSHALL COMPLYWITHAWSCODE,COMPLYWITHAWSCODE, E70E70 SERIESMINIMUM.

SERIESMINIMUM. WELDLENGTHSCALLEDFOR

WELDLENGTHSCALLEDFOR ONPLANSAREONPLANSARE THENETEFFECTIVELENGTHSREQUIRED.THENETEFFECTIVELENGTHSREQUIRED. MINIM

MINIMUMFILLEUMFILLETWELDSTWELDS:: 3/163/16"@T"@T <1/2"<1/2" 1 / 4 1 / 4"" @ T < 3 / 4 "@ T < 3 / 4 " 5/16"@T>3/4" 5/16"@T>3/4" WELDINGPROCEDURESPECIFICATIONS(WPS)

WELDINGPROCEDURESPECIFICATIONS(WPS) FORSHOPANDFORSHOPAND FIELDPREQUALIFIEDWELDJOINTSFIELDPREQUALIFIEDWELDJOINTS ANDWELDJOINTS

ANDWELDJOINTS QUALIFIEDBYTESTSHALLBEPREPAREDFORQUALIFIEDBYTESTSHALLBEPREPAREDFOR REVIEW REVIEW PRIORTOFABRICATION.PRIORTOFABRICATION. ALLWELDINGPROCEDUREITEMSSUCH

ALLWELDINGPROCEDUREITEMSSUCH ASBASEMETALS,WELDINGPROCESSES,FILLERMETALSASBASEMETALS,WELDINGPROCESSES,FILLERMETALS ANDJOINTDETAILSTHAT

ANDJOINTDETAILSTHAT MEETTHEREQUIREMENTSOFAWSMEETTHEREQUIREMENTSOFAWS D1.1SECTION5.1D1.1SECTION5.1 SHALLBESHALLBE CONSIDEREDASPREQUALIFIED.ANY

CONSIDEREDASPREQUALIFIED.ANY CHANGEORSUBSTITUTIONTHATCHANGEORSUBSTITUTIONTHAT ISBEYONDTHERANGEISBEYONDTHERANGE ORTOLERANCEOR

ORTOLERANCEOR REQUIREMENTSFORPREQUALIFICATIOREQUIREMENTSFORPREQUALIFICATIONSHALLNSHALL BEQUALIFIEDBYTESTPERBEQUALIFIEDBYTESTPER AWSD1.1SECTION5

AWSD1.1SECTION5 PARTB.QUALIFICATIONTESTINGISREQUIREDPARTB.QUALIFICATIONTESTINGISREQUIRED WHENTHEDEPTHWHENTHEDEPTH OFOF APARTIALPENETRATIONORCOMPLETEPENETRATIONWELDIS APARTIALPENETRATIONORCOMPLETEPENETRATIONWELDIS 2"OR2"OR GREATER.GREATER. FORNONDESTRUCTIVETESTINGOFWELDEDCONNECTIONS

FORNONDESTRUCTIVETESTINGOFWELDEDCONNECTIONS EXCLUDINGPRIMARYMEMBERSOFEXCLUDINGPRIMARYMEMBERSOF MOMENTRESISTINGFRAMES:

MOMENTRESISTINGFRAMES:

BASEMETALTHICKERTHAN1

BASEMETALTHICKERTHAN1 INCHWHENINCHWHEN SUBJECTTOTHROUGHTHICKNESSWELDSUBJECTTOTHROUGHTHICKNESSWELD SHRINKAGESTRAINS.

SHRINKAGESTRAINS.

ALLCOMPLETEPENETRATIONGROOVEORBUTTWELDS. ALLCOMPLETEPENETRATIONGROOVEORBUTTWELDS. ALLPARTIALPENETRATIONGROOVEWELDSWHENUSED ALLPARTIALPENETRATIONGROOVEWELDSWHENUSED INCOLUMNINCOLUMN SPLICES.SPLICES. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. 10. 10. 11. 11. 12. 12. 13. 13. 14. 14. 15. 15. 16. 16. 17. 17. 18. 18. THESPECIALINSPECTORMUSTBEPRESENTDURING

THESPECIALINSPECTORMUSTBEPRESENTDURING INSTALLATIONANDTIGHTENINGINSTALLATIONANDTIGHTENING OPERATIONOF"SLIP-CRITICAL"CONNECTIONS.

OPERATIONOF"SLIP-CRITICAL"CONNECTIONS.

WELDEDCONNECTIONSSHALLBETESTEDBY

WELDEDCONNECTIONSSHALLBETESTEDBY NONDESTRUCTIVEMETHODSFORNONDESTRUCTIVEMETHODSFOR COMPLIANCEWITHAISC

COMPLIANCEWITHAISC J2,ANDJ2,AND JOBSPECIFICATIONS.ULTRASONICTESTINGSHALLJOBSPECIFICATIONS.ULTRASONICTESTINGSHALL BEINACCORDANCE

BEINACCORDANCE WITHAWSD1.1,WITHAWSD1.1, ASTME164ANDASMEASTME164ANDASME SECTIONV.SECTIONV. RADIOGRAPHYSHALLBEINACCORDANCE

RADIOGRAPHYSHALLBEINACCORDANCE WITHAWSD1.1,WITHAWSD1.1, ASTME94ANDASTME94AND E99,E99, ANDASMESECTIONV.THISTESTINGSHALL

ANDASMESECTIONV.THISTESTINGSHALL BEPARTOFBEPARTOF THESPECIALINSPECTIONTHESPECIALINSPECTION REQUIREMENTSOFCBCSECTION1704.3

REQUIREMENTSOFCBCSECTION1704.3 PERFORMEDBYANAPPROVEDINDEPENDENTPERFORMEDBYANAPPROVEDINDEPENDENT TESTINGLABORATORYASFOLLOWS:

TESTINGLABORATORYASFOLLOWS:

ANYMATERIALDISCONTINUITIESSHALLBEACCEPTEDORR ANYMATERIALDISCONTINUITIESSHALLBEACCEPTEDORR EJECTEDONTHEEJECTEDONTHE BASISOFBASISOF DEFECTRATINGINACCORDANCE

DEFECTRATINGINACCORDANCE WITHTHE(LARGERREFLECTOR)CRITERIAOFWITHTHE(LARGERREFLECTOR)CRITERIAOF AISCJ2.AISCJ2. A) A) B) B) B) B) A)

A) "SLIP-CRITICAL"SLIP-CRITICAL"CONNECTIONS(A325SCDESIGN"CONNECTIONS(A325SCDESIGN VALUESWITHSPECIALINSPECTION)VALUESWITHSPECIALINSPECTION) AREREQUIREDATALL

AREREQUIREDATALL BRACEDFRAMECONNECTIONS,ATALLBRACEDFRAMECONNECTIONS,ATALL CONNECTIONSALONGCONNECTIONSALONG CHORDLIN

CHORDLINESANDDRAGLINEESANDDRAGLINES(ASNOTEDONPLAS(ASNOTEDONPLANS),ANDUNO,ATALNS),ANDUNO,ATALLBOLTSINLBOLTSIN OVERSIZEDORSLOTTEDHOLES. OVERSIZEDORSLOTTEDHOLES. 1. 1. 2. 2. 3. 3. DRILLED-INANCHORS DRILLED-INANCHORS 305TN001-1 305TN001-1 ANCHORSSHALLBEINSTALLEDIN

ANCHORSSHALLBEINSTALLEDIN ACCORDANCEWITHTHEACCORDANCEWITHTHE REQUIREMENTSGIVENINTHEREQUIREMENTSGIVENINTHE ICCREPORT.

ICCREPORT.

UNLESSNOTEDOTHERWISEANCHORSHAVEBEEN

UNLESSNOTEDOTHERWISEANCHORSHAVEBEEN DESIGNEDFORSPECIALINSPECTION.DESIGNEDFORSPECIALINSPECTION. PROVIDESPECIALINSPECTIONASINDICATEDIN

PROVIDESPECIALINSPECTIONASINDICATEDIN THEICCTHEICC REPORT.REPORT. WHENINSTALLINGDRILLED-INANCHORSIN

WHENINSTALLINGDRILLED-INANCHORSIN EXISTINGCONCRETEORMASONRY,USECAREEXISTINGCONCRETEORMASONRY,USECARE ANDAND CAUTIONTOAVOID

CAUTIONTOAVOID CUTTINGORDAMAGINGCUTTINGORDAMAGING EXISTINGREINFORCINGBARS.DOEXISTINGREINFORCINGBARS.DO NOTNOT INSTALLINSTALL ANCHORSINPRESTRESSEDCONCRETEELEMENTS.

ANCHORSINPRESTRESSEDCONCRETEELEMENTS. ANCHORSINSTALLEDFROMTHEBOTTOM

ANCHORSINSTALLEDFROMTHEBOTTOM INTOMETALDECKWITHINTOMETALDECKWITH CONCRETESHALLBECONCRETESHALLBE INSTALLEDINTHECENTER

INSTALLEDINTHECENTER OFTHELOW OFTHELOW FLUTEOFTHEFLUTEOFTHE DECKINGUNLESSNOTEDOTHERWISEDECKINGUNLESSNOTEDOTHERWISE INICC

INICC REPORT.THEREPORT.THE DECKINGSHALLHAVEADECKINGSHALLHAVEA MINIMUMTHICKNESSOF20MINIMUMTHICKNESSOF20 GAUGE.GAUGE. THEMINIMUMTHICKNESSOF

THEMINIMUMTHICKNESSOF THECONCRETEABOVETHEHIGHTHECONCRETEABOVETHEHIGH FLUTEOFTHEFLUTEOFTHE METALDECKMETALDECK SHALLBEASINDICATED

SHALLBEASINDICATED INTHEINTHE ICCREPORT.SEEICCICCREPORT.SEEICC REPORTFORADDITIONALREPORTFORADDITIONAL REQUIREMENTS

REQUIREMENTS,INCLUDING,INCLUDING MINIMUMDIMENSIONSFORFLUTEWIDTHMINIMUMDIMENSIONSFORFLUTEWIDTH ANDDEPTH.ANDDEPTH. THETESTINGOF

THETESTINGOF THEANCHORSSHALLBETHEANCHORSSHALLBE DONEBYADONEBYA QUALIFIEDTESTINGAGENCYANDAQUALIFIEDTESTINGAGENCYANDA REPORTOFTHE

REPORTOFTHE TESTRESULTSSHALLBESUBMITTEDTOTESTRESULTSSHALLBESUBMITTEDTO THEGOVERNINGAGENCYANDTHEGOVERNINGAGENCYAND ARCHITECT/STRU

ARCHITECT/STRUCTURALENGINEER.SEENOTESONCTURALENGINEER.SEENOTESON THISSHEETFORTHISSHEETFOR TESTINGCRITERIA.TESTINGCRITERIA. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. EPOXYANCHORSSHALLBEHILTI

EPOXYANCHORSSHALLBEHILTI RE500-SDPERESR-2322ORRE500-SDPERESR-2322OR SIMPSONSET-XPPERESR-2508SIMPSONSET-XPPERESR-2508 FORTHR'DROD

FORTHR'DROD &REBAR.EXPANSIONANCHORSSHALLBE&REBAR.EXPANSIONANCHORSSHALLBE HILTIKB-TZPERESR-1917ORHILTIKB-TZPERESR-1917OR SIMPSONSTRONG-BOLTPERESR-1771.TYPE,SIZE&EMBEDMENTSHALLBE SIMPSONSTRONG-BOLTPERESR-1771.TYPE,SIZE&EMBEDMENTSHALLBE INDICATEDININDICATEDIN DRAWINGS.POST-INSTALL

DRAWINGS.POST-INSTALLEDANCHORSFOREDANCHORSFOR REPAIRSHALLBEEVALUATEDONREPAIRSHALLBEEVALUATEDON ACASEBYACASEBY CASEBASIS.NOTIFYSTRUCTURALENGINEERFORREPAIRS. CASEBASIS.NOTIFYSTRUCTURALENGINEERFORREPAIRS. 1. 1. DRILLED-INANCHORTESTINGCRITERIA DRILLED-INANCHORTESTINGCRITERIA A ANNCCHHOORR WWEEDDGGEE SSHHEELLLL 10 10 --25 25 SLEEVE SLEEVE 1/4" 1/4" 400400 400 400 700 700 800 800 1100 1100 2300 2300 3/8" 3/8" 5/8" 5/8" 1" 1" 58005800 1400 1400 1100 1100 900 900 150 150 80 80 50 50 --250 250 5/16" 5/16" 1/2" 1/2" 3/4" 3/4" --2000 2000 3700 3700 --20 20 45 45 90 90 10 10 55 44 11000000 1400 1400 1800 1800 5400 5400 3700 3700 2700 2700 --TESTINGFREQUENCYSHALLCOMPLYWITHCBC TESTINGFREQUENCYSHALLCOMPLYWITHCBC SECTION1916A.8SECTION1916A.8 HARDROCKORLIGHTWEIGHTCONCRETE HARDROCKORLIGHTWEIGHTCONCRETE TESTVALUES TESTVALUES DIAMETER DIAMETER ( I

( IN .N .)) ( L( LBLOADLOADBSS. ). ) (FT.LBS.)(FT.LBS.)TORQUETORQUE (LBS.)(LBS.)LOADLOAD (FT.LBS.)(FT.LBS.)TORQUETORQUE (LBS.)(LBS.)LOADLOAD (FT.LBS.)(FT.LBS.)TORQUETORQUE

--10 10 10 10 10 10 20 20 --SCREW SCREW (FT.LBS.) (FT.LBS.)TORQUETORQUE EPOXY EPOXY SEE SEE TENSION TENSION TEST TEST VALUEIN VALUEIN DRWGS DRWGS NOTES: NOTES: ANCHORDIAMETERREFERSTOTHE

ANCHORDIAMETERREFERSTOTHE THREADSIZEFORTHETHREADSIZEFORTHE WEDGE&SHELLCATEGORIES,ANDWEDGE&SHELLCATEGORIES,AND TOTHEANCHOR

TOTHEANCHOR OUTSIDEDIAMETERFORTHEOUTSIDEDIAMETERFORTHE SLEEVECATEGORY.SLEEVECATEGORY. APPLYPROOFTESTLOADSTOWEDGE

APPLYPROOFTESTLOADSTOWEDGE &SLEEVEANCHORSWITHOUTREMOVINGTHE&SLEEVEANCHORSWITHOUTREMOVINGTHE NUTIFNUTIF POSSIBLE

POSSIBLE.IF.IF NOT,REMOVENUTNOT,REMOVENUT ANDINSTALLAANDINSTALLA THREADEDCOUPLERTOTHETHREADEDCOUPLERTOTHE SAMETIGHTNESSSAMETIGHTNESS ASTHEORIGINALNUT

ASTHEORIGINALNUT USINGATORQUEUSINGATORQUE WRENCHTOAPPLYTHEWRENCHTOAPPLYTHE TESTLOAD.TESTLOAD. FORSLEEVE/SHELLINTERNALLYTHREADEDCATEGORIE

FORSLEEVE/SHELLINTERNALLYTHREADEDCATEGORIES,VERIFYTHATTHES,VERIFYTHATTHE ANCHORISNOTANCHORISNOT PREVENTE

PREVENTEDFROMDFROM WITHDRAWINGBYABASEPLATEOROTHERWITHDRAWINGBYABASEPLATEOROTHER FIXTURES.IFFIXTURES.IF RESTRAINTISFOUND,RESTRAINTISFOUND, LOOSENANDSHIM

LOOSENANDSHIM ORREMOVEFIXTURE(S)PRIORTOORREMOVEFIXTURE(S)PRIORTO TESTING.TESTING. REACTIONLOADSFROMTESTFIXTURESMAYBE

REACTIONLOADSFROMTESTFIXTURESMAYBE APPLIEDCLOSETOTHEAPPLIEDCLOSETOTHE ANCHORBEINGTESTED,ANCHORBEINGTESTED, PROVIDEDTHEANCHORIS

PROVIDEDTHEANCHORIS NOTRESTRAINEDFROMWITHDRAWINGBYTHENOTRESTRAINEDFROMWITHDRAWINGBYTHE FIXTURE(S).FIXTURE(S). SHELLTYPEANCHORSSHALLBE

SHELLTYPEANCHORSSHALLBE TESTEDASFOLLOWS:TESTEDASFOLLOWS: VISUALLYINSPECT25%FORFULL

VISUALLYINSPECT25%FORFULL EXPANSIONASEVIDENCEDBYTHELOCATIONEXPANSIONASEVIDENCEDBYTHELOCATION OFTHEOFTHE EXPANSIONPLUGINTHE

EXPANSIONPLUGINTHE ANCHORBODY.ANCHORBODY. PLUGLOCATIONOFPLUGLOCATIONOF AFULLYEXPANDEDANCHORAFULLYEXPANDEDANCHOR SHALLBEASRECOMMENDEDBY

SHALLBEASRECOMMENDEDBY THEMANUFACTURER,OR,INTHEMANUFACTURER,OR,IN THEABSENCEOFSUCHTHEABSENCEOFSUCH RECOMMENDATI

RECOMMENDATION,ASDETERMINEDONON,ASDETERMINEDON THEJOBSITETHEJOBSITE FOLLOWINGTHEMANUFACTURER'SFOLLOWINGTHEMANUFACTURER'S INSTALLATIONINSTRUCTIONS

INSTALLATIONINSTRUCTIONS.. ATLEAST5%OFATLEAST5%OF THEANCHORSSHALLBETHEANCHORSSHALLBE PROOFLOADEDPROOFLOADED ASINDICATEDIN

ASINDICATEDIN THETABLEABOVE,BUTNOTTHETABLEABOVE,BUTNOT LESSTHANTHREEANCHORSLESSTHANTHREEANCHORS PERDAYFORPERDAYFOR EACHDIFFERENTPERSONORCREW INSTALLINGANCHORSOR; EACHDIFFERENTPERSONORCREW INSTALLINGANCHORSOR; TESTINSTALLEDANCHORSPERCBC TESTINSTALLEDANCHORSPERCBC SECTION1916A.8SECTION1916A.8 TESTEQUIPMENT(INCLUDINGTORQUEWRENCHES)

TESTEQUIPMENT(INCLUDINGTORQUEWRENCHES) ISTOBEISTOBE CALIBRATEDBYANAPPROVEDCALIBRATEDBYANAPPROVED TESTINGLABORATORYINACCORDANCEWITHSTANDARDRECOGNIZEDPROCEDURES. TESTINGLABORATORYINACCORDANCEWITHSTANDARDRECOGNIZEDPROCEDURES.

THEFOLLOWINGCRITERIAAPPLYFOR

THEFOLLOWINGCRITERIAAPPLYFOR THEACCEPTANCEOFINSTALLEDANCHORS:THEACCEPTANCEOFINSTALLEDANCHORS: HYDRAULICRAMMETHOD:

HYDRAULICRAMMETHOD: THEANCHORSHALLTHEANCHORSHALL HAVENOOBSERVABLEMOVEMENTHAVENOOBSERVABLEMOVEMENT ATTHEAPPLICABLETESTLOAD.

ATTHEAPPLICABLETESTLOAD. FORWEDGEANDFORWEDGEAND SLEEVETYPEANCHORS,APRACTICALSLEEVETYPEANCHORS,APRACTICAL WAYTODETERMINEOBSERVABLEMOVEMENTISTHATTHEWASHER WAYTODETERMINEOBSERVABLEMOVEMENTISTHATTHEWASHER UNDERTHENUTUNDERTHENUT BECOMESLOOSE.

BECOMESLOOSE. TORQUEWRENCHMETHOD:

TORQUEWRENCHMETHOD: THEAPPLICABLETESTTORQUEMUSTBEREACHEDTHEAPPLICABLETESTTORQUEMUSTBEREACHED WITHINTHEFOLLOWINGLIMITS:

WITHINTHEFOLLOWINGLIMITS: ONE-HALF(1/2)TURNOF ONE-HALF(1/2)TURNOF THENUT.THENUT. ONE-QUARTER(1/4)

ONE-QUARTER(1/4) TURNOFTURNOF THENUTFORTHENUTFOR THE3/8IN.THE3/8IN. SLEEVEANCHORONLY.SLEEVEANCHORONLY. IFTHEMANUFACTURER'SRECOMMENDEDINSTALLATIONTORQUEISLESS IFTHEMANUFACTURER'SRECOMMENDEDINSTALLATIONTORQUEISLESS THANTHETESTTORQUETHANTHETESTTORQUE NOTEDIN

NOTEDIN THETABLE,THEMANUFACTURER'SRECOMMENDEDINSTALLATIONTORQUESHALLBETHETABLE,THEMANUFACTURER'SRECOMMENDEDINSTALLATIONTORQUESHALLBE USEDIN

USEDIN LIEUOFTHELIEUOFTHE TABULATEDVALUES.TABULATEDVALUES.

WEDGEORSLEEVETYPE: WEDGEORSLEEVETYPE: 305TN002-1 305TN002-1 1. 1. 2. 2. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. A. A. A. A. B. B. B. B. I.I. II. II. UNDERCUTANCHORSTHATALLOW

UNDERCUTANCHORSTHATALLOW VISUALCONFIRMATIONOFFULLSETVISUALCONFIRMATIONOFFULLSET NEEDNOTBENEEDNOTBE TESTED.TESTED. 3.

3.

TESTINGSHALLOCCURA

TESTINGSHALLOCCURA MINIMUMOF24MINIMUMOF24 HOURSAFTERINSTALLATION.HOURSAFTERINSTALLATION. 10. 10. METALDECKNOTES METALDECKNOTES 530SN001-1 530SN001-1 PROVIDEMETALDECKINGOFTYPEAND

PROVIDEMETALDECKINGOFTYPEAND GAUGEASSHOWNGAUGEASSHOWN ONPLANS.ONPLANS. METALFLOORDECKSHALL

METALFLOORDECKSHALL BECOMPOSITETYPE,CONFORMINGTOASTMBECOMPOSITETYPE,CONFORMINGTOASTM A653,STRUCTURALA653,STRUCTURAL QUALITY,WITHMINIMUMYIELDSTRENGTHOF

QUALITY,WITHMINIMUMYIELDSTRENGTHOF 38KSIAND38KSIAND SHALLBEZINCSHALLBEZINC COATEDPERASTMCOATEDPERASTM A653,G60COATING

A653,G60COATING DESIGNATION.DESIGNATION. METALROOFDECKSHALL

METALROOFDECKSHALL CONFORMTOASTMCONFORMTOASTM A653,STRUCTURALQUALITY,WITHMINIMUMYIELDA653,STRUCTURALQUALITY,WITHMINIMUMYIELD STRENGTHOF38

STRENGTHOF38 KSIANDSHALLKSIANDSHALL BEZINCCOATEDBEZINCCOATED PERASTMA653,G60PERASTMA653,G60 COATINGDESIGNATION.COATINGDESIGNATION. PRIORTOFABRICATION,THE

PRIORTOFABRICATION,THE CONTRACTORSHALLSUBMITSHOPDRAWINGSFORCONTRACTORSHALLSUBMITSHOPDRAWINGSFOR THEMETALTHEMETAL DECKING,SHOWINGDECKGAUGE,

DECKING,SHOWINGDECKGAUGE, SIZEANDLAYOUTASSIZEANDLAYOUTAS WELLASCLOSURECONDITIONS,WELLASCLOSURECONDITIONS, WELDSTOSUPPORTSAND

WELDSTOSUPPORTSAND SIDELAPDETAILS.SIDELAPDETAILS. CONNECTIONANDWELDING

CONNECTIONANDWELDING OFDECKINGTOOFDECKINGTO STRUCTURALSUPPORTSANDDECKSIDESEAMSSTRUCTURALSUPPORTSANDDECKSIDESEAMS SHALLBEASSPECIFIEDIN

SHALLBEASSPECIFIEDIN THESTRUCTURALDRAWINGS.THESTRUCTURALDRAWINGS. ALLELECTRODESFORWELDINGSHALLALLELECTRODESFORWELDINGSHALL COMPLYWITHAWSCODE,

COMPLYWITHAWSCODE, E60SERIESMINIMUM.E60SERIESMINIMUM. ALLREINFORCEDOPENINGSIN

ALLREINFORCEDOPENINGSIN METALDECKSHALLBEMETALDECKSHALLBE INSTALLEDBYMETALDECKINSTALLEDBYMETALDECK SUBCONTRACTOR.

SUBCONTRACTOR. ATMETALDECKSTO

ATMETALDECKSTO RECEIVECONCRETE,ABSOLUTELYNOCONDUITORRECEIVECONCRETE,ABSOLUTELYNOCONDUITOR PIPINGOFANYPIPINGOFANY TYPEISTO

TYPEISTO BEPLACEDHORIZONTALLYWITHINTHEBEPLACEDHORIZONTALLYWITHINTHE DEPTHOFTHEDEPTHOFTHE CONCRETEABOVETHECONCRETEABOVETHE METALDECK.

METALDECK. ATMETALDECKWITHOUT

ATMETALDECKWITHOUT CONCRETEFILLTHEFOLLOWINGCONCRETEFILLTHEFOLLOWING MAYBEATTACHEDWITHOUTSPECIFICMAYBEATTACHEDWITHOUTSPECIFIC APPROVALOFTHESTRUCTURALENGINEER:ACOUSTICALTILE

APPROVALOFTHESTRUCTURALENGINEER:ACOUSTICALTILE ANDGYPSUMBOARDCEILINGSANDGYPSUMBOARDCEILINGS ONLY;NOPIPING,

ONLY;NOPIPING, DUCTINGORDUCTINGOR CONDUIT.MAXIMUMCEILINGWEIGHT-CONDUIT.MAXIMUMCEILINGWEIGHT- 3.5PSF.MAXIMUMWIRE3.5PSF.MAXIMUMWIRE HANGE

HANGERLOAD=60#.RLOAD=60#. WHERESUSPENSIONORHANGERWIRES

WHERESUSPENSIONORHANGERWIRES AREREQUIREDBYOTHERS,VERIFYANDAREREQUIREDBYOTHERS,VERIFYAND COORDINATECOORDINATE LOCATIONS,PATTERNS,SPACINGS

LOCATIONS,PATTERNS,SPACINGS,ETC.,ETC. WITHTHEAPPROPRIATETRADE.WITHTHEAPPROPRIATETRADE. DRILLORDRILLOR PUNCHPUNCH HOLESATBOTTOMOF

HOLESATBOTTOMOF DECKFLUTESOFSUFFICIENTSIZEDECKFLUTESOFSUFFICIENTSIZE TOPASSSUPPORTWIRES.TOPASSSUPPORTWIRES. WIREWIRE SUPPORTSSHALLBELOOPEDAND

SUPPORTSSHALLBELOOPEDAND SECUREDWITHASECUREDWITHA MINIMUMOFTHREE(3)MINIMUMOFTHREE(3) TIGHTTURNSTIGHTTURNS AROUN

AROUNDAMINIMUM1-1DAMINIMUM1-1/2"X12"LONGFURRIN/2"X12"LONGFURRINGCHANNELORNO.3X12"LONGGCHANNELORNO.3X12"LONG REINFORCINGBARCENTEREDABOVETHE

REINFORCINGBARCENTEREDABOVETHE HOLEANDLAIDHOLEANDLAID INTHEINTHE DECKFLUTES.DECKFLUTES. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. COLDFORMEDMETALFRAMING COLDFORMEDMETALFRAMING 540SN001-1 540SN001-1 GALVANIZEDSHEETSTEELSHALLCONFORMTOASTM

GALVANIZEDSHEETSTEELSHALLCONFORMTOASTM A653,STRUCTURALQUALITY,WITHAA653,STRUCTURALQUALITY,WITHA MINIMUMYIELDSTRENGTHOF

MINIMUMYIELDSTRENGTHOF 33KSIFOR33KSIFOR 43MILS(1843MILS(18 GA)ANDTHINNERGA)ANDTHINNER ANDASTMA653,ANDASTMA653, STRUCTURALQUALITY,WITHA

STRUCTURALQUALITY,WITHA MINIMUMYIELDSTRENGTHOF50MINIMUMYIELDSTRENGTHOF50 KSIFOR54KSIFOR54 MILS(16GA)MILS(16GA) ANDAND THICKER.HOT-ROLLEDCARBON

THICKER.HOT-ROLLEDCARBON SHEETANDSTRIPSTEELUSEDSHEETANDSTRIPSTEELUSED INTHEFABRICATIONOFINTHEFABRICATIONOF COLD-FORMEDCOLD-FORMED MEMBERSSHALLCONFORMTOASTMA1011

MEMBERSSHALLCONFORMTOASTMA1011 WITHARUSTWITHARUST INHIBITIVECOATING.INHIBITIVECOATING. METALSTUDSANDJOISTSSHALL

METALSTUDSANDJOISTSSHALL BEOFSIZEANDBEOFSIZEAND THICKNESSSHOWNONDRAWINGSWITHTHICKNESSSHOWNONDRAWINGSWITH THETHE MINIMUMEFFECTIVESECTIONPROPERTIESSHOWNINTHE

MINIMUMEFFECTIVESECTIONPROPERTIESSHOWNINTHE TABLE(S).TABLE(S). MINIMUMTHICKNESSSHOWNIN

MINIMUMTHICKNESSSHOWNIN TABLEFORTHETHICKNESSSPECIFIEDREPRESENTS95%OFTABLEFORTHETHICKNESSSPECIFIEDREPRESENTS95%OF DESIGNTHICKNESSPER2001AISI

DESIGNTHICKNESSPER2001AISI CODE.CODE. METALFRAMINGSHALLBEPER

METALFRAMINGSHALLBEPER ICC-ESNO.4943P.ICC-ESNO.4943P. CONTRACTORSHALLBERESPONSIBLECONTRACTORSHALLBERESPONSIBLE FOROBTAININGAGENCYAPPROVALFORANY

FOROBTAININGAGENCYAPPROVALFORANY SUBSTITUTIOSUBSTITUTIONS.NS. WELDINGSHALLBEIN

WELDINGSHALLBEIN ACCORDANCEWITHAWSD1.3ACCORDANCEWITHAWSD1.3 "STRUCTURALWELDINGCODE-SHEET"STRUCTURALWELDINGCODE-SHEET STEEL".WELDERSSHALLBE

STEEL".WELDERSSHALLBE AWSCERTIFIED.WELDINGAWSCERTIFIED.WELDING RODS:E60XXSERIES.ALLRODS:E60XXSERIES.ALL FIELDFIELD WELDINGSHALLHAVESPECIALINSPECTION.

WELDINGSHALLHAVESPECIALINSPECTION. TYPICALMETALTRACKSHALLBESAMEGAUGE

TYPICALMETALTRACKSHALLBESAMEGAUGE ASSTUDSWHICHASSTUDSWHICH ITSUPPORTS,UNPUNCHED,WITHITSUPPORTS,UNPUNCHED,WITH AFLANG

AFLANGEWIDTHOF11/4INCHESANDADEPTEWIDTHOF11/4INCHESANDADEPTHEQUALTOTHENOMIHEQUALTOTHENOMINALSTUDPLNALSTUDPLUS2TIMESUS2TIMES THETRACKTHICKNESSPLUSTHE

THETRACKTHICKNESSPLUSTHE RADIUS.NESTEDTRACKSRADIUS.NESTEDTRACKS SHALLBEFABRICATEDTOFILLSHALLBEFABRICATEDTOFILL THETHE OUTSIDEOFA

OUTSIDEOFA TYPICALMETALTRACK.DEEPTYPICALMETALTRACK.DEEP LEGTRACKSSHALLHAVELEGTRACKSSHALLHAVE AMINIMUMFLANGEWIDTHAMINIMUMFLANGEWIDTH OF2

OF2 INCHES.USEINCHES.USE SLOTTEDSLIPTRACKSWHERESPECIFIED.SLOTTEDSLIPTRACKSWHERESPECIFIED. SEESECTIONSANDTYPICALSEESECTIONSANDTYPICAL METALSTUDDETAILS.

METALSTUDDETAILS. METALSTUDSSHALLNOTHAVE

METALSTUDSSHALLNOTHAVE PUNCH-OUTSCLOSERTHAN10"PUNCH-OUTSCLOSERTHAN10" FROMTHEENDFROMTHEEND OFTHESTUDOFTHESTUD OROR ATINTERMEDIATELATERALBEARINGPOINTSOFSTUDS. ATINTERMEDIATELATERALBEARINGPOINTSOFSTUDS. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. GAUGE/MIL GAUGE/MIL MINTHICKNESS MINTHICKNESS DEPTH"D" DEPTH"D" 21/2" 21/2" 35/8" 35/8" 4" 4" 6" 6" 8" 8" 0.235 0.235 SX SX IX IX 00..00332299 00..00442288 00..00553388 00..00667777 2200//3333 1188//4433 1166//5544 1144//6688 15/8"TYP 15/8"TYP    "    "    D    D    "    "    1    1    /    /    2    2    "    "    T    T    Y    Y    P    P SSTUDS& SSTUDS& JOISTSJOISTS

00. 1. 18800 00. 3. 30022 00. 2. 24 04 0 0 .0 .337 07 0 0 .0 .228 88 8 0 .0 .445 05 0 0 .0 .335 75 7 0 . 0 .5 55 511 00. 2. 29922 00. 7. 71100 00. 3. 38 98 90 .887 30 .7 3 0 .0 .446 86 8 1 .1 .006 96 9 0 .0 .558 48 4 0.666 0.666 1.346 1.346 0.533 0.533 1.098 1.098 0.443 0.443 0.892 0.892 0.332 0.332 0.692 0.692 1.164 1.164 3.525 3.525 0.927 0.927 2.860 2.860 0.767 0.767 2.316 2.316 0.577 0.577 1.793 1.793 1.757 1.757 7.089 7.089 1.397 1.397 5.736 5.736 1.158 1.158 4.633 4.633 0.757 0.757 3.582 3.582 IIX X SSXX IIXX SSXX IIXX SSXX DESIGNATION DESIGNATION SS116622--3333 SS116622--4433 SS116622--5544 SS116622--6688 FORCOMPLETESECTIONDESIGNATIONSINACCORDANCEWITH

FORCOMPLETESECTIONDESIGNATIONSINACCORDANCEWITH SSMASTANDARDS,ADDMEMBERSSMASTANDARDS,ADDMEMBER DEPTHTOFRONT

DEPTHTOFRONT OFINDICATEDDESIGNATION.EXAMPLE:FOR3OFINDICATEDDESIGNATION.EXAMPLE:FOR3 5/8"MEMBERWITHGAUGE/MILOF5/8"MEMBERWITHGAUGE/MILOF 18/43,THEFULL

18/43,THEFULL DESIGNATIONIS362S162-43.DESIGNATIONIS362S162-43.

SECTIONPROPERTIESSHOWNAREEFFECTIVEPROPERTIESCONFORMINGTOAISIA7.2 SECTIONPROPERTIESSHOWNAREEFFECTIVEPROPERTIESCONFORMINGTOAISIA7.2 PERSSMASTANDARDSPERSSMASTANDARDS FORMATERIALSTRENGTHNOTEDBELOW.

FORMATERIALSTRENGTHNOTEDBELOW. PROVIDE33KSI

PROVIDE33KSI MINMATERIALFOR18/43MINMATERIALFOR18/43 &LISTEDSECTIONS,PROVIDE50&LISTEDSECTIONS,PROVIDE50 KSIMATERIALFOR16/54KSIMATERIALFOR16/54 &HEAVIERSECTIONS. &HEAVIERSECTIONS. 1. 1. 2. 2. 3. 3. -- -- -- -- 1155..773300 22..002244 1199..55118822..995533 -- -- 88..002255 11..441144 99..995500 11..771122 1122..332255 22..446655 12" 12" 10" 10" COLDFORMEDMETALFRAMING

COLDFORMEDMETALFRAMING SECTIONPROPERTIES- SECTIONPROPERTIES- SSMACSTUDSSSMACSTUDS &JOISTS- S162SECTIONS&JOISTS- S162SECTIONS2,32,3 540SN002-1 540SN002-1 METALSTAIRWAYS METALSTAIRWAYS 550SN001-1 550SN001-1 SUPPLIERSHALLPROVIDECOMPLETEDESIGNDRAWINGSANDCALCULATIONSFOR SUPPLIERSHALLPROVIDECOMPLETEDESIGNDRAWINGSANDCALCULATIONSFOR ALLMETALALLMETAL STAIRWAY

STAIRWAYS.S. STAIRWAYSSHALLBEDESIGNEDFORDEADSTAIRWAYSSHALLBEDESIGNEDFORDEAD LOAD+LOAD+ 100PSFLIVE100PSFLIVE LOAD,ANDLOAD,AND SEISMICLOADS.

SEISMICLOADS.

SUPPLIERSHALLDESIGN,SUPPLY,ANDINSTALLALL

SUPPLIERSHALLDESIGN,SUPPLY,ANDINSTALLALL CONNECTIONMATERIALSWHICHSHALLCONNECTIONMATERIALSWHICHSHALL INCLUDEBUTARE

INCLUDEBUTARE NOTNECESSARILYLIMITEDTOEMBEDDEDITEMS,BEARINGPLATES,NOTNECESSARILYLIMITEDTOEMBEDDEDITEMS,BEARINGPLATES, STIFFENERS

STIFFENERS,DIAGONALSTRUTS,SUPPORTANGLES,CHANNELS,DIAGONALSTRUTS,SUPPORTANGLES,CHANNELS ANDTUBES.ANDTUBES. ALLLOADINGALLLOADING CONDITIONSRESULTINGINECCENTRICITIESOR

CONDITIONSRESULTINGINECCENTRICITIESOR TORSIONTOBEAMSAND/ORTORSIONTOBEAMSAND/OR COLUMNSSHALLBECOLUMNSSHALLBE RESOLVEDBYTHEINSTALLATIONOFSTIFFENERSANDDIAGONAL

RESOLVEDBYTHEINSTALLATIONOFSTIFFENERSANDDIAGONAL STRUTS,DESIGNED,SUPPLIEDANDSTRUTS,DESIGNED,SUPPLIEDAND INSTALLEDBYTHESUPPLIER.

INSTALLEDBYTHESUPPLIER. SEISMICFORCESSHALLBEACCOUNTEDFOR

SEISMICFORCESSHALLBEACCOUNTEDFOR ANDBRACEDBACKTOANDBRACEDBACKTO THEMAINSTRUCTURE.THEMAINSTRUCTURE. SLIPDETAILSSHALLBEINCORPORATEDAT

SLIPDETAILSSHALLBEINCORPORATEDAT GROUNDLEVELFORGROUNDLEVELFOR STORYDRIFT.STORYDRIFT. POSITIVETIESUSINGPOSITIVETIESUSING 1. 1. 2. 2. 3. 3. INTERPRETAT

INTERPRETATIONOFIONOF DRAWINGS&SPECIFICATIONSDRAWINGS&SPECIFICATIONS

INGENERAL,THE

INGENERAL,THE WORKINGDETAILSWILLINDICATEDIMENSIONS,POSITIONANDWORKINGDETAILSWILLINDICATEDIMENSIONS,POSITIONAND KINDOFKINDOF CONSTRUCTION,ANDTHESPECIFICATIONS,QUALITIESANDMETHODS.

CONSTRUCTION,ANDTHESPECIFICATIONS,QUALITIESANDMETHODS. ANYWORKINDICATEDONANYWORKINDICATEDON THETHE WORKINGDETAILSANDNOT

WORKINGDETAILSANDNOT MENTIONEDINTHEMENTIONEDINTHE SPECIFICATSPECIFICATIONS,ORIONS,OR VICEVERSA,SHALLBEFURNISHEDVICEVERSA,SHALLBEFURNISHED ASTHOUGHFULLY

ASTHOUGHFULLY SETFORTHINSETFORTHIN BOTH.WORKBOTH.WORK NOTPARTICULARLYDETAILED,MARKEDORSPECIFIED,NOTPARTICULARLYDETAILED,MARKEDORSPECIFIED, SHALLBETHE

SHALLBETHE SAMEASSIMILARPARTSTHATARESAMEASSIMILARPARTSTHATARE DETAILED,MARKEDORSPECIFIED.DETAILED,MARKEDORSPECIFIED. IFCONFLICTSIFCONFLICTS OCCURON

OCCURON DRAWINGSAND/ORSPECIFICATIONS,THEMOSTEXPENSIVEMATERIALSORMETHODSWILLDRAWINGSAND/ORSPECIFICATIONS,THEMOSTEXPENSIVEMATERIALSORMETHODSWILL PREVAIL.

PREVAIL. SHOULDANERROR

SHOULDANERROR APPEARINTHEWORKINGAPPEARINTHEWORKING DETAILSORSPECIFICATIONSORINDETAILSORSPECIFICATIONSORIN WORKDONEBYWORKDONEBY OTHERSAFFECTINGTHISWORK,THE

OTHERSAFFECTINGTHISWORK,THE CONTRACTORSHALLNOTIFYTHEARCHITECTATCONTRACTORSHALLNOTIFYTHEARCHITECTAT ONCEANDONCEAND ININ WRITING.IF

WRITING.IF THECONTRACTORPROCEEDSWITHTHETHECONTRACTORPROCEEDSWITHTHE WORKSOAFFECTEDWITHOUTHAVINGWORKSOAFFECTEDWITHOUTHAVING GIVENSUCHGIVENSUCH WRITTENNOTICEANDWITHOUT

WRITTENNOTICEANDWITHOUT RECEIVINGTHENECESSARYAPPROVALRECEIVINGTHENECESSARYAPPROVAL,DECISIONOR,DECISIONOR INSTRUCTIONSININSTRUCTIONSIN WRITINGFROMTHE

WRITINGFROMTHE OWNER,THENHEOWNER,THENHE SHALLHAVENOVALIDSHALLHAVENOVALID CLAIMAGAINSTTHEOWNER,FORCLAIMAGAINSTTHEOWNER,FOR THECOSTTHECOST OFSO

OFSO PROCEEDINGANDSHALLMAKEGOODPROCEEDINGANDSHALLMAKEGOOD ANYRESULTINGDAMAGEORANYRESULTINGDAMAGEOR DEFECT.NODEFECT.NO VERBALVERBAL APPROVAL,DECISION,ORINSTRUCTIONSHALLBE

APPROVAL,DECISION,ORINSTRUCTIONSHALLBE VALIDORBEVALIDORBE THEBASISFORTHEBASISFOR ANYCLAIMAGAINSTTHEANYCLAIMAGAINSTTHE OWNER,ITSOFFICERS,EMPLOYEESORAGENTS.

OWNER,ITSOFFICERS,EMPLOYEESORAGENTS. THEFOREGOINGINCLUDESTYPICALERRORSINTHEFOREGOINGINCLUDESTYPICALERRORSIN THETHE SPECIFICATI

SPECIFICATIONSORONSOR NOTATIONALERRORSINTHENOTATIONALERRORSINTHE WORKINGDETAILSWHERETHEINTERPRETATIONISWORKINGDETAILSWHERETHEINTERPRETATIONIS DOUBTFULORWHERE

DOUBTFULORWHERE THEERRORISTHEERRORIS SUFFICIENTLYAPPARESUFFICIENTLYAPPARENTASTONTASTO PLACEAREASONABLYPRUDENTPLACEAREASONABLYPRUDENT CONTRACTORONNOTICE

CONTRACTORONNOTICE THAT,SHOULDHETHAT,SHOULDHE ELECTTOPROCEED,HEELECTTOPROCEED,HE ISDOINGSOISDOINGSO ATHISOWNATHISOWN RISK.RISK. CONSTRUCTIONSHALLCONFORMTO

CONSTRUCTIONSHALLCONFORMTO ALLAPPLICABLECODESANDREGULATIONS.ALLAPPLICABLECODESANDREGULATIONS. SHOPDRAWINGNOTE:

SHOPDRAWINGNOTE: SHOPDRAWINGSSHALLBE

SHOPDRAWINGSSHALLBE SUBMITTEDINTHEFORMSUBMITTEDINTHEFORM OFTHREECOPIESMINIMUMOFTHREECOPIESMINIMUM OFEACHSHEET.OFEACHSHEET. THEPURPOSEOFSHOP

THEPURPOSEOFSHOP DRAWINGSSUBMITTALSBYTHECONTRACTORISDRAWINGSSUBMITTALSBYTHECONTRACTORIS TODEMONSTRATETOTODEMONSTRATETO THESTRUCTURALENGINEERTHATHE

THESTRUCTURALENGINEERTHATHE UNDERSTANDSTHEDESIGNCONCEPTBYINDICATINGWHICHUNDERSTANDSTHEDESIGNCONCEPTBYINDICATINGWHICH MATERIALHEINTENDSTO

MATERIALHEINTENDSTO FURNISHANDINSTALL,ANDFURNISHANDINSTALL,AND BYDETAILINGTHEFABRICATIONAND

BYDETAILINGTHEFABRICATIONAND INSTALLATIONMETHODSHEINTENDSTOUSEINSTALLATIONMETHODSHEINTENDSTOUSE ONAONA STANDSTAND ALONESETOF

ALONESETOF DOCUMENTS.DUPLICATIONOFDOCUMENTS.DUPLICATIONOF DESIGNDOCUMENTSFORTHEDESIGNDOCUMENTSFORTHE PURPOSEOFSHOPPURPOSEOFSHOP DRAWINGSISNOT

DRAWINGSISNOT ACCEPTABLACCEPTABLE.E. PRIORTOFABRICATION,SHOPDRAWINGS

PRIORTOFABRICATION,SHOPDRAWINGS SHALLBESUBMITTEDFORREVIEW SHALLBESUBMITTEDFORREVIEW BYTHESTRUCTURALBYTHESTRUCTURAL ENGINEER.SHOP

ENGINEER.SHOP DRAWINGSUBMITTALSSHALLINCLUDE,BUTAREDRAWINGSUBMITTALSSHALLINCLUDE,BUTARE NOTNECESSARILYLIMITEDTO,NOTNECESSARILYLIMITEDTO, STRUCTURALSTEEL,REINFORCINGSTEEL,&GLUED

STRUCTURALSTEEL,REINFORCINGSTEEL,&GLUED LAMINATEDBEAMS.LAMINATEDBEAMS. PRIORTOSUBMISSIONTHE

PRIORTOSUBMISSIONTHE CONTRACTORSHALLREVIEW CONTRACTORSHALLREVIEW ALLSUBMITTALSFORCONFORMANCEALLSUBMITTALSFORCONFORMANCE WITHTHECONTRACT

WITHTHECONTRACT DOCUMENTSANDSHALLSTAMPSUBMITTALSASBEING"REVIEWEDFORDOCUMENTSANDSHALLSTAMPSUBMITTALSASBEING"REVIEWEDFOR CONFORMANCE".

CONFORMANCE".

SHOPDRAWINGSSUBMITTALSPROCESSEDBYTHESTRUCTURALENGINEERARENOT SHOPDRAWINGSSUBMITTALSPROCESSEDBYTHESTRUCTURALENGINEERARENOT CHANGEORDERS.CHANGEORDERS. ANYDETAILON

ANYDETAILON THESHOPDRAWINGTHATTHESHOPDRAWINGTHAT DEVIATESFROMTHECONTRACTDOCUMENTSSHALLDEVIATESFROMTHECONTRACTDOCUMENTSSHALL CLEARLYBEMARKEDWITHTHE

CLEARLYBEMARKEDWITHTHE NOTE"THISANOTE"THISA CHANGE".CHANGE". SHOPDRAWINGSOR

SHOPDRAWINGSOR CALCULATIONSSUBMITTECALCULATIONSSUBMITTEDFORDFOR REVIEW REVIEW THATREQUIRERESUBMITTALFORTHATREQUIRERESUBMITTALFOR RE-REVIEW

RE-REVIEW SHALLBEBILLEDHOURLYSHALLBEBILLEDHOURLY FORSUCHTIMEFORSUCHTIME TOTHEGENERALTOTHEGENERAL CONTRACTOR.RE-REVIEWCONTRACTOR.RE-REVIEW WILLNOTPROCEED

WILLNOTPROCEED WITHOUTWRITTENAPPROVALFROMTHEGENERALCONTRACTORFORWITHOUTWRITTENAPPROVALFROMTHEGENERALCONTRACTORFOR ADDITIONALENGINEERINGREVIEW SERVICES.

ADDITIONALENGINEERINGREVIEW SERVICES. SAFETYNOTE:

SAFETYNOTE:

THECONTRACTORSHALLNOTIFYTHE

THECONTRACTORSHALLNOTIFYTHE ARCHITECTANDSTRUCTURALENGINEERWHEREAARCHITECTANDSTRUCTURALENGINEERWHEREA CONFLICTORCONFLICTOR DISCREPANCYOCCURSBETWEENTHESTRUCTURALDRAWINGSANDANY

DISCREPANCYOCCURSBETWEENTHESTRUCTURALDRAWINGSANDANY OTHERPORTIONOFOTHERPORTIONOF THETHE CONTRACTDOCUMENTSOREXISTINGFIELD

CONTRACTDOCUMENTSOREXISTINGFIELD CONDITIONS.SUCHCONDITIONS.SUCH NOTIFICATIONSHALLBEGIVENINNOTIFICATIONSHALLBEGIVENIN DUEDUE TIMESOASNOT

TIMESOASNOT TOAFFECTTHECONSTRUCTIONSCHEDULE.TOAFFECTTHECONSTRUCTIONSCHEDULE. INCASEOFINCASEOF ACONFLICTBETWEENACONFLICTBETWEEN STRUCTURALDRAWINGSANDSPECIFICATIONSTHEMORERESTRICTIVECONDITIONSHALLTAKE STRUCTURALDRAWINGSANDSPECIFICATIONSTHEMORERESTRICTIVECONDITIONSHALLTAKE PRECEDENCEUNLESSWRITTENAPPROVALHASBEENGIVENFOR

PRECEDENCEUNLESSWRITTENAPPROVALHASBEENGIVENFOR THELEASTRESTRICTIVE.THELEASTRESTRICTIVE. CONTRACTORSHALLVERIFYALLDIMENSIONSWITHARCHITECTURALPRIOR

CONTRACTORSHALLVERIFYALLDIMENSIONSWITHARCHITECTURALPRIOR TOCOMMENCINGANYWORK.TOCOMMENCINGANYWORK. WHERENOSPECIFICDETAILIS

WHERENOSPECIFICDETAILIS SHOWN,THECONSTRUCTIONSHALLBESHOWN,THECONSTRUCTIONSHALLBE IDENTICALORSIMILARTOIDENTICALORSIMILARTO THATTHAT INDICATEDFORLIKECASESOF

INDICATEDFORLIKECASESOF CONSTRUCTIONONTHISCONSTRUCTIONONTHIS PROJECT.SHOULDPROJECT.SHOULD THEREBEANYQUESTION,THEREBEANYQUESTION, CONTACTTHEARCHITECTAND

CONTACTTHEARCHITECTAND STRUCTURALENGINEERPRIORTOPROCEEDING.STRUCTURALENGINEERPRIORTOPROCEEDING. WHENCONSTRUCTIONATTACHESTOAN

WHENCONSTRUCTIONATTACHESTOAN EXISTINGBUILDING,ACOMPLETESETOFEXISTINGBUILDING,ACOMPLETESETOF DRAWINGSOFTHEDRAWINGSOFTHE EXISTINGEXISTING BUILDINGSHALLBEKEPTON

BUILDINGSHALLBEKEPTON THEJOBSITE.THEJOBSITE. CONTRACTORTOOBTAINTHESEDRAWINGSCONTRACTORTOOBTAINTHESEDRAWINGS FROMTHEOWNER.FROMTHEOWNER. CONTRACTORSHALLPROVIDEANALLOWANCEEQUAL

CONTRACTORSHALLPROVIDEANALLOWANCEEQUAL TO2%OFTO2%OF THEBIDFORTHEBIDFOR STRUCTURALSTEEL,STRUCTURALSTEEL, MISC.IRONAND

MISC.IRONAND REINFORCINGSTEELTOBEREINFORCINGSTEELTOBE USEDATTHEUSEDATTHE DISCRETIONOFTHEDISCRETIONOFTHE STRUCTURALSTRUCTURAL ENGINEER.UNUSEDAMOUNT

ENGINEER.UNUSEDAMOUNT TOREVERTTOTOREVERTTO THEOWNERUPONTHEOWNERUPON COMPLETIONOFTHEJOB.COMPLETIONOFTHEJOB. ANYSUBSTITUTIONSFORSTRUCTURALMEMBERS,HARDWAREORDETAILSSHALLBE ANYSUBSTITUTIONSFORSTRUCTURALMEMBERS,HARDWAREORDETAILSSHALLBE REVIEWEDBYTHEREVIEWEDBYTHE ARCHITECTANDSTRUCTURALENGINEER.

ARCHITECTANDSTRUCTURALENGINEER. SUCHREVIEW SUCHREVIEW WILLBEBILLEDONWILLBEBILLEDON ATIMEANDATIMEAND MATERIALSMATERIALS BASISTOTHEGENERALCONTRACTORWITH

BASISTOTHEGENERALCONTRACTORWITH NOGUARANTEETHATTHESUBSTITUTIONWILLNOGUARANTEETHATTHESUBSTITUTIONWILL BEALLOWED.BEALLOWED. DONOT

DONOT SCALEDRAWINGS.CONTACTSCALEDRAWINGS.CONTACT THEARCHITECTORTHEARCHITECTOR STRUCTURALENGINEERFORANYSTRUCTURALENGINEERFORANY DIMENSIONSNOTSHOWN.

DIMENSIONSNOTSHOWN. THESEDRAWINGSARENOT

THESEDRAWINGSARENOT COMPLETEUNTILREVIEWEDANDACCEPTEDBYLOCALCOMPLETEUNTILREVIEWEDANDACCEPTEDBYLOCAL BUILDINGOFFICIALSBUILDINGOFFICIALS ANDSIGNEDBYTHE

ANDSIGNEDBYTHE OWNERANDTHEOWNERANDTHE STRUCTURALENGINEER.STRUCTURALENGINEER. GENERALNOTES

GENERALNOTES 100SN001-1 100SN001-1

ITISTHE

ITISTHE CONTRACTORSRESPONSIBILICONTRACTORSRESPONSIBILITYTOCOMPLYWITHTYTOCOMPLYWITH THEPERTINENTSECTIONS,ASTHEYTHEPERTINENTSECTIONS,ASTHEY APPLYTOTHISPROJECT,OF

APPLYTOTHISPROJECT,OF THE"CONSTRUCTIONSAFETYORDERS"ISSUEDBYTHE"CONSTRUCTIONSAFETYORDERS"ISSUEDBY THESTATEOFTHESTATEOF CALIFORNIALATESTEDITION,ANDALL

CALIFORNIALATESTEDITION,ANDALL OSHAREQUIREMENTS.OSHAREQUIREMENTS. THEOWNERAND

THEOWNERAND THESTRUCTURALENGINEERDOTHESTRUCTURALENGINEERDO NOTACCEPTANYRESPONSIBILITYFORTHENOTACCEPTANYRESPONSIBILITYFORTHE CONTRACTOR'SFAILURETOCOMPLYWITHTHESE

CONTRACTOR'SFAILURETOCOMPLYWITHTHESE REQUIREMENTSREQUIREMENTS.. THECONTRACTORSHALLBE

THECONTRACTORSHALLBE RESPONSIBLEFORADEQUATEDESIGNANDCONSTRUCTIONOFRESPONSIBLEFORADEQUATEDESIGNANDCONSTRUCTIONOF ALLALL FORMSANDSHORING

FORMSANDSHORING REQUIRED.REQUIRED.

FORCONVENIENCE,SPECIFICATIONSHAVEBEENPREPAREDFORTHISPROJECT FORCONVENIENCE,SPECIFICATIONSHAVEBEENPREPAREDFORTHISPROJECT ANDAREANDARE ARRANGEDINSEVERALSECTIONS,

ARRANGEDINSEVERALSECTIONS, BUTSUCHSEPARATIONSHALLNOT

BUTSUCHSEPARATIONSHALLNOT BECONSIDEREDASTHEBECONSIDEREDASTHE LIMITSOFTHEWORKLIMITSOFTHEWORK REQUIREDOFANYREQUIREDOFANY SEPARATETRADE.THETERMSAND

SEPARATETRADE.THETERMSAND CONDITIONSOFSUCHCONDITIONSOFSUCH LIMITATIONSAREWHOLLYBETWEENTHELIMITATIONSAREWHOLLYBETWEENTHE CONTRACTORANDHIS

CONTRACTORANDHIS SUBCONTRACTORSSUBCONTRACTORS.. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. 10. 10. 11. 11. A. A. B. B. C. C. D. D. E. E. F. F. G. G. A. A. B. B. C. C. A. A. B. B. C. C. AB AB ABV ABV AGG AGG BLW BLW BOF BOF BTWN BTWN CC CC CTJ CTJ CLR CLR CMU CMU CJ CJ CONT CONT CONTR CONTR CP CP CSK CSK DF DF DL DL DO DO DSA DSA DWG DWG (E) (E) EF EF EJ EJ EL EL EN EN EOS EOS EQ EQ EW EW EWEF EWEF FB FB FC FC FF FF FS FS GA GA GLB GLB HDR HDR HSB HSB HSS HSS HT HT IOR IOR JH JH LL LL LLH LLH LLV LLV LS LS LW LW MB MB MFR MFR - --- - - --- - --- - --- - --- - --- ---ANCHORBOLT ANCHORBOLT ABOVE ABOVE AGGREGATE AGGREGATE BELOW BELOW BOTTOMOFFOOTING BOTTOMOFFOOTING BETWEEN BETWEEN CENTERTOCENTER CENTERTOCENTER CONTROLJOINT CONTROLJOINT CLEAR CLEAR CONCRETEMASONRYUNIT CONCRETEMASONRYUNIT CONSTRUCTIONJOINT CONSTRUCTIONJOINT CONTINUOUS CONTINUOUS CONTRACTOR CONTRACTOR COMPLETEJOINTPENETRATION COMPLETEJOINTPENETRATION COUNTERSINK COUNTERSINK DOUGLASFIR DOUGLASFIR DEADLOAD DEADLOAD DITTO DITTO DIVISIONOFTHE DIVISIONOFTHE STATESTATE ARCHITECT ARCHITECT DRAWING DRAWING EXISTING EXISTING EACHFACE EACHFACE EXPANSIONJOINT EXPANSIONJOINT ELEVATION ELEVATION EDGENAILING EDGENAILING EDGEOFSLAB EDGEOFSLAB EQUAL EQUAL EACHWAY EACHWAY EACHWAYEACHFACE EACHWAYEACHFACE FACEOFBLOCK(ORBRICK) OR FACEOFBLOCK(ORBRICK) OR FLATBAR FLATBAR FACEOFCONCRETEOR FACEOFCONCRETEOR FRAMINGCLIP(SIMPSONA35) FRAMINGCLIP(SIMPSONA35) FINISHFLOOR FINISHFLOOR FACEOFSTU FACEOFSTUDORFARSIDEDORFARSIDE GAUGEORGAGE GAUGEORGAGE GLUEDLAMINATEDBEAM GLUEDLAMINATEDBEAM HEADER HEADER HIGHSTRENGTHBOLT HIGHSTRENGTHBOLT HOLLOW STRUCTURALSECTION HOLLOW STRUCTURALSECTION HEIGHT HEIGHT INSPECTOROFRECORD INSPECTOROFRECORD JOISTHANGER JOISTHANGER LIVELOAD LIVELOAD LONGLEGHORIZONTAL LONGLEGHORIZONTAL LONGLEGVERTICAL LONGLEGVERTICAL LAGSCREW LAGSCREW LIGHTWEIGHT LIGHTWEIGHT MACHINEBOLT MACHINEBOLT MANUFACTURER MANUFACTURER MI MI (N) (N) NIC NIC NS NS NTS NTS NW NW OH OH OSB OSB OSHPD OSHPD PC PC PP PP PT PT RWD RWD SC SC SHTG SHTG SIM SIM SMS SMS SP SP STFNR STFNR STGRD STGRD T&B T&B T&G T&G THRD THRD TN TN TO TO TOC TOC TOF TOF TOS TOS TOW TOW TS TS UNO UNO W/ W/ W/C W/C W/O W/O WP WP WS WS WWF WWF È È É É Ê Ê ## SQ SQ Ø Ø (A) (A) (B) (B) --- --- - --- - --- - --- - --- - --- - --- - ---MALLEABLEIRON MALLEABLEIRON NEW NEW NOTIN NOTIN CONTRACTCONTRACT NEARSIDE NEARSIDE NOTTOSCALE NOTTOSCALE NORMALWEIGHT NORMALWEIGHT OPPOSITEHAND OPPOSITEHAND ORIENTEDSTRANDBOARD ORIENTEDSTRANDBOARD OFFICEOFSTATEWIDE OFFICEOFSTATEWIDE HEALTHPLANNING& HEALTHPLANNING& DEVELOPMENT DEVELOPMENT PIECE PIECE PARTIALJOINTPENETRATION PARTIALJOINTPENETRATION PRESSURETREATED PRESSURETREATED REDWOOD REDWOOD SLIPCRITICAL SLIPCRITICAL SHEATHING SHEATHING SIMILAR SIMILAR SHEETMETALSCREW SHEETMETALSCREW STRUCTURALPANEL STRUCTURALPANEL STIFFENER STIFFENER STAGGERED STAGGERED TOP&BOTTOM TOP&BOTTOM TONGUE&GROOVE TONGUE&GROOVE THREADED THREADED TOENAIL TOENAIL TOPOF TOPOF TOPOFCONCRETE(SLAB TOPOFCONCRETE(SLAB UNO)UNO) TOPOFFOOTING TOPOFFOOTING OROR TOPOFFRAMING TOPOFFRAMING TOPOFSTEEL TOPOFSTEEL TOPOFWALL TOPOFWALL TUBESTEEL TUBESTEEL UNLESSNOTEDOTHERWISE UNLESSNOTEDOTHERWISE WITH WITH WATER/CEMENT WATER/CEMENT WITHOUT WITHOUT WORKPOINT WORKPOINT WOODSCREW WOODSCREW WELDEDWIREFABRIC WELDEDWIREFABRIC CENTERLINE CENTERLINE PLATE PLATE WIDEFLANGE WIDEFLANGE NUMBERORPOUNDS NUMBERORPOUNDS SQUARE SQUARE ROUND ROUND CONTWOODIN CONTWOODIN SECTIONSECTION WOODBLOCKINGIN WOODBLOCKINGIN SECTIONSECTION ENDOFWOOD ENDOFWOOD PIECEPIECE "MEMBER"ABOVE "MEMBER"ABOVE "MEMBER"BELOW "MEMBER"BELOW 100TN003-1 100TN003-1 ABBREVIATIONS ABBREVIATIONS .. SPECIALINSPECTIONSANDTESTINGSHALLBEPROVIDED

SPECIALINSPECTIONSANDTESTINGSHALLBEPROVIDED BYANINSPECTIONAGENCY,EMPLOYEDBYANINSPECTIONAGENCY,EMPLOYED BYTHEOWNER,

BYTHEOWNER, ANDQUALIFIEDBYTHEANDQUALIFIEDBYTHE BUILDINGOFFICIALTOINSPECTTHEBUILDINGOFFICIALTOINSPECTTHE PARTICULARTYPEOFPARTICULARTYPEOF CONSTRUCTION.TESTSAND

CONSTRUCTION.TESTSAND INSPECTIONS,ASREQUIREDBYSECTIONS109A,1704A,INSPECTIONS,ASREQUIREDBYSECTIONS109A,1704A, 1707AAND1707AAND 1708AOFTHE

1708AOFTHE 2007CBCW/2007CBCW/ CAAMENDMENTS,SHALLBEPERFORMEDDURINGCAAMENDMENTS,SHALLBEPERFORMEDDURING CONSTRUCTIONONCONSTRUCTIONON THETYPESOFWORK

THETYPESOFWORK LISTEDBELOW:LISTEDBELOW:

IINNSSPPEECCTTIIOONNSS TTEESSTTIINNGG S T

S TE EE EL C OL C ON SN ST RT RU CU CT IT IO NO N S ES EC TC TI OI ONN1 70 41 70 4A .A .3 & T A3 & T AB LB LE 1 7E 1 70 40 4A .A .33 S ES EC TC TI OI ON 1 7N 1 70 80 8A .A .44 S

SHHOOPP FFRRAABBRRIICCAATTIIOONN SSEECCTTIIOONN11770044AA..33..22..11 --S

STTEEEEL JL JOOI SI ST AT AN DN DJ OJ OI SI ST GT GIIR DR DEER SR S SSEEC TC TI OI ONN1 71 7004 A4 A. 3. 3. 2. 2. 2. 2 --LLIIGGHHT -T -FFRRAAMMEED SD STTEEEEL TL TRRUUSSSS SSEECCTTIIOONN11770044AA..33..22..33 --C O

C ON CN CR ER ET E CT E CO NO NS TS TR UR UC TC TI OI ONN S ES EC TC TI OI ONN1 71 70 40 4A .A .4 & T A4 & T AB LB LE 1 7E 1 70 40 4A .A .44 S ES EC TC TI OI ON 1 7N 1 70 80 8A .A .33 B

BAATTCCH PH PLLAANNT IT INNSSPPEECCTTIIOONN SSEECCTTIIOONN11770044AA..44..33 --MAS

MASONRYCONSONRYCONSTRUCTTRUCTION-LEVEL1ION-LEVEL1 SECTSECTIONION1704A1704A.5&TABLE1704.5&TABLE1704A.5.1A.5.1 TABLTABLE1708A.E1708A.1.21.2 MAS

MASONRYCONSONRYCONSTRUCTTRUCTION-LEVEL2ION-LEVEL2 SECTSECTIONION1704A1704A.5&TABLE1704.5&TABLE1704A.5.3A.5.3 TABLTABLE1708A.E1708A.1.41.4 W

WOOOODD CCOONNSSTTRRUUCCTTIIOONN SSEECCTTIIOONN11770044AA..66 --H

HIIGGH -H -LLOOAADD DDIIAAPPHHRRAAGGMM SSEECCTTIIOONN11770044AA..66..11 --S

STTRRUUCCTTUURRAAL GL GLLUU--LLAAM TM TIIMMBBEERR SSEECCTTIIOONN11770044AA..66..22..11 --O

OPPEENN WWEEBB TTRRUUSSSSEESS SSEECCTTIIOONN11770044AA..66..22..22 --T

TIIMMBBEER CR COONNNNEECCTTOORRSS SSEECCTTIIOONN11770044AA..66..22..33 --S

SOOIILLSS SSEECCTTIIOONN11770044AA..77 && TTAABBLLEE 11770044AA..77 --P

PI LI LE FE FO UO UN DN DAATTI OI ON SN S SSEEC TC TI OI ONN1 71 7004 A4 A. 8. 8& T& TAABBL EL E117 07 044AA. 8. 8 --P

PI EI ER FR FOOU NU ND AD AT IT IO NO NSS SSEEC TC TI OI ONN1 71 70 40 4AA. 9. 9& T& TAABBL EL E117 07 044A .A .99 --S

SHHOOTTCCRREETTEE SSEECCTTIIOON 1N 1 770044AA..1155 --STATEMENTOFSTRUCTURALINSPECTIONSANDTESTING STATEMENTOFSTRUCTURALINSPECTIONSANDTESTING 100TN004-1 100TN004-1 1. 1. 2.

2. INSPECTIONSMAYBECONTINUOUSORINSPECTIONSMAYBECONTINUOUSOR PERIODICASALLOWEDBYPERIODICASALLOWEDBY THEINDIVIDUALMATERIALORTHEINDIVIDUALMATERIALOR COMPONENTINSPECTIONSECTIONSANDTABLESOFSECTION1704A COMPONENTINSPECTIONSECTIONSANDTABLESOFSECTION1704A 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. 10. 10. THESPECIALINSPECTORSHALLSUBMITINSPECTIONREPORTSTO THESPECIALINSPECTORSHALLSUBMITINSPECTIONREPORTSTO THEBUILDINGOFFICIALANDTHEBUILDINGOFFICIALAND THEDESIGNPROFESSIONALINRESPONSIBLECHARGE.

THEDESIGNPROFESSIONALINRESPONSIBLECHARGE. THEREPORTSSHALLINDICATEWHETHERTHEREPORTSSHALLINDICATEWHETHER WORK

WORK INSPECTEDCONFORMEDTOTHECONSTRUCTIONINSPECTEDCONFORMEDTOTHECONSTRUCTION DOCUMENTS.ANYDISCREPANCIESDOCUMENTS.ANYDISCREPANCIES SHALLBEIMMEDIATELYBROUGHTTOTHE

SHALLBEIMMEDIATELYBROUGHTTOTHE ATTENTIONOFTHECONTRACTORATTENTIONOFTHECONTRACTOR FORCORRECTION.FORCORRECTION. IFDISCREPANCIESARENOTCORRECTED,

IFDISCREPANCIESARENOTCORRECTED, THEYSHALLBEBROUGHTTHEYSHALLBEBROUGHT TOTHEATTENTIONOFTOTHEATTENTIONOF THETHE BUILDINGOFFICALANDTHE

BUILDINGOFFICALANDTHE DESIGNPROFESSIONALINRESPONSIBLECHARGE.DESIGNPROFESSIONALINRESPONSIBLECHARGE. ALLSPECIALINSPECTIONAGENCIES/INDIVIDUALSAND

ALLSPECIALINSPECTIONAGENCIES/INDIVIDUALSAND SHOPFABRICATORSSHALLBEAPPROVEDSHOPFABRICATORSSHALLBEAPPROVED BYTHEBUILDINGOFFICIAL

BYTHEBUILDINGOFFICIAL PRIORTOCOMMENCEMENTOFWORK.PRIORTOCOMMENCEMENTOFWORK. TESTINGANDINSPECTIONRECORDSSHALLBE

TESTINGANDINSPECTIONRECORDSSHALLBE RETAINEDUNTILCOMPLETIONOFCONSTRUCTION.RETAINEDUNTILCOMPLETIONOFCONSTRUCTION. THECONTRACTORSHALLSUBMITA

THECONTRACTORSHALLSUBMITA WRITTENSTATEMENTTOTHEBUILDINGOFFICIALWRITTENSTATEMENTTOTHEBUILDINGOFFICIAL ACKNOWLEDGINGRESPONSI

ACKNOWLEDGINGRESPONSIBILITYFORCONSTRUCTIONOFBILITYFORCONSTRUCTIONOF THEMAINLATERAL-THEMAINLATERAL- FORCEFORCE RESISTINGSYSTEMPRIORTOCOMMENCEMENTOFTHATWORK RESISTINGSYSTEMPRIORTOCOMMENCEMENTOFTHATWORK ASREQUIREDBYSECTIONASREQUIREDBYSECTION 1706AOFTHE

1706AOFTHE 2007CBC.2007CBC. SPECIALINSPECTIONSFORSEISMICANDWIND

SPECIALINSPECTIONSFORSEISMICANDWIND RESISTANCESHALLBECONDUCTEDFORRESISTANCESHALLBECONDUCTEDFOR ALLALL ITEMSLISTEDINSECTION1705A.3

ITEMSLISTEDINSECTION1705A.3 AND1705A.4ASAPPLICABLE.AND1705A.4ASAPPLICABLE. STRUCTURALTESTINGFORSTRUCTURALTESTINGFOR SEISMICRESISTANCESHALLBEINACCORDANCEWITH

SEISMICRESISTANCESHALLBEINACCORDANCEWITH SECTION1708A.SECTION1708A. MASONRYCONSTRUCTIONLEVEL2APPLIESTO

MASONRYCONSTRUCTIONLEVEL2APPLIESTO STRUCTURESCLASSIFIESTRUCTURESCLASSIFIEDASDAS OCCUPANCYOCCUPANCY CATEGORYIVONLY.

CATEGORYIVONLY. ALLSOILSAND

ALLSOILSAND FOUNDATIONEXCAVATIONINSPECTIONSSHALLBEBYTHEGEOTECHNICLFOUNDATIONEXCAVATIONINSPECTIONSSHALLBEBYTHEGEOTECHNICL ENGINEEROFRECORD.

ENGINEEROFRECORD. FORTESTINGANDINSPECTIONREQUIREMENTSFOR

FORTESTINGANDINSPECTIONREQUIREMENTSFOR NON- STRUCTNON- STRUCTURALMATERIALSANDURALMATERIALSAND COMPONENTS,SEECONSTRUCTIONDOCUMENTSANDCOMPLYWITHCHAPTER COMPONENTS,SEECONSTRUCTIONDOCUMENTSANDCOMPLYWITHCHAPTER 17AOFTHE17AOFTHE 2007CBC. 2007CBC. CONCRETE CONCRETE 300SN001-1 300SN001-1 STRUCTURALCONCRETESHALLATTAIN28

STRUCTURALCONCRETESHALLATTAIN28 DAYCOMPRESSIVESTRENGTHASREQUIREDINDAYCOMPRESSIVESTRENGTHASREQUIREDIN NOTE#29.

NOTE#29. MAXIMUMSLUMPSHALLNOTEXCEED4MAXIMUMSLUMPSHALLNOTEXCEED4 INCHES.INCHES. CONCRETEMIXDESIGNSSHALLBE

CONCRETEMIXDESIGNSSHALLBE PREPAREDBYAREGISTEREDCIVILENGINEER,REVIEWEDBYPREPAREDBYAREGISTEREDCIVILENGINEER,REVIEWEDBY OWNER'STESTINGLABORATORYANDSUBMITTEDTOTHE

OWNER'STESTINGLABORATORYANDSUBMITTEDTOTHE STRUCTURALENGINEERFORREVIEW.STRUCTURALENGINEERFORREVIEW. CEMENTITIOUSMATERIALS

CEMENTITIOUSMATERIALS:: CEMENTSHALLCONFORMTO CEMENTSHALLCONFORMTO ASTMC-150TYPEIASTMC-150TYPEI ORII.ORII. FLYASHSHALLCONFORM

FLYASHSHALLCONFORM TOASTMC-618.TOASTMC-618. MAX.QUANTITYOFFLYASHSHALLBEMAX.QUANTITYOFFLYASHSHALLBE ASGIVENINASGIVENIN SPECS(15%MAXUNO).

SPECS(15%MAXUNO).

CONCRETEAGGREGATESSHALLCONFORMTOASTMC-33

CONCRETEAGGREGATESSHALLCONFORMTOASTMC-33 FORNORMALWEIGHTCONCRETEFORNORMALWEIGHTCONCRETE ANDASTMC-330

ANDASTMC-330 FORLIGHTWEIGHTCONCRETE.FORLIGHTWEIGHTCONCRETE. NON-SHRINKGROUTOR

NON-SHRINKGROUTOR DRYPACKSHALLCONSISTOFADRYPACKSHALLCONSISTOFA PREMIXEDNONMETALLICFORMULA.PREMIXEDNONMETALLICFORMULA. REINFORCINGSTEELSHALLCONFORMTO

REINFORCINGSTEELSHALLCONFORMTO ASTMA-615GRADE60ASTMA-615GRADE60 FOR#4FOR#4 ANDLARGER,ANDANDLARGER,AND ASTMA-615GRADE40

ASTMA-615GRADE40 FOR#3FOR#3 ANDSMALLER,EXCEPTREINFORCINGSTEELTOANDSMALLER,EXCEPTREINFORCINGSTEELTO BEWELDEDBEWELDED SHALLCONFORMTO

SHALLCONFORMTO ASTMA-706.CONTRACTORSHALLSUBMITREBARMILLASTMA-706.CONTRACTORSHALLSUBMITREBARMILL CERTIFICATESCERTIFICATES.. ALLPREHEATINGANDWELDINGOF

ALLPREHEATINGANDWELDINGOF REINFORCINGBARSSHALLBEDONEREINFORCINGBARSSHALLBEDONE INACCORDANCEWITHINACCORDANCEWITH AWSD1.4LATESTEDITION

AWSD1.4LATESTEDITION ANDSHALLBEANDSHALLBE CONTINUOUSLYINSPECTEDBYAQUALIFIEDCONTINUOUSLYINSPECTEDBYAQUALIFIED LABORATORY.CONTRACTORSHALLFURNISH

LABORATORY.CONTRACTORSHALLFURNISH WPSFORALLWPSFORALL REBARWELDINGTOTHEREBARWELDINGTOTHE LABORATORY.LABORATORY. REINFORCINGSTEELSHALLBEFABRICATEDACCORDINGTO

REINFORCINGSTEELSHALLBEFABRICATEDACCORDINGTO "MANUALOFSTANDARDPRACTICE"MANUALOFSTANDARDPRACTICE FORREINFORCEDCONCRETECONSTRUCTION".

FORREINFORCEDCONCRETECONSTRUCTION". WIREFABRICSHALLCONFORM WIREFABRICSHALLCONFORM TOASTMA-185.TOASTMA-185. DIMENSIONSSHOWNFORLOCATION

DIMENSIONSSHOWNFORLOCATION OFREINFORCINGARETOOFREINFORCINGARETO THEFACEOFTHEFACEOF BARSLISTEDANDBARSLISTEDAND DENOTECLEARCOVERAGE.NON-PRESTRESSE DENOTECLEARCOVERAGE.NON-PRESTRESSED,CAST-IN-PLACECONCRETECOVERAGESHALLD,CAST-IN-PLACECONCRETECOVERAGESHALL BEASFOLLOWS,UNO: BEASFOLLOWS,UNO: CONCRETEDEPOSITEDDIRECTLYAGAINSTGROUND(EXCEPTSLABS)--- 3" CONCRETEDEPOSITEDDIRECTLYAGAINSTGROUND(EXCEPTSLABS)--- 3" CONCRETEEXPOSEDTOGROUNDOR

CONCRETEEXPOSEDTOGROUNDOR WEATHERBUTPLACEDINWEATHERBUTPLACEDIN FORMS:FORMS:

BEAMS&COLUMNS(TIES)---BEAMS&COLUMNS(TIES)--- --- 1-1/2"1-1/2" BEAMS&COLUMNS(MAINREINFORCING)---2" BEAMS&COLUMNS(MAINREINFORCING)---2" CAST-IN-PLA

CAST-IN-PLACEWALLS(EXTERIORFACE&CEWALLS(EXTERIORFACE& SOILSIDE)---SEEABOVESOILSIDE)---SEEABOVE CAST-IN-PLA

CAST-IN-PLACEWALLS(INTERIORFACE-#11&CEWALLS(INTERIORFACE-#11& SMALLER)---SMALLER)---3/4"----3/4"

TILT-UPWALLS---TILT-UPWALLS---SEEDETAILS---SEEDETAILS SLABS(ONFORMS)---SLABS(ONFORMS)---3/4"---3/4" SLABS(ONGROUND)---SLABS(ONGROUND)---2"--2" CLEARFROMTOPUNOCLEARFROMTOPUNO SPLICESINCONTINUOUSREINFORCEMENTSHALLBE

SPLICESINCONTINUOUSREINFORCEMENTSHALLBE LAPPEDUNO,SEESCHEDULETHISLAPPEDUNO,SEESCHEDULETHIS SHEET.SHEET. SPLICESINADJACENTBARSSHALL

SPLICESINADJACENTBARSSHALL BEGREATERTHAN5'-0"BEGREATERTHAN5'-0" APART.SPLICECONTINUOUSBARSINAPART.SPLICECONTINUOUSBARSIN SOIL-BEARINGGRADEBEAMS,STRUCTURALSLABSONGRADEAND SOIL-BEARINGGRADEBEAMS,STRUCTURALSLABSONGRADEAND MATFOUNDATIONSASMATFOUNDATIONSAS FOLLOWSUNO:TOP

FOLLOWSUNO:TOP BARSATCENTERLINEOFBARSATCENTERLINEOF SUPPORT;BOTTOMBARSATMID-SPAN.SUPPORT;BOTTOMBARSATMID-SPAN. SPLICESPLICE CONTINUOUSBARSIN

CONTINUOUSBARSIN ELEVATEELEVATEDSLABSANDDSLABSAND BEAMS,ETC.ASFOLLOWSUNO:BEAMS,ETC.ASFOLLOWSUNO: TOPBARSATMID- TOPBARSATMID-SPAN;BOTTOMBARSATCENTERLINEOF

SPAN;BOTTOMBARSATCENTERLINEOF SUPPORT.ALLSUPPORT.ALL BARSSIZE#14ANDBARSSIZE#14AND LARGERSHALLBELARGERSHALLBE CONTINUOUSFORFULL

CONTINUOUSFORFULL LENGTHSHOWNORLENGTHSHOWNOR SPLICEDWITHMECHANICALCOUPLERSASNOTEDSPLICEDWITHMECHANICALCOUPLERSASNOTED INDETAILS.SPLICESIN

INDETAILS.SPLICESIN WWFSHALLBEWWFSHALLBE 1-1/2MESHESWIDE.1-1/2MESHESWIDE. THEMINIMUMCLEAR

THEMINIMUMCLEAR SPACINGBETWEENPARALLELBARSINASPACINGBETWEENPARALLELBARSINA LAYERSHALLNOTBELAYERSHALLNOTBE LESSLESS THANTHELARGER

THANTHELARGER OFBARDIAMETER,1",OFBARDIAMETER,1", OR33%GREATEROR33%GREATER THANTHEMAXIMUMAGGREGATETHANTHEMAXIMUMAGGREGATE SIZE(NOMINAL),WHICHEVERISGREATEST.

SIZE(NOMINAL),WHICHEVERISGREATEST. THISREQUIREMENTALSOAPPLIESTOTHETHISREQUIREMENTALSOAPPLIESTOTHE CLEARCLEAR SPACINGBETWEENDIFFERENTLAYERSOFPARALLELBARSANDTO SPACINGBETWEENDIFFERENTLAYERSOFPARALLELBARSANDTO THECLEARDISTANCETHECLEARDISTANCE BETWEENACONTACTLAPSPLICE

BETWEENACONTACTLAPSPLICE ANDADJACENTSPLICESORANDADJACENTSPLICESOR BARS.BARS. ALLHOOKSSHALLBE

ALLHOOKSSHALLBE STANDARDHOOKSUNLESSOTHERWISESHOWNORSTANDARDHOOKSUNLESSOTHERWISESHOWNOR NOTED.ATWALLS,NOTED.ATWALLS, PROVIDEHOOKSATENDS

PROVIDEHOOKSATENDS OFALLREINFORCINGOFALLREINFORCING ATENDS,CORNERSATENDS,CORNERS ANDINTERSECTIONS,UNO.ANDINTERSECTIONS,UNO. CONSTRUCTIONJOINTSSHALLBE

CONSTRUCTIONJOINTSSHALLBE MADEROUGHANDMADEROUGHAND ALLLAITANCEREMOVEDFROMTHEALLLAITANCEREMOVEDFROMTHE SURFACE.CONCRETEMAY

SURFACE.CONCRETEMAY BEROUGHENEDBYCHIPPINGBEROUGHENEDBYCHIPPING THEENTIRESURFACE,SANDTHEENTIRESURFACE,SAND BLASTING,ORRAKINGTHE

BLASTING,ORRAKINGTHE SURFACETOPROVIDE1/4"SURFACETOPROVIDE1/4" DEEPDEFORMATIONS.DEEPDEFORMATIONS. REMOVEALLDEBRISFROM

REMOVEALLDEBRISFROM FORMSBEFORECASTINGANYCONCRETE.FORMSBEFORECASTINGANYCONCRETE. REINFORCING,DOWELS,BOLTS,ANCHORS,SLEEVES,ETC.TO

REINFORCING,DOWELS,BOLTS,ANCHORS,SLEEVES,ETC.TO BEEMBEDDEDINCONCRETEBEEMBEDDEDINCONCRETE SHALLBESECURELYPOSITIONEDBEFOREPLACINGCONCRETE. SHALLBESECURELYPOSITIONEDBEFOREPLACINGCONCRETE. ANCHORBOLTS(AB'S)CASTIN

ANCHORBOLTS(AB'S)CASTIN CONCRETEORMASONRYFORCONCRETEORMASONRYFOR WALLSILLANDWALLSILLAND LEDGERLEDGER \APPLICATIONSSHALLBEHEADEDBOLTSWITHCUT

\APPLICATIONSSHALLBEHEADEDBOLTSWITHCUT THREADSCONFORMINGTOASTMA307,THREADSCONFORMINGTOASTMA307, UNO.

UNO. REFERTO"WOOD"REFERTO"WOOD" NOTESFORADDITIONALREQUIREMENTSFORBOLTSINNOTESFORADDITIONALREQUIREMENTSFORBOLTSIN CONTACTCONTACT WITHPRESSURETREATEDORFIRE

WITHPRESSURETREATEDORFIRE RETARDANTMATERIAL.REFERTORETARDANTMATERIAL.REFERTO 'STRUCTURALSTEEL''STRUCTURALSTEEL' NOTEFOR

NOTEFOR REQUIREMENTSFORANCHORRODSREQUIREMENTSFORANCHORRODS (AR'S)CASTINCONCRETE(AR'S)CASTINCONCRETE FORCOLUMNFORCOLUMN BASEPLATEANDSTEELEMBEDAPPLICATIONS.

BASEPLATEANDSTEELEMBEDAPPLICATIONS. WALLSSHALLBECAST

WALLSSHALLBECAST INHORIZONTALLAYERSOFINHORIZONTALLAYERSOF 2'-0"MAXIMUMDEPTH.2'-0"MAXIMUMDEPTH. CONCRETEINWALLS,

CONCRETEINWALLS, PIERSORCOLUMNSSHALLPIERSORCOLUMNSSHALL SETATLEAST2SETATLEAST2 HOURSBEFOREPLACINGHOURSBEFOREPLACING CONCRETEINBEAMS,SPANDRELS,OR

CONCRETEINBEAMS,SPANDRELS,OR SLABSSUPPORTEDTHEREON.SLABSSUPPORTEDTHEREON. HORIZONTALWALLBARSIN

HORIZONTALWALLBARSIN MULTI-CURTAINCASTINPLACEWALLSMULTI-CURTAINCASTINPLACEWALLS SHALLBESTAGGERED.SHALLBESTAGGERED. DOWELALLVERTICALREINFORCINGIN

DOWELALLVERTICALREINFORCINGIN WALLSANDCOLUMNSFROMWALLSANDCOLUMNSFROM FOUNDATIONWITHSAMEFOUNDATIONWITHSAME SIZEBAR.

SIZEBAR.

CONSOLIDATECONCRETEPLACEDINFORMS

CONSOLIDATECONCRETEPLACEDINFORMS BYMECHANICALVIBRATINGEQUIPMENTBYMECHANICALVIBRATINGEQUIPMENT SUPPLEMENT

SUPPLEMENTEDBYHAND-SPADING,RODDINGEDBYHAND-SPADING,RODDING ORTAMPING.ORTAMPING. USEEQUIPMENTANDUSEEQUIPMENTAND PROCEDURESFORCONSOLIDATIONOFCONCRETEIN

PROCEDURESFORCONSOLIDATIONOFCONCRETEIN ACCORDANCEWITHTHERECOMMENDEDACCORDANCEWITHTHERECOMMENDED PRACTICESOFACI309

PRACTICESOFACI309 TOSUITTHETOSUITTHE TYPEOFCONCRETEANDTYPEOFCONCRETEAND PROJECTCONDITIONS.PROJECTCONDITIONS. CONCRETESHALLNOTBE

CONCRETESHALLNOTBE DROPPEDTHROUGHREINFORCINGSTEEL(ASDROPPEDTHROUGHREINFORCINGSTEEL(AS INWALLS) INWALLS) SOASTOSOASTO CAUSESEGREGATIONOFAGGREGATES.IN

CAUSESEGREGATIONOFAGGREGATES.IN SUCHCASESHOPPERSANDSUCHCASESHOPPERSAND CHUTESORTRUNKSCHUTESORTRUNKS OFVARIABLELENGTHSSHALLBE

OFVARIABLELENGTHSSHALLBE USEDSOTHATUSEDSOTHAT THEFREEUNCONFINEDFALLTHEFREEUNCONFINEDFALL OFCONCRETEOFCONCRETE SHALLNOTEXCEED6

SHALLNOTEXCEED6 FEET.FEET. DRILLTHROUGH

DRILLTHROUGH STEELCOLUMNS,BEAMSANDPLATESTOPASSSTEELCOLUMNS,BEAMSANDPLATESTOPASS CONTINUOUSREINFORCING.CONTINUOUSREINFORCING. NOWOOD

NOWOOD SPREADERSALLOWED.NOWOODSPREADERSALLOWED.NOWOOD STAKESALLOWEDINAREASTOBESTAKESALLOWEDINAREASTOBE CONCRETED.CONCRETED. ADDITIONALREINFORCINGINPRECASTOR

ADDITIONALREINFORCINGINPRECASTOR TILT-UPPANELSREQUIREDFORLIFTINGTILT-UPPANELSREQUIREDFORLIFTING STRESSESSTRESSES SHALLBESUPPLIEDBYCONTRACTOR.

SHALLBESUPPLIEDBYCONTRACTOR. PROVIDE#5X

PROVIDE#5X 4'-0"DIAGONALREINFORCINGAT4'-0"DIAGONALREINFORCINGAT TOPANDBOTTOMTOPANDBOTTOM OFSLABATOFSLABAT ALLRE-ENTRANTALLRE-ENTRANT CORNERSTYPICAL.THISAPPLIESTOSLAB

CORNERSTYPICAL.THISAPPLIESTOSLAB ONGRADE,CONCRETEONGRADE,CONCRETE OVERMETALDECK,ANDOVERMETALDECK,AND ELEVATEDSTRUCTURALSLABCONDITIONS.

ELEVATEDSTRUCTURALSLABCONDITIONS. ALLSAW

ALLSAW CUTTINGSHALLBEDONECUTTINGSHALLBEDONE AFTERINITIALSETHASOCCURREDAFTERINITIALSETHASOCCURRED TOAVOIDTEARINGORTOAVOIDTEARINGOR DAMAGEBYTHESAW BLA

DAMAGEBYTHESAW BLADE,BUTBEFOREINITIALDE,BUTBEFOREINITIAL SHRINKAGEHASOCCURRED.SHRINKAGEHASOCCURRED. NOTIFYSTRUCTURALENGINEERAMINIMUM

NOTIFYSTRUCTURALENGINEERAMINIMUM OF48OF48 HOURSBEFOREPLACINGANYCONCRETE.HOURSBEFOREPLACINGANYCONCRETE. CONCRE

CONCRETESTRENTESTRENGTHS&MIXPROGTHS&MIXPROPERTPERTIES: IES: MAXAGGMAXAGGR.R. 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. 7. 7. 8. 8. 9. 9. 10. 10. 11. 11. 12. 12. 13. 13. 14. 14. 15. 15. 26. 26. 27. 27. 28. 28. 29. 29. 21. 21. 22. 22. 23. 23. 24. 24. 25. 25. 16. 16. 17. 17. 18. 18. 19. 19. 20. 20. ITEM ITEM A.FOUNDATIONS A.FOUNDATIONS B.SLABONGRAD B.SLABONGRADEE F'CAT28DAYS F'CAT28DAYS 4000PSI 4000PSI 3500PSI 3500PSI SIZE SIZE 1-1/2" 1-1/2" 1" 1" WEIGHT WEIGHT NW NW NW NW RATIO RATIO 0.52 0.52 0.45 0.45 MAXW/CM* MAXW/CM* SPLICE SPLICE C L A C L AS SS S L O CL O CA T IREINFREINFA T IO NO N #3#3 OTHER OTHER TOP TOP B B 15 15 19 19 NOTES: NOTES: 2. 2. 3. 3. ##44 ##55 ##66 ##77 ##88 ##99 ##1100 ##1111 37 37 29 29 47 47 36 36 56 56 43 43 81 81 63 63 93 93 72 72 105 105 81 81 118 118 91 91 131 131 101 101 OTHER OTHER TOP TOP 13 13 17 17 25 25 32 32 SPLICE SPLICE LOCATION LOCATION CLASS

CLASS REINFREINF ##33 ##44 54 54 70 70 37 37 48 48 31 31 40 40 62 62 80 80 70 70 91 91 79 79 102 102 87 87 113 113 #7 #7 #6 #6 ##55 ##88 ##99 ##1100 ##1111 ACI318-05 ACI318-05 2006IBC 2006IBC 2007CBC 2007CBC (ALLLENGTHSSHOWNARE

(ALLLENGTHSSHOWNARE ININCHES.)ININCHES.)

TOPREINFORCEMENTISHORIZONTALREINFORCEMENTLOCATEDSUCHTHAT TOPREINFORCEMENTISHORIZONTALREINFORCEMENTLOCATEDSUCHTHAT MORETHANMORETHAN 12INCHESOF

12INCHESOF FRESHCONCRETEISCASTFRESHCONCRETEISCAST INTHEINTHE MEMBERBELOW MEMBERBELOW THESPLICE.THESPLICE. WHENLIGHTWEIGHTCONCRETEISUSED,

WHENLIGHTWEIGHTCONCRETEISUSED, MULTIPLYLAPLENGTHSBY1.30.MULTIPLYLAPLENGTHSBY1.30. WHERECLEARSPACINGOF

WHERECLEARSPACINGOF BARSBEINGSPLICEDISBARSBEINGSPLICEDIS LESSTHAN2LESSTHAN2 BARDIA.ORBARDIA.OR WHERECLEARCOVEROF

WHERECLEARCOVEROF BARSBEINGSPLICEDISLESSBARSBEINGSPLICEDISLESS THAN1THAN1 BARDIA.,BARDIA., MULTIPLYLAPLENGTHSBY1.50,

MULTIPLYLAPLENGTHSBY1.50, UNO.UNO. 4.

4.

SCHEDULEAPPLIESTONORMALWEIGHTCONCRETEWITH

SCHEDULEAPPLIESTONORMALWEIGHTCONCRETEWITH UNCOATED,GRADE60REINFORCINGUNCOATED,GRADE60REINFORCING STEELFOR#4

STEELFOR#4 BARSANDLARGER(VALUESFORBARSANDLARGER(VALUESFOR #3BARSBASEDON#3BARSBASEDON GRADE40).GRADE40). 1.

1.

WHERENOTES#3

WHERENOTES#3 AND#4AND#4 OCCUR,MULTIPLYLAPLENGTHSBYOCCUR,MULTIPLYLAPLENGTHSBY 2.00,UNO.2.00,UNO. 5.

5. WHERECLASSALAP

WHERECLASSALAP SPLICEISNOTEDINSPLICEISNOTEDIN DETAIL,DIVIDELENGTHSABOVEBY1.30.DETAIL,DIVIDELENGTHSABOVEBY1.30. 6. 6. B B B B #11 #11 #10 #10 #9 #9 #8 #8 ##55 ##66 ##77 121 121 93 93 109 109 84 84 97 97 75 75 86 86 66 66 43 43 33 33 52 52 40 40 75 75 58 58 #4 #4 #3 #3 REINF REINF C L A C L AS SS S L O CL O CA T IA T IO NO N SPLICE SPLICE 35 35 27 27 18 18 14 14 TOP TOP OTHER OTHER B B #11 #11 #10 #10 #9 #9 #8 #8 ##55 ##66 ##77 #4 #4 REINF REINF C L A C L AS SS S L O CL O CA T IA T IO NO N SPLICE SPLICE TOP TOP O OTTHHEERR 2222 29 29 49 49 63 63 33 33 43 43 28 28 36 36 55 55 72 72 63 63 81 81 70 70 91 91 78 78 101 101 #3 #3 15 15 12 12 FC' FC' =3000=3000 PSICONCPSICONC FC' FC' =4000=4000 PSICONCPSICONC REINFORCEMENTLAPSPLICESCHEDULE REINFORCEMENTLAPSPLICESCHEDULE FC' FC' =3500=3500 PSICONCPSICONC FC' FC' =5000=5000 PSICONCPSICONC 300SN002-1 300SN002-1 SS S     S    T   T   A   A   T   T   E  E   O O F F  CC AA LL II FFOO RRNN II

AA STRUCTURAL STRUCTURAL          R          R EE  F F  O O   R   R   P   P    D    D     E     E     R     R      E      E       T       T        S        S       I       I          G          G        E        E S S  I I N  N   E     E    N    N    G     G      I          I         N       N        E         E        E          E          R          R          O O A  A  L  L  

KEY PLAN

KEY PLAN

AREAOFWORK AREAOFWORK E     E     T     T        E    E C-26566 C-26566 RENEWAL RENEWAL O   O   S      S     T    T     T     T     A    A       C    C         I         I        L        L E    E    T       T           A     A       I       I     N     N C      C         R    R DATE DATE F  F CCAA IILLFF  O  O   E   E   S   S    N    N D D AAR R C  C  H   H   I    I     H     H     I       I       C    C    U    U    M M AA A A   Y   Y    N    N     E     E     K     K 02-28-2013 02-28-2013

National Facilities Services

National Facilities Services

Post Office Box 12916

Post Office Box 12916

Oakland, California 94604

Oakland, California 94604

1/16"= 1/16"= 1'-0"1'-0" GRAPHICSCALES: GRAPHICSCALES: 5' 5' 00 5500'' 00 55'' 11//88"" == 11''--00"" 11//44"" == 11''--00"" 2255'' 00 11'' 1122'' 1/2"=1'-0" 1/2"=1'-0" 00 11'' 66'' 00 1"=1'-0" 1"=1'-0" 3/4"=1'-0" 3/4"=1'-0" 44'' 00 11'' 11/2"=1'-0" 11/2"=1'-0" 00 33'' 22'' 00 AREDUCEDPRINT AREDUCEDPRINT SCALEACCORDINGLYSCALEACCORDINGLY IFTHISSHE

IFTHISSHEETISNOT30"x42ETISNOT30"x42",IT",IT ISIS 3"=1'-0" 3"=1'-0" 1' 1' Revisions Revisions F a F ac . Nc . No .o .:: B lB ld gd g. N o. N o. :. : KPProj.No.: KPProj.No.: PermitNo.: PermitNo.: F l F lo oo or L er L ev :v : S eS ec tc ti oi on :n : HYArchitects Projectnumber: HYArchitects Projectnumber: Facility Facility Project Project SheetTitle SheetTitle

This documentis thepropertyof theOwnerandis not This documentis thepropertyof theOwnerandis not tobe used withouthis writtenpermissiontobe used withouthis writtenpermission Architect/

Architect/ EngineerOf EngineerOf Record:__________________________________Record:__________________________________ _______________ _______________ 

Scale: Scale: BRIAN BRIAN REIL REIL Exp.3/31/13 Exp.3/31/13No.4337No.4337

1: 1: 11    M    M    C    C  :  :    \    \    U    U  s  s  e  e  r  r  s  s    \    \    K    K  e  e  v  v    i    i  n  n    S    S    C    C    \    \    D    D  e  e   s   s    k    k    t    t  o  o  p  p    \    \    R    R  e  e  v  v    i    i    t    t    \    \    R    R    S    S    T    T    2    2    0    0    1    1    1    1    \    \    S    S    1    1    1    1  -   -   0    0    6    6    6    6__    K    K  a  a    i    i  s  s  e  e  r  r    M    M  o  o   r   r   s   s   e   e    C    C    U    U    P    P  r  r  v  v . .    t    t 161-994 161-994

NEW CENTRAL UTILITY PLANT

NEW CENTRAL UTILITY PLANT

BUILDING

BUILDING

GENERAL NOTES

GENERAL NOTES

SACRAMENTO MEDICAL CENTER

SACRAMENTO MEDICAL CENTER

2025 MORSE AVENUE

2025 MORSE AVENUE

SACRAMENTO, CA 95825

SACRAMENTO, CA 95825

CN21 CN21 3473 3473

APPLICABLE TO ALL DRAWINGS UNLESS NOTED OR SHOWN OTHERWISE APPLICABLE TO ALL DRAWINGS UNLESS NOTED OR SHOWN OTHERWISE

GENERAL NOTES

GENERAL NOTES

S1.01 S1.01 A A N

Noo.. RReevviissiioonnss BByy DDaattee AApppprr.. 11 OOSSHHPPD SD SUUBBMMIITTTTAALL 99//2299//1111

(2)
(3)
(4)
(5)
(6)

References

Related documents

Dinamika konflik keagamaan acapkali melibatkan pemeluk agama dalam jumlah besar cendrung (Konflik Komunal) mempunyai dampak sosial politik lebih luas dan

daily press review, daily news summary, daily news digest, media alerts, thematic media review, weekly previews and daily social media summaries deliverable on working days

• The design should follow the overall European Athletics design using the typography, colour, wireframe and/or pattern. • The event logo must be placed on all invitations

On the other hand, Recently, we have demonstrated that three cases of LPG electron microscopy shows that intraglomerular lipoprotein have a novel apolipoprotein E (apoE)

MISSION (to support the vision) of the EUNDB is to inform and support the regulatory networks implementation of data standards in a coordinated manner to optimise the value of

Human Resources &amp; Affirmative Action Southwest Tennessee Community College 737 Union Ave Memphis, TN 38103 Phone: (901) 333-5828 [email protected] President-Elect

Based on the background, the author aimed to determine the relationship between nurse knowledge and nurse attitudes with the implementation of the Patient Safety

The first thing to do, then, in considering the relief of any mental or physical condition is to analyze your mental self over a period of time preceding