FOUNDATION CALCULATION SHEET
FOUNDATION CALCULATION SHEET
One-Stop Solution for Foundation
One-Stop Solution for Foundation
T
TIIT
TL
LE
E
D
DE
ES
SC
CR
RIIP
PT
TIIO
ON
N
P
PR
RO
OJ
JE
EC
CT
T//J
JO
OB
B N
NO
O..
P
Pa
an
niitth
hii
P
PR
RO
OJ
JE
EC
CT
T//J
JO
OB
B N
NA
AM
ME
E
A
AC
CII
C
CL
LIIE
EN
NT
T
N
NA
AM
ME
E
M
MK
KS
S
S
SIIT
TE
E
N
NA
AM
ME
E
5
5--6
6
DOCUMENT
DOCUMENT NO.
NO.
REFERENCE
REFERENCE NO.
NO.
S
ST
TR
RU
UC
CT
TU
UR
RE
E
N
NA
AM
ME
E
F
F--4
45
50
0
LOAD
LOAD COMBINATION
COMBINATION GROUP
GROUP
R
RE
EV
V
D
DA
AT
TE
E
D
DE
ES
SC
CR
RIIP
PT
TIIO
ON
N
P
PR
RE
EP
P''D
D
C
CH
HK
K''D
D
A
AP
PP
PR
R''D
D
A
AP
PP
PR
R''D
D
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
Page 1 Page 1
Calculation Sheet
Calculation Sheet
of
of
Foundation
Foundation
Project Na. : ACI Project Na. : ACI Project No. : Panithi Project No. : Panithi Client : MKS
Client : MKS
FOUNDATION LISTS
FOUNDATION LISTS
G
Grro
ou
up
p
N
Na
am
me
e
N
No
o..
D
De
es
sc
crriip
pttiio
on
n
N
No
o..
D
De
es
sc
crriip
pttiio
on
n
IISSOO--11 11 FF11 4/5/2555
4/5/2555
Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
Page 2
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
4/5/2555
Page 3
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
1. GENERAL
1.1 CODE & STANDARD
Items
Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02] Hori zontal Forc e for Seis mi c A ME RICA N S OCIETY CIVIL ENGINEE RS [AS CE 7- 02] Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
1.2 MATERIALS & UNIT WEIGHT
Items
Value
Concrete (f'c : compressive strength) Lean Concrete (Lf'c : compressive strength)
Rs (Soil unit weight) Rc (Concrete unit weight) Es (Steel Modulus of Elasticity) Ec (Concrete Modulus of Elasticity)
- Pile Capacity
Items
Value
PileName PHCPile-50
FootingList F1 Diameter 500mm Length 21m Thick 20mm Shape Circle Capacity ( Ha , Ua , Va ) 2 , 10 , 50 tonf
1.3 SUBSOIL CONDITION & SAFETY FACTORS
Items
Description
Allowable Increase of Soil (Wind) 0 % Allowable Increase of Soil (Seismic) 0 % Allowable Increase of Soil (Test) 0 % Allowable Increase of Pile Horizontal (Wind) 0 % Allowable Increase of Pile Horizontal (Seismic) 0 % Allowable Increase of Pile Horizontal (Test) 0 % Allowable Increase of Pile Vertical (Wind) 0 % Allowable Increase of Pile Vertical (Seismic) 0 % Allowable Increase of Pile Vertical (Test) 0 % Allowable Increase of Pile Uplift (Wind) 0 % Allowable Increase of Pile Uplift (Seismic) 0 % Allowable Increase of Pile Uplift (Test) 0 % 4/5/2555
Copyright (c) GS E&C. All Rights Reserved Reinforcement (D9 ~ D16 , yield strength) Reinforcement (D19 ~ , yield strength)
173.000 kgf/cm2 0.000 kgf/cm2 3000.000 kgf/cm2 3000.000 kgf/cm2 2.000 ton/m3 2.400 ton/m3 2.000 106 kgf/cm2 250998.000 kgf/cm2
Page 4
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
Safety factor against overturning for OVM1(FO1) 2 Safety factor against overturning for OVM2(FO2) 2 Safety factor against overturning for OVM3(FO3) 2 Safety factor against overturning for OVM4(FO4) 2 Safety factor against sliding for the SL1(FS1) 1.5 Safety factor against sliding for the SL2(FS2) 1.5 Safety factor against sliding for the SL3(FS3) 1.5 Safety factor against sliding for the SL4(FS4) 1.5 .35
1.4 LOAD COMBINATION
Index
Load Case Name
Load Case Description
1 DL DEADLOAD
2 LL LIVELOAD
Comb . ID
Load Combination for stability
1 1.0 SW + 1.0 DL + 1.0 LL
2 1.0 SW + .75 DL + .75 LL + .75 WL
Comb . ID
Load Combination for Reinforcement
101 1.4 SW + 1.4 DL + 1.7 LL
102 1.05 SW + 1.05 DL + 1.275 LL + 1.275 WL 4/5/2555
Copyright (c) GS E&C. All Rights Reserved Friction factor ( )
2. DRAWING REFERENCE DWGS
NO. DWG NO. DWG TITLE
N O T E S
* OUTPUT UNIT : mm
ACI PROJECT
FOUNDATION LOCATION PLAN F-450 S Q U A D C H E C K
PRO CE SS PI PIN G VE SS EL S S TRUC T. EL EC. I NS T.
SCALE AS SHOWN JOB NO. Panithi MICROFILM NO. F1 1 A01 01 Z X Y 4/5/2555 Page 5
Copyright (c) GS E&C. All Rights Reserved
OUTPUT UNIT : mm
4/5/2555 Page 6
OUTPUT UNIT : mm
4/5/2555 Page 6
Copyright (c) GS E&C. All Rights Reserved
REFERENCE DWGS
NO. DWG NO. DWG TITLE
N O T E S
* PILE
4-??500 PHC Pile-50 * OUTPUT UNIT : mm
ACI PROJECT
FOUNDATION DETAIL FOR F1 S Q U A D C H E C K
PRO CE SS PI PIN G VE SS EL S S TRUC T. EL EC. I NS T.
SCALE
AS SHOWN
JOB NO.
Panithi
MICROFILM NO. REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD
500 300 1200 500 5 0 0 1 5 0 0 5 0 0 1250 1 2 5 0 2500 2 5 0 0 15-D20 1 5 - D 2 0 5 0 T Y P . L C FOOTING
FOUNDATION PLAN FOOTING REINF. PLAN
LEAN CONC. 50 THK 2 5 G R . 1 0 0 0 9 0 0 TOG EL. + 1000 1 5 0 7 5 1 0 0 D 1 2 @ 2 0 0 1 0 0 D19 SECTION 50 TYP. D12 36-D19 300 4 0 0 PEDESTAL 4/5/2555 Page 7
REFERENCE DWGS
NO. DWG NO. DWG TITLE
N O T E S
* PILE
4-??500 PHC Pile-50 * OUTPUT UNIT : mm
ACI PROJECT
FOUNDATION DETAIL FOR F1 S Q U A D C H E C K
PRO CE SS PI PIN G VE SS EL S S TRUC T. EL EC. I NS T.
SCALE
AS SHOWN
JOB NO.
Panithi
MICROFILM NO. REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD
500 300 1200 500 5 0 0 1 5 0 0 5 0 0 1250 1 2 5 0 2500 2 5 0 0 15-D20 1 5 - D 2 0 5 0 T Y P . L C FOOTING
FOUNDATION PLAN FOOTING REINF. PLAN
LEAN CONC. 50 THK 2 5 G R . 1 0 0 0 9 0 0 TOG EL. + 1000 1 5 0 7 5 1 0 0 D 1 2 @ 2 0 0 1 0 0 D19 SECTION 50 TYP. D12 36-D19 300 4 0 0 PEDESTAL 4/5/2555 Page 7
Copyright (c) GS E&C. All Rights Reserved
Page 8
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
300 400 2500 2 5 0 0
The Origin coordinate 9 0 0 1 0 0 0 ( mm )
Ft.
Name
F1
Ft. Type Area Ft. Thickness 900.00 mm Ft. Volume Ft. Weight 13.500 tonf Soil Height 0.00 mm Soil VolumeSoil Weight 0.000 tonf Buoyancy Not Consider Self Weight (except Pr.SW) 13.500 tonf 4/5/2555
ISO 6.250 m2
5.625 m3
Page 8
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
300 400 2500 2 5 0 0
The Origin coordinate
The Center of Gravity (0,0) mm The Center of Pile (75,0) mm
9 0 0 1 0 0 0 ( mm )
Ft.
Name
F1
Ft. Type Area Ft. Thickness 900.00 mm Ft. Volume Ft. Weight 13.500 tonf Soil Height 0.00 mm Soil VolumeSoil Weight 0.000 tonf Buoyancy Not Consider Self Weight (except Pr.SW) 13.500 tonf
Section Data
( mm )
Ft.Name
Direction
Ft. Volume
Soil Volume
Pier Wt
F1 All DirectSec.Name
Section Area
Ft. Weight
Soil Weight
Total Weight
S1
3.2 PIER DATA
Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft.Name
Pr.Name
Shape
Pl
Pw
Ph
Area
Weight
Off
X
Off
Y
F1 1 Rectangle 300.000 400.000 1000.000 0.288 0.000 0.000
3.3 LOAD CASE
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based on the right hand rule.
Fx Fy Fz Mx My Mz 4/5/2555
Copyright (c) GS E&C. All Rights Reserved
ISO 6.250 m2 5.625 m3 0.000 m3 6.250 m2 5.625 m3 13.500 tonf 0.000 m3 0.000 tonf 0.288 tonf 13.788 tonf 0.120
Page 9
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
Index
Load Case Name
Load Case Description
1 DL DEADLOAD
2 LL LIVELOAD
Unit( tonf , tonf-m )
Ft.Name
Pr.Name
Load
Case
Fx
Fy
Fz
Mx
My
F1 1 1 0 0 -70 0 0 2 0 0 -90 0 0 Footing SW 0.000 0.000 -13.500 0.000 0.000
3.4 LOAD COMBINATION
In Pier Topwithout Self Weight
In Footing Bottom with Pier Self Weight,
But without Footing Self Weight,
In Footing Bottom Center
with Pier & Footing Self Weight & Soil Weight, Case PileType
in centroid of Pile Group Case NonPileType
in centroid of Footing
3.4.1 Load Combination in Pier Top (Without SW)
Unit( tonf , tonf-m )
Ft.Name
Pr.Name L.Comb.
1
1 0.000 0.000 -160.000 0.000 0.000
2 0.000 0.000 -120.000 0.000 0.000
101 0.000 0.000 -251.000 0.000 0.000
102 0.000 0.000 -188.250 0.000 0.000
3.4.2 Load Combination in Footing Bottom (With Pier SW)
Unit( tonf , tonf-m )
Ft.Name
Pr.Name L.Comb.
1
1 0.000 0.000 -160.000 0.000 0.000
2 0.000 0.000 -120.000 0.000 0.000
101 0.000 0.000 -251.000 0.000 0.000
102 0.000 0.000 -188.250 0.000 0.000
3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name
L.Comb.
C.G.
of
Loads
1 0.000 0.000 -173.500 0.000 -13.012 1250.0 , 1250.0 2 0.000 0.000 -133.500 0.000 -10.012 1250.0 , 1250.0 4/5/2555
Copyright (c) GS E&C. All Rights Reserved
S
Fx
SFy
SFz
SMx
SMy
F1 SFx
SFy
SFz
SMx
SMy
F1 SFx
SFy
SFz
SMx
SMy
F1 pPage 10
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
Load Combination of Ultimate Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name
Sec.Na
L.Comb.
C.G.
of
Loads
S1 101 0.000 0.000 -251.000 0.000 -18.825 1250.0 , 1250.0 102 0.000 0.000 -188.250 0.000 -14.119 1250.0 , 1250.0
3.4.4 Pile Reaction Table
1 2 3 4 2500 2 5 0 0
Footing
Name
F1
Section Name-Pile Name PHC Pile-50 Pile Shape Circle Pile Number 4 EA Pile Diameter 500 mm LC Type Stability
Origin Point (0,0) mm
The Center of Gravity (0,0) mm The Center of Pile (75,0) mm
Vertical Critical LC : 1
LC : 1, ( 1.0 SW + 1.0 DL + 1.0 LL ) Unit (mm,tonf)
No.
Name
Pile Geometry
Bi-Axial
Shear (Hor)
Ra
Ua
Ha
X Y XY-Dir. XY-Dir. 1 PHCPile-50 -450 750 47.03 0 50 10 2 2 PHCPile-50 750 750 38.67 0 50 10 2 3 PHCPile-50 -750 -750 49.12 0 50 10 2 4 PHCPile-50 750 -750 38.67 0 50 10 2 4/5/2555Copyright (c) GS E&C. All Rights Reserved
S
Fx
SFy
SFz
SMx
SMy
Page 11
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Bi-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb a. Vertical - Bi Axial : R = NpFz My XXi2 Mx Y Yi2 - Ru = Rmax - Uf = Min[ 0 , Rmin ] - Ru < Va -> OK b. Horizontal - Hmax = ( Hxi 2 + Hyi2) Np < Ha -> OK c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift
4.1.2 Check of Vertical & Uplift Reaction
Ft.Name
Np(EA)
Fl
(mm)
Fw
(mm)
F1 4 2500 2500 1.87 2.25
Unit( tonf )
Ft.Name
L.Comb.
Pile
Result
F1 1
PHC Pile- 49.123 38.672 49.123 0 50 10 2 PHC Pile- 37.798 29.756 37.798 0 50 10
4.1.3 Check Of Horizontal Reaction
Ft.Name
L.Comb.
Pile
Hmax
(tonf)
Ha
(tonf)
Result
F1 2 PHC
Pile-50 0 2
4/5/2555
Copyright (c) GS E&C. All Rights Reserved
S
Xi
2(m
2)
SYi
2(m
2)
R
MaxR
MinRu
Uf
Ra
Ua
OK OK
Page 12
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom. Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Unit( mm , tonf , tonf-m )Ft.Name
Sec.Na
Dir.
L.Comb.
Fl or Fw
Sl or Sw
S1 X 101 2500.00 2500.00 251.000 -18.83 251.000 102 2500.00 2500.00 188.250 -14.12 188.250 S1 Y 101 2500.00 2500.00 251.000 0.000 251.000 102 2500.00 2500.00 188.250 0.000 188.250
5.1.2 Design Parameters
Yield Strength - D9 ~ D16 : f y1 , D19 ~ : f y2 f_cl : Clear Cover for edge of footing reinforcement f_clt : Clear Cover for top of footing reinforcementfp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation) Loc. : Location of Critical Point from left side of footing
Unit(kgf/cm2,mm)
f'c
fy1
fy2
f_cl
f_clt
fp_clb
.9 .85 173.00 3000.00 3000.00 50.0 50.0
5.2 REQUIRED REINFORCEMENT
5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2 As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ... ... ... ...0.0020 (b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used... ...0.0018 (c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
strain of 0.35 percent is used ... ... ... ... ... ....0.0018 60,000 f y - Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = .reqb d As3 = 1.333 .reqb d As4 = 200 f y b d As5 = 3 f ck f y b d Asmax = 0.75 b b d 4/5/2555
Copyright (c) GS E&C. All Rights Reserved
S
Fz
SM
SQ
F1 p
150.0
Page 13
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS b = 0.85 1 f ck f y 0.003 Es 0.003 Es + f y
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) ) If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction. But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where, Rn = Mubd2 , = .9 , .req = 0.85 fck fy
(
1 1 -2Rn 0.85fck)
5.2.2 Check of Footing Reinforcement
Footing Name : F1 GroupType : Isolated - X direction (All Width)
Sec.Nam
L.Comb.
Using
Bar
(mm)
Width
b
(m)
d
(cm)
S1 102 top 1.250 2.500 85.000 0.000 101 botom 1.400 2.500 74.000 47.124
Sec.Nam
L.Comb.
S1 102 top - -101 bottom 5.449 0.0019Sec.Nam
L.Comb.
S1 102 top - - - -101 bottom 45.000 34.248 45.653 86.712 64.520 385.394Sec.Nam
L.Comb.
Result
S1 102 top - -
-101 bottom 47.124 45.653
- Y direction (All Width)
Sec.Nam
L.Comb.
Using
Bar
(mm)
Width
b
(m)
d
(cm)
S1 102 top 1.250 2.500 83.000 0.000 101 botom 1.450 2.500 72.000 47.124
Sec.Nam
L.Comb.
S1 102 top - -101 bottom 5.918 0.0020Sec.Nam
L.Comb.
S1 102 top - - - -101 bottom 45.000 36.252 48.324 84.368 62.776 374.978Sec.Nam
L.Comb.
Result
S1 102 top - -
-101 bottom 47.124 48.324
4/5/2555
Copyright (c) GS E&C. All Rights Reserved
Loc.
(m)
As
(cm
2)
Not Used 15 - D20 @ 171.43Mu
(tonf-m)Rn
r.
Req -67.135As
1(cm
2)
As
2(cm
2)
As
3(cm
2)
As
4(cm
2)
As
5(cm
2)
As
max(cm
2)
Select As(cm
2)
Using As(cm
2)
OKLoc.
(m)
As
(cm
2)
Not Used 15 - D20 @ 171.43Mu
(tonf-m)Rn
r.
Req -69.025As
1(cm
2)
As
2(cm
2)
As
3(cm
2)
As
4(cm
2)
As
5(cm
2)
As
max(cm
2)
Select As(cm
2)
Using As(cm
2)
NGPage 14
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz My Momentintia
Area Contact Area Critical Point Method Critical Value
Bending Moment Diagram
F1 S1 X 101
Conventional Rigid Method with reaction (Method 1)
-251.000 tonf -18.825 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Mubottom = 67.135 tonf-m , Mutop = 0 tonf-m
[ mm ] 0 5 0 0 8 0 0 1 1 0 0 1 4 0 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 68.042 71.066 111.892 [B.M.D] [tonf-m] -67.1 -50.4 -33.6 -16.8 0 16.8 33.6 50.4 67.1 67.14 [B/L.M.D] [tonf-m/ft] -26.9 -20.1 -13.4 -6.7 0 6.7 13.4 20.1 26.9 26.85 4/5/2555
Page 15
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz My Momentintia
Area Contact Area Critical Point Method Critical Value
Bending Moment Diagram
F1 S1 X 102
Conventional Rigid Method with reaction (Method 1)
-188.250 tonf -14.119 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Mubottom = 50.351 tonf-m , Mutop = 0 tonf-m
[ mm ] 0 5 0 0 8 0 0 1 1 0 0 1 4 0 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 51.032 53.3 83.919 [B.M.D] [tonf-m] -50.4 -37.8 -25.2 -12.6 0 12.6 25.2 37.8 50.4 50.35 [B/L.M.D] [tonf-m/ft] -20.1 -15.1 -10.1 -5 0 5 10.1 15.1 20.1 20.14 4/5/2555
Page 16
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz Mx Momentintia
Area Contact Area Critical Point Method Critical Value
Bending Moment Diagram
F1 S1 Y 101
Conventional Rigid Method with reaction (Method 1)
-251.000 tonf 0.000 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Mubottom = 69.025 tonf-m , Mutop = 0 tonf-m
[ mm ] 0 5 0 0 1 0 5 0 1 4 5 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 125.5 125.5 [B.M.D] [tonf-m] -69 -51.8 -34.5 -17.3 0 17.3 34.5 51.8 69 69.03 [B/L.M.D] [tonf-m/ft] -27.6 -20.7 -13.8 -6.9 0 6.9 13.8 20.7 27.6 27.61 4/5/2555
Page 17
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz Mx Momentintia
Area Contact Area Critical Point Method Critical Value
Bending Moment Diagram
F1 S1 Y 102
Conventional Rigid Method with reaction (Method 1)
-188.250 tonf 0.000 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Mubottom = 51.769 tonf-m , Mutop = 0 tonf-m
[ mm ] 0 5 0 0 1 0 5 0 1 4 5 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 94.125 94.125 [B.M.D] [tonf-m] -51.8 -38.8 -25.9 -12.9 0 12.9 25.9 38.8 51.8 51.77 [B/L.M.D] [tonf-m/ft] -20.7 -15.5 -10.4 -5.2 0 5.2 10.4 15.5 20.7 20.71 4/5/2555
Page 18
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
5.3 ONE WAY SHEAR FORCE
5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only. - Vc= .85 2 f ck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!
5.3.2 Check of One-Way Shear
Footing Name : F1 GroupType : Isolated PileType : True
2500 2 5 0 0 2475 2 4 7 5 Unit : mm
- X direction One-Way Shear (All Width)
Sec.Nam
L.Comb.
Result
S1 101 2475 740 2500 109.682 0 OK
- Y direction One-Way Shear (All Width)
Sec.Nam
L.Comb.
Result
S1 101 2475 720 2500 106.718 0 OK
4/5/2555
Copyright (c) GS E&C. All Rights Reserved
Loc.
(mm)d
(mm)Bw
(mm) fVc
(tonf)Vu
(tonf)Page 19
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz My Momentintia
Area Contact Area Critical Point Method Critical Value
Shear Force Diagram
F1 S1 X 101
Conventional Rigid Method with reaction (Method 1)
-251.000 tonf -18.825 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Vu = 0 tonf [ mm ] 0 5 0 0 8 0 0 1 1 0 0 1 4 0 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 68.042 71.066 111.892 [S.F.D] [tonf] 139.1 104.3 69.6 34.8 0 -34.8 -69.6 -104.3 -139.1 [S/L.F.D] [tonf/ft] 55.6 41.7 27.8 13.9 0 -13.9 -27.8 -41.7 -55.6 4/5/2555
Page 20
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz My Momentintia
Area Contact Area Critical Point Method Critical Value
Shear Force Diagram
F1 S1 X 102
Conventional Rigid Method with reaction (Method 1)
-188.250 tonf -14.119 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Vu = 0 tonf [ mm ] 0 5 0 0 8 0 0 1 1 0 0 1 4 0 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 51.032 53.3 83.919 [S.F.D] [tonf] 104.3 78.2 52.2 26.1 0 -26.1 -52.2 -78.2 -104.3 [S/L.F.D] [tonf/ft] 41.7 31.3 20.9 10.4 0 -10.4 -20.9 -31.3 -41.7 4/5/2555
Page 21
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz Mx Momentintia
Area Contact Area Critical Point Method Critical Value
Shear Force Diagram
F1 S1 Y 101
Conventional Rigid Method with reaction (Method 1)
-251.000 tonf 0.000 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Vu = 0 tonf [ mm ] 0 5 0 0 1 0 5 0 1 4 5 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 125.5 125.5 [S.F.D] [tonf] 125.5 94.1 62.8 31.4 0 -31.4 -62.8 -94.1 -125.5 [S/L.F.D] [tonf/ft] 50.2 37.6 25.1 12.5 0 -12.5 -25.1 -37.6 -50.2 4/5/2555
Page 22
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS 2500 2 5 0 0 1 2 3 4 Title
Foundationname Sectionname Direction L/CID Analysis Method
Fz Mx Momentintia
Area Contact Area Critical Point Method Critical Value
Shear Force Diagram
F1 S1 Y 102
Conventional Rigid Method with reaction (Method 1)
-188.250 tonf 0.000 tonf-m 3.2552 m4
6.250 m2
Critical Max Point Vu = 0 tonf [ mm ] 0 5 0 0 1 0 5 0 1 4 5 0 2 0 0 0 2 4 2 5 7 5 0 0 [Loading] [ tonf , tonf/m ] 94.125 94.125 [S.F.D] [tonf] 94.1 70.6 47.1 23.5 0 -23.5 -47.1 -70.6 -94.1 [S/L.F.D] [tonf/ft] 37.6 28.2 18.8 9.4 0 -9.4 -18.8 -28.2 -37.6 4/5/2555
Page 23
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
5.4 TWO WAY SHEAR FORCE
5.4.1 Two-Way Shear Formula
Vu = Fz Shade Ratio
(a) Vc1= .85 2 (1 + 2/ c) f ck bo d (eq 11-33) <- Vc1 (b) Vc2= .85 2 (1 + s d / 2 bo) f ck bo d (eq 11-34) <- Vc2 (c) Vc3= .85 4 f ck bo d (eq 11-35) <- Vc3
Vc = Min( Vc1 , Vc2 , Vc3) ACI 318-05 CODE 11.12.2.1 Vu f Vc , then OK
where
= ratio of long side to short side of the column, concentrated load or reaction area s = 40 for interior colimns
= 30 for edge columns = 20 for corner columns bo = perimeter of critical section
Shade Ratio = Footing Area - Punching Area Footing Area
5.4.2 Check of Two-WayShear
2500 2 5 0 0 1Ft.Name
F1Punching Area
Pr.Name
1Pile effect
Shape
RectangleL.Comb.
101Pl
300 mmPw
400 mmbo / d
4360 / 740 mmVu
1.333333 / 40Result
5.5 PILE PUNCHING SHEAR FORCE
5.5.1 Pile Punching Shear Formula
Vu = Fz Shade Ratio
(a) Vc1= .85 2 (1 + 2/ c) f ck bo d (eq 11-33) <- Vc1
(b) Vc2= .85 2 (1 + s d / 2 bo) f ck bo d (eq 11-34) <- Vc2
(c) Vc3= .85 4 f ck bo d (eq 11-35) <- Vc3
Vc = Min( Vc1 , Vc2 , Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
= ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns = 20 for corner columns bo = perimeter of critical section
Shade Ratio = Footing Area - Punching Area Footing Area
4/5/2555
Copyright (c) GS E&C. All Rights Reserved
b
c /
as
fVc1
fVc2
fVc3
fVc
11856.000 cm2 3.937 / 4 478.214 tonf 840.604 tonf 382.571 tonf 382.571 tonf 247.018 tonfOK
Page 24
Calculation Sheet
of
Foundation
Project Na. : ACI Project No. : Panithi Client : MKS
5.5.2 Check of Pile Punching Shear
2500 2 5 0 0 1 2 3 4
Ft.Name
F1Punching Area
Pile No.
3 1/20Shape
CircleL.Comb.
101PileName
PHC Pile-50Diameter
500mmbo
2333.02mmVu
d
740mmResult
4/5/2555Copyright (c) GS E&C. All Rights Reserved
b