• No results found

Demand Forecasting Considering Actual Peak Load Periods Using Artificial Neural Network

N/A
N/A
Protected

Academic year: 2021

Share "Demand Forecasting Considering Actual Peak Load Periods Using Artificial Neural Network"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 3 shows the procedure for the forecasting and Figure 4  shows the ANN network architecture while Table I also shows  the composition of this network architecture
TABLE VII.   M APE  C ONDITION OF THE  APLP N IGHT X1 X2 X3 X4 X5  T  JST Error  120.03 115.49 120.79 138.11 139.98 136.62 101.141 25.9715  117.05 118.02 119.48 134.72 129.59 130.84 102.451  21.697  120.34 119.41 122.32 137.28 139.29 125.85 99.7304  20.755

References

Related documents

A water collection basin or impoundment is a primary means of reducing potential water quality problems. It should be the goal of each container nursery operation that no

Sensitivity tests on the organism which were carried on during this interval revealed: penicillin sensitivity, 0.05 u/mI.; streptomycin, 3.0 u/mI.; and Na- sulfadiazine, 5.0

The present research aims to investigate the relationship between belief in a just world (BJW) and the symptoms of psychological disorders given the intermediate

 Sole Responsibility, average of 25 students per class  Course designed for students with music backgrounds 2001 – 2002 Teacher Trainer/Lecturer, Mi Escuelita, Dallas,

1) The TxDMV Customer Relationship Management (CRM) Database - Tracks customer complaints and suggestions for the agency. The database is used to store and catalog all

Although the wholesale services Big River initially intends to offer in the exchanges included in this application are not "regulated telecommunications services," in that