08 October, Renovation Projects at. East Vincent Elementary School + East Coventry Elementary School. Inspiring Excellence. Inspired Students.

Full text

(1)

0 8 O c t o b e r , 2 0 1 4 R e n o v a t i o n P r o j e c t s a t E a s t V i n c e n t E l e m e n t a r y S c h o o l + E a s t C o v e n t r y E l e m e n t a r y S c h o o l I n s p i r i n g E x c e l l e n c e . I n s p i r e d S t u d e n t s .

(2)

E

AST

V

INCENT

ES

E

AST

C

OVENTRY

ES

T

IMELINE

C

ONSTRUCTION COST

renovation +

addition

renovation +

addition

December 2014

-July 2017

$47,109,558

1

P

HASING

 Independent approach to each site

 Reduction in site infrastructure on East Vincent property due to not having to maintain portions of existing building to house East Coventry Students

A

CTION

R

EQUIRED

 Maintain floor plan layout for East Vincent and revise design of site, building shell and systems (this

requires a new set of bidding documents)

 Revise approach to phasing at East Vincent due to not needing to maintain the 1950’s construction

 Assess approach to phasing at East Coventry

Configure additions to allow for phased renovation of

Traditional Renovation – Renovations and

Additions to Both Sites

(3)

E

AST

V

INCENT

ES

E

AST

C

OVENTRY

ES

T

IMELINE

C

ONSTRUCTION COST

renovation +

addition

renovation +

addition

December 2014

-September 2017

$47,109,558

2

Maintain Current Plan

P

HASING

 Renovation East Vincent

 House East Coventry at East Vincent

 Renovate East Coventry

 Demolition and Final Site Construction at East Vincent

A

CTION

R

EQUIRED

 Maintain floor plan layout and revise design of site, building shell and systems (this requires a new set of bidding documents)

 Revise approach to phasing at East Vincent to avoid temporary condition costs that cannot remain or redundancy in construction

(4)

E

AST

V

INCENT

ES

E

AST

C

OVENTRY

ES

T

IMELINE

C

ONSTRUCTION COST

new school

new school

December 2014

-June 2018

$46,594,590

3

Build New Schools at E. Vincent +

E. Coventry Sites

P

HASING

 Construct East Coventry School

 Move East Vincent to old East Coventry School

 Demo East Vincent and construct new East Vincent

 Demo of old East Coventry

A

CTION

R

EQUIRED

(5)

E

AST

V

INCENT

ES

E

AST

C

OVENTRY

ES

T

IMELINE

C

ONSTRUCTION COST

renovation +

addition

new school

December 2014

-April 2017

$48,446,003

4

Renovations and Additions to E. Vincent +

Build New E. Coventry Elementary

P

HASING

 Independent approach to each site

 Reduction in site infrastructure on East Vincent property due to not having to maintain portions of existing building to house East Coventry Students

A

CTION

R

EQUIRED

 Maintain floor plan layout for East Vincent and revise design of site, building shell and systems (this

requires a new set of bidding documents)

 Revise approach to phasing at East Vincent due to not needing to maintain the 1950’s construction

(6)

E

AST

V

INCENT

ES

E

AST

C

OVENTRY

ES

T

IMELINE

C

ONSTRUCTION COST

renovation +

addition

new school

December 2014

-April 2017

$49,359,495

4a

Revise Renovation Plan (major addition)

for E. Vincent + Build New E. Coventry

P

HASING

 Independent approach to each site

 Reduction in site infrastructure on East Vincent property due to not having to maintain portions of existing building to house East Coventry Students

A

CTION

R

EQUIRED

 Revise floor plan layout for East Vincent and revise design of site, building shell and systems (this requires a new set of bidding documents)

 Revise approach to phasing at East Vincent due to not needing to maintain the 1950’s construction

(7)

p r o p o s e d o p t i o n s

EASTVINCENTES EASTCOVENTRYES

timeline

construction cost

renovation + addition renovation + addition Dec 2014 -Jul 2017 $47,109,558

1

options

renovation + addition renovation + addition Dec 2014 -Sep 2017 $47,109,558

2

new school new school Dec 2014 -Jun 2018 $46,594,590

3

renovation + addition new school Dec 2014 -Apr 2017 $48,446,003

4

renovation + addition new school Dec 2014 -Apr 2017 $49,359,495

4a

(8)

p r e l i m i n a r y s c h e d u l e

design + construction docs bidding new construction demolition 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 East Vincent b East Coventry b East Vincent b East Coventry b East Vincent b East Coventry b East Vincent b East Coventry b East Vincent b East Coventry b demo 1950's building

dual occupancy of site

new construction (14 months) new construction (14 months)

procurement reno + addition (17 months)

dual occupancy of site

new construction (14 months)

docs (7 months) reno + addition (17 months) docs (13 months)

docs (13 months) reno + addition (17 months)

docs (13 months) reno + addition (17 months)

docs (13 months) new construction (14 months) docs (13 months)

reno + addition (17 months) docs (7 months)

docs (7 months)

4a

docs (7 months) reno + addition (17 months) docs (13 months) 4 3 2 2014 2015 2016 2017 2018 1

(9)