Reuse of Construction, Demolition and Excavating Materials
Full text
Figure
Related documents
With respect to actual ECB policy the story looks rather different; the results of Gerdesmeier and Roffia (2003) and Ullrich (2003) – who use standard output gap measures based
The paper will mainly cover the reutilization of construction and demolition waste generated from demolition, new construction renovation in building practices with a
En resumen, los datos encontrados en nuestro estu- dio nos permiten concluir, por un lado, que es muy pro- bable que para alcanzar un alto rendimiento deportivo internacional
Abbreviations; a: adjusted, AD: Alzheimer's disease, APOE: apolipoprotein epsilon4, c: crude, CAR: circadian activity rhythms, CASI: cognitive abilities screening instrument,
• the CCRA issued a ruling on this type of transaction in ATR-66 under the old forgiveness rules and stated that GAAR would not apply because the Canadian vendor is eliminating
The Trustee (acting on behalf of the Sukukholders), in its capacity as the lessor (“ Lessor ”) under an Ijarah Agreement (“ Ijarah Agreement ”), shall then
This chapter informs the main objective of the thesis through an indication that at the dis-aggregated level, there are significant levels of heterogeneity among the
The Army’s Force Generation model—designed to schedule more predictable deployments for troops and their families and better equip units preparing to deploy overseas—only