Valencia pilot project

23 January 2014, Steering Committee

Marsella, France

Sandra García, Begoña Serrano

Leticia Ortega, Laura Soto.

(2)

Number of dwellings: 28

Characteristic of the area: urban

Type of housing : Apartment

block

Date of construction / date of last

refurbishment: 1972

LIH compatibility: most of the

residents are retirees (86%) who

receive a state pension which

generally is less than the minimal

income which defines the

boundary of social security

(poverty).

Short description of the pilot

Fontanares

(3)

Number of dwellings: 28

Characteristic of the area: urban

Type of housing : Apartment

block

Date of construction / date of last

refurbishment: 1969/2011

LIH compatibility: most of the

residents are retirees (76%) who

receive a state pension which

generally is less than the minimal

income which defines the

boundary of social security

(poverty).

Short description of the pilot

PIOXII

(4)

WP 5.2. Diagnosis and action plan

BUILDING ENVELOPE RENOVATION

Improving thermal insulation WINDOWS

Solar protection WINDOWS

Improving thermal insulation FAÇADE

Improving thermal insulation ROOF

Elevator measures energy saving

(5)

WP 5.4./5.5 Pilot projects implementation

Fontanares

Pio XII

Periodical visits to the pilot activities

(6)

WP 5.4./5.5 Pilot projects implementation

Fontanares

Pio XII

Periodical visits to the pilot activities

(7)

WP 5.4./5.5 Pilot projects implementation

Pio XII

September 30, 2013

We detected that the original roof was

more degraded than thought. It was

urgently needed to find a solution in

order to be able to continue the works.

The new roof solution initially proposed

was changed in order to mantein the

initial energy targuerts and to be

according to the objetives of the new

energy regulation in Spain (Orden

(8)

WP 5.4./5.5 Pilot projects implementation

Pio XII

Administration and technical process:

1. Technical report

2. Advertisement for contracting

3. Offers received

4. Resolution

Tasks:

1 Demolition of roof

degraded materials

2 Placement of lightweight

concrete as a base of

thermal insulation.

Offer 1: 8750 euros

Offer 2: 8003 euros

Offer 3: 8700 euros

(9)

WP 5.4./5.5 Pilot projects implementation

(10)

WP 5.4./5.5 Pilot projects implementation

July

The contract with TORREMAR

REHABILITACION S.L. (they are in the 6th

position at national level as a retrofitting

contractor) was signed

August

Beginning of the refurbishment works

September Monthly Certification

Fontanares: 15033,05 EUROS

Pio XII: 5.595,94 EUROS

October Monthly Certification

Fontanares: 8.663,89

Pio XII: 5.025,28 EUROS

November The works were slowed until they stopped.

Termination of contract with TORREMAR

December Co enterprises that presented offers in the first

call for tenders and second Call for tenders:

• PIO XII 05/12/2013 – 27/12/2013

• FONTANARES 18/12/2013 – 09/01/2014

OUR

LAST

MEETING

(11)

WP 5.4./5.5 Pilot projects implementation

Task developed:

Meeting with banks

Meeting with enterprises participating in the first call for tenders

Meeting with NEW enterprises for the scond call for tenders.

Invitation to participate in the call for tenders to new enterprises.

Several meeting with the neighborhood of buildings to explian the

process to them.

(12)

WP 5.4./5.5 Pilot projects implementation

December_ Second Call for tenders:

6 companies collected the information

Result: IVE will manage the implementation directly through

the subcontractors.

Fontanares

December_ Second Call for tenders:

9 companies collected the information

Result: The contractor selected will continue the

implementation during January.

(13)

WP 5.4./5.5 Pilot projects implementation

(14)

W 6.4 Experimentation smart metering

22 UNITS (15 FOR DWELLINGS INTERIOR

+ 7 FAÇADES EXTERIOR)

Indoor temperature measuring device

U12 Temperature and RH Data Logger

Onset HOBO Two Channel USB Temperature/Relative Humidity

Logger with 12-bit Resolution

UNE-EN ISO 7726:2002 Ergonomics of the thermal environment

- Instruments for measuring physical quantities. (ISO 7726:1998)

15 FOR DWELLINGS

Smart meter energy

Current cost MODEL

(15)

W 6.4 Experimentation smart metering

Indoor temperature measuring device

(16)
(17)

WP 2. Information and awareness development

(18)
(19)

Preparation of an event finishing FONTANARES

Coordination with:

– Department of Environmental Hall Valencia

» (meeting may 2013)

– Neighborhood association Patraix

» (meeting june 2013)

58,947 inhabitants

(20)

Preparation of an event finishing PIOX XII

Coordination with:

– Department of Environmental Hall Valencia

» (meeting may 2013)

– Neighborhood association Campanar

» (meeting june 2013)

12.147 inhabitants

(21)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

(22)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

Where: Valencia International affair NOVABUILD

Attendees: 90 persons

(23)

WP3 Capitalization activities

International meeting:

(24)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

Where: Valencia International affair NOVABUILD

Attendees: 90 persons

(25)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

(26)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

(27)

WP3 Capitalization activities

International meeting:

MARIE ELIH MED PROFORBIOMED.

When: 14 th November 2013 MORNING

(28)

WP3 Capitalization activities

Collaboration agreement with WWF(World Wildlife Fund) SPAIN:

Project: Improving the energy of your building

- Dissemination activities throught WEBSITES

- Participation in TMG-ELIHMED-IVE

(29)

Thank you very much

for your attention

References

Related documents

• Value of forest industry economic sectors – The annual value of sales or output of New Hampshire’s forest products industry totals nearly $ 1.4 billion while the

We have articles describing contributed packages for princi- pal component analysis ( ade4 , used in creating Eric Lecoutre’s winning graphic) and statistical process control ( qcc

According to the EPA’s peer-reviewed “Human and Ecological Risk Assessment for Coal Combustion Wastes,” people in those circumstances have as much as a 1 in 50 chance of

Up to 6 additional points were awarded if the adult congenital heart program provided the following: a formal plan to transition patients from the pediatric to adult congenital

a) Following a readjustment of the KE 1 and KE2 number of working days, the revised indicative distribution of days per category of experts is as follows. b) We confirm that the

This work is protected against unauthorized copying under Title 17, United States C o d e M icroform Edition © ProQuest LLC.. ProQuest

Center for Air Transportation Systems Research (CATSR) at George Mason University 9 Emissions Inventory Emissions Data Bank Trajectory Analysis (AEDT/NIRS) Emissions Index

At a dose of 10 mg/ml, ethyl acetate and buta- nol extracts showed significant antispasmodic activity by 100% followed by alcohol extract, chloroform, petroleum ether and