• No results found

rata national representative survey deployment ORGANIZING rata RATA Master training Arne H Eide

N/A
N/A
Protected

Academic year: 2021

Share "rata national representative survey deployment ORGANIZING rata RATA Master training Arne H Eide"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

rATA national representative survey deployment

ORGANIZING rATA

(2)

rATA Deployment

KEY STEPS

Key actors

National Data Coordinator (NDC)

Anchoring at MoH

Establish work procedures

Responsibility for Data Collection

Translation of Questionnaire

National Deployment Plan (NDP)

Stakeholder Meeting/Involvement

Completing sample design

Referral procedures

Recruitment and training of enumerators

Field testing and testing of data inflow

Data collection

Data analyses

Reporting of results: Global and National

(3)

Lesson: ORGANIZING rATA

• Objective: To go through, learn about and discuss a range of different elements of organising data collection in countries • Outcomes:

• Make qualified and strategic decisions about organization of rATA in country

• Draft and finalize the National Development Plan

• National training: Enumerators' insight important for motivation, conduct, ethics

(4)

Methodology

& Methods Organizing Training

Data

Collection Follow up

FIVE PILLARS OF A REPRESENTATIVE HOUSEHOLD SURVEY

PREPARATIONS DATA

(5)

WHO MoH Stakeholders National Data Coordinator Key Actors in Country Data Collection Team rATA KEY ELEMENTS IN rATA ORGANIZATION

(6)

National Data Coordinator

Participate in the master training curriculum (virtual)

Obtain necessary official clearance and (ethical) approvals for rATA survey deployment in the country

Develop rATA data collection work plan (NDP)

Conduct necessary adaptation and testing to the survey prior to data collection

Lead the design of the in-country survey enumerator training workshop

Organize and deliver the workshop in country for all enumerators to acquire the necessary knowledge and skills to conduct the data collection in the field

Arrange logistics (transportation, accommodation, etc) for enumerators to conduct data collection in the field.

Provide guidance and support to the enumerators during field data collection

Monitor process and ensure timely delivery of data with the quantity and quality according to the workplan

Obtain government review and clearance of publishing the rATA survey data and findings in the GReAT

Use the data to develop a national AT access factsheet.

(7)

WHO; HQ/RO/CO/GDC

Global co-operation on assistive technology (GATE)

The GATE initiative has one overall goal: to improve access to high-quality affordable assistive products globally.

Global Report on effective access to Assistive Technology (GReAT)

GATE Team/GDC

Data collection: rATA and ATA-C*

GATE Team/Global Data Coordinator to provide support to NDC/country teams throughout the implementation of rATA

- traninig - materials

- in-country training

- continuous follow-up before and during data collection - data analyses

- data back to countries - follow-up after GReAT

*a tool to collect in-depth information on a country’s capacity to procure and provide assistive technology

• To achieve its goal, the GATE initiative is focusing on five interlinked areas (5P):

(8)

Ministry of Health

• Project owner in country – WHO contract partner

• Formal approval/policy • Resources

• Appointment of NDC

• Utilization of data at national level • Application of results

(9)

KEY ACTORS IN COUNTRY

• Ministry of Health

• Central Statistical Office

• Ethical Review Board, Approval Authority

• Other relevant ministries • Research Group/Agency

(10)

CENTRAL STATISTICAL OFFICE

• Key actor in data collection, analyses and reporting

• Responsible for censuses • National sampling frame

weights

• Analyses at national level • Expert support to rATA in

(11)

STAKEHOLDERS

• Disabled People's Organizations • Non-Governmental Organizations • AP Service Providers

• AP Producers

• Health Service Providers

• Rehabilitation Service Providers • International Organizations

(12)

IMPORTANCE OF STAKEHOLDERS

• Knowledge • Experience • Representing interests • Support • Follow-up • Utilization of results

Project interests supported by stakeholders

(13)

STAKEHOLDER MEETING

• Invite key stake holders (20-30) • Duration: One day

• Demonstrate support and importance • Present objectives – provide some

background to AP/AT e.g. rATA concept note, rATA Questionnaire

• Time for feedback on rATA, follow-up and utilization of results

(14)

DISABLED PEOPLE'S ORGANISATIONS

• Expertise on AT in context • Experiences valuable for

understanding results

• Ensure legitimacy of rATA • Utilization of results

(15)

RESEARCH GROUP/AGENCY

• Experience with national, representative surveys

• Handle logistics in a complex data collection

• Access to a pool of qualified enumerators

(16)

FINDING THE BALANCE IN COUNTRY

CENTRAL STATISTICAL OFFICE RESEARCH AGENCY MINISTRY OF HEALTH • COMPETENCE • EXPERIENCE

• ABILITY TO DELIVER ON TIME • ESTABLISHED WORKING

RELATIONSHIPS

• COSTS

(17)

rATA ORGANIZATION (In country)

• Different models – adapt to context • Reporting lines within MoH

• Steering Committee • Reference Group

• rATA Team – ensuring support to NDC (resources and expertise)

(18)

rATA organization

WHO Country Office (CO) WHO Regional Office (RO) WHO headquarters/ GDC Reference Group Ministry of Health NDC team Data Collection team

(19)

rATA ORGANIZATION (In the field)

(Whatsapp) DATA COLLECTION TEAMS: ONE SUPERVISOR 5 – 7 ENUMERATORS DATA COLLECTION TEAM NDC Research Agency

(20)

Data Collection Teams

NDC SUPERVISOR

(21)

INVOLVING INDIVIDUALS WITH DISABILITIES • Steering committee/Reference

group

• Supervisors & enumerators

• Consultative process (DPOs): Interpretation of results, input to policy processes, setting priorities and formulating targets

(22)

UTILISATION OF RESULTS

• Influencing awareness at different levels; decision makers, service

providers, private businesses/industry, general population

• Influencing policy; stakeholder dialogue • Identify targets for policy and service

provision

(23)

TELE-rATA

• Tele-rATA is a version of rATA adapted to telephone interviewing

• Tele-rATA was developed to enable remote interviewing where physical interviews are not feasible because of, for example, resource constraints, transportation difficulties or communicable diseases

• Tele-rATA is intended for the same stakeholders as rATA • Most rATA elements are the same for TELE-rATA, but

some key differences are:

• Some changes/reduction in the questionnaire • Sampling

• Team organization and mode of data collection

• See addendums to GDP and rATA enumerator manual for further information on TELE-rATA

References

Related documents

Has had their resume viewed online by your company and meets the minimum qualifications AND/OR Has applied to a job at your company. Record Keeping Requirements (keep

Effect of stem cell source on transplant outcomes in adults with acute leukemia: a comparison of unrelated bone marrow (BM), peripheral blood (PB) and cord blood (CB). Kumar P,

The disadvantage of a database solution is that the combined size of all accounts affects its performance on each account, so the worst-case scenario is when a user’s account is

ABSTRACT : In this paper, we consider a finite undirected and connected simple graph G(E, V) with vertex set V(G) and edge set E(G).We introduced a new computes the spectra

An analysis o f the impact o f various reservoir and hydraulic fracture parameters on hydraulically fractured shale gas reservoirs using an appropriate reservoir simulation model

While this seems to eliminate the presence of top prospects as a factor for significantly increasing attendance at minor league games, it would be beneficial to see the impact

We found that, despite more imprecise predictions of tactile- spatial changes, there were no group differences in model error variances (“irreducible uncertainty” (de

Registration of Contractors for Various civil & Mechanical Engineering related works at.. GSFC –