• No results found

2015 Contractor Agreement SWEPCO Texas CoolSaver SM Program

N/A
N/A
Protected

Academic year: 2021

Share "2015 Contractor Agreement SWEPCO Texas CoolSaver SM Program"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

This Agreement is for performance by CONTRACTOR, not assignable by CONTRACTOR, and CONTRACTOR represents and warrants that no individual other than CONTRACTOR shall perform any

The Procuring Entity shall, upon a written request of the Contractor which shall be submitted as a Contract document, make an advance payment to the Contractor in an

sulphospurrite mineral.Sulphate ring generally formed in calcination zone and it is very hard in nature.Alkali ring is calcination zone and it is very hard in nature.Alkali ring is

Upon such termination, Subcontractor shall be entitled to recover from Contractor payment for all Subcontract Work satisfactorily performed but not yet paid for, including

RDMs obtained using the data from middle temporal area of the eight subjects are averaged, and we applied Kemp’s algorithm on this data.. The nodes represent the eight basic

The crystal structure of the native FhuA shows an asymmetric outer-membrane protein with an elliptical cross-sectional area that decreases from the trans to the cis side ( Fig.

In this thesis, a novel vision based localization and calibration technique has been proposed that attempts to localize one-plane camera sensor network with

When the contractor has performed in accordance with the provisions of this Agreement, the City of Cumming shall pay to the contractor, within 30 days of receipt by the City of