Annex A

Business Continuity Management Programme

(2)

Business Continuity Management Policy

_______________________________________________________________________________________________

Title: BCM Policy Date: 05/11/2008

Reference: BCM/Policy Version: 1.0

Status: Final Page: 2 of 5

© 2008 The Scottish Parliament - Restricted

1. Introduction

This Business Continuity Management (BCM) Policy defines the scope of the SPCB’s ability to maintain continuity of support for the conduct of Parliamentary business.

2. Business

Continuity

It is not possible for an organisation to prevent all unexpected incidents, however much effort and budget is directed at risk management. Therefore a generic re-sponse capability is required.

Business Continuity (BC) provides a framework for creating resilience that will enable the SPCB to continue to fulfill its role under adverse conditions. It

provides the capability for an effective response should a serious incident occur. Serious incidents include fires, floods, power cuts, industrial action, epidemics and pandemics. This resilience is delivered through a programme of work known col-lectively as Business Continuity Management (BCM).

BCM increases the resilience of the organisation by:

• Maintaining a capability for responding to unexpected incidents, minimis-ing the extent of financial and reputational damage by havminimis-ing a rehearsed recovery plan over a pre-agreed timescale.

• Setting priorities for threat minimisation measures to be implemented by identifying those processes, which if lost, would most rapidly damage the organisation

BCM is an element of good corporate governance and the responsibility senior management.

3.

Scope of the Parliament’s BCM Policy

3.1 Principles

(3)

Business Continuity Management Policy

_______________________________________________________________________________________________

Title: BCM Policy Date: 05/11/2008

Reference: BCM/Policy Version: 1.0

Status: Final Page: 3 of 5

© 2008 The Scottish Parliament - Restricted

3.2 Parliament Building

The BCM Policy covers all activities undertaken for the Parliament by: • SPCB staff

• Contracted service providers

3.3 Members’ Parliamentary Offices

The BCM Policy provides for;

• Support and accommodation for Members within the parliamentary complex

• Advice and guidance to Members’ local offices.

3.4 Parameters

Time

Following an incident which renders the Parliament building wholly or partially un-usable the BCM Policy provides for the infrastructure and logistics to enable: • an emergency meeting of the Parliament within a maximum of two days of

the disruption

• limited parliamentary business (plenary and committee) within a maximum time period of two weeks of the disruption.

.

Geographical

Incidents can vary in their severity and impact. The BCM Policy therefore includes the flexibility to allow decisions to be made on where to resume parliamentary business, based on a number of previously approved locations both within and outwith Edinburgh.

Staff Resources

The BCM Policy acknowledges that SPCB staff numbers and those of contracted service providers can fall below operational levels e.g. industrial dispute, epi-demic/pandemic or transport disruption. The strategy identifies minimum levels of suitably qualified staff required to meet safety and security requirements and to support Parliamentary business.

(4)

Business Continuity Management Policy

_______________________________________________________________________________________________

Title: BCM Policy Date: 05/11/2008

Reference: BCM/Policy Version: 1.0

Status: Final Page: 4 of 5

© 2008 The Scottish Parliament - Restricted

because of direction by civil or military authorities is taken into account in the BCM Policy. In these circumstances the Chief Executive and Directors will decide on an appropriate course of action. In all other circumstances the time and geographical parameters will apply.

4.

Relationship of Parliament’s BCM Policy to Risk Management

A separate programme of work to manage risks is in operation at the Parliament. At a strategic level this includes business continuity. Many serious threats are not easy to identify. Their likelihood is impossible to measure and specific control measures are impractical. In addition therefore, it is necessary to have a separate Business Continuity Management structure and function to provide the means of delivering a rehearsed response to unexpected incidents.

5.

Responsibility for the Parliament’s BCM Programme

All SPCB staff have ownership of BCM, but some personnel have specific respon-sibilities. These are;

Chief Executive and Directors

• Members of Business Continuity Project/Programme Board • Business Continuity Manager

• Heads of Office

• Business Continuity Coordinators • Procurement

• Contract Managers

The detailed responsibilities of these personnel are set out in the Parliament’s Strategy for Incident Management.

6.

Responsibility for Incident Response

The Parliament’s response to an incident is managed by the following teams; • Strategic - Incident Management Team

• Tactical - Emergency Response Team, - Incident Communications Team,, - Business Continuity Team

(5)

Business Continuity Management Policy

_______________________________________________________________________________________________

Title: BCM Policy Date: 05/11/2008

Reference: BCM/Policy Version: 1.0

Status: Final Page: 5 of 5

© 2008 The Scottish Parliament - Restricted

7.

Standards Applied

7.1 British Standard

The BCM programme conforms to BS 25999 -1: A Code of Practice for Business Continuity and follows the Business Continuity Institute’s Good Practice Guide.

7.2 Business Continuity Exercises

Comprehensive testing of Parliament’s Business Continuity Plans will be carried out on an agreed four year rolling programme.

7.3 Audit

References

Related documents

Uveitis posterior adalah peradangan di koroid dan retina yang sering terjadi di negara berkembang karena tingginya penyakit infeksi (toksoplasmosis, tuberkulosis, HIV,

In conclusion, after decades of public health intervention with water fluoridation, the lack of evidence showing community effectiveness for reducing dental caries, along with the

Supplementary Materials: The following are available online at http://www.mdpi.com/2072-4292/11/7/871/s1 : Table S1: Root mean squared errors of candidate models; Table S2:

Provokes cockcrow but<:ockcrow drags forth the reluctant sun not Resurrection that allows us to rise and walk but the rising.. Of the rebel dead founds resurrection

In France, the first entities which were subject to statutory audit were limited companies which were required by the July 1867 law to appoint one or more auditors to audit

The diagram below illustrates interaction between a Web browser based Internet or intranet user, Exchange Online Dedicated, the customer chosen MFA solution, and elements of

Since these three CSM platforms are so popular, and with widely publicized vulnerabilities built within them (mainly third-party themes and plugins designed by

As well as a higher volume of claims reducing the amount of compensation awarded to victims in a no-fault system, the threat of lower compensation is also clear as the Deputy