BOARD OF EDUCATION OF WICOMICO COUNTY

N/A
N/A
Protected

Academic year: 2021

Share "BOARD OF EDUCATION OF WICOMICO COUNTY"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

N. Eugene Malone, Jr. Chairman Michael G. Murray Vice Chairman Allen C. Brown, Sr. Donald L. Fitzgerald Tonya Laird Lewis

John Palmer Ann B. Suthowski

B

OARD OF

E

DUCATION OF

W

ICOMICO

C

OUNTY

P.O. Box 1538 2424 NorthGate Drive Salisbury, MD 21802-1538 410-677-4400 FAX 410-677-4444 www.wcboe.org

Wicomico County Public Schools (WCPS) prohibits illegal discrimination based on race, ethnicity, color, ancestry, national origin, religion, immigration status, sex, gender, gender identity, gender expression, sexual orientation, family/parental status, marital status, age, physical or mental disability, poverty and socioeconomic status, language, or other legally or constitutionally protected attributes or affiliations and provides equal access to the Boy Scouts and other designated youth groups. Discrimination undermines our community’s long-standing efforts to create, foster, and promote

equity, inclusion, and acceptance for all.

Donna C. Hanlin, Ed.D.

Superintendent of Schools

March 10, 2021 MAJOR BID ADDENDUM #1 for Conditions and Specifications for

HVAC PARTIAL REPLACEMENT Glen Avenue Elementary

This is a “Major Addendum”. Failure to acknowledge this addendum on the Form of Proposal may be

determined as non-responsive bid.

1. DELETE AND REPLACE:

Drawing EO.1 Electrical Legends, Notes Abbreviations & Schedules with attached dated 03.09.21. 2. SUPPLEMENTAL DRAWING:

Davis Bowen & Friedel, Inc. drawing ADD-1 dated 3/4/2021 Drawing Sheet 1 of 2 only. NOTE: Sheet 2 of 2 was not used.

3. ROOFING CONTRACTOR: Raintree Services, Inc. 115 S. Main Street Jacobus, PA 17407 Mitch Sterner

mitch@raintreeservices.com

Office: 717-428-6417 Cell: 717-650-4051 4. QUESTIONS AND ANSWERS:

1. Who supplies wood cabinets in classrooms adjacent to BARD Units? (See Note 41.1-81) ANSWER: The successful contractor is responsible for coordinating the work.

2. Who supplies all inter connect wire from DSU Units?

ANSWER: The successful contractor is responsible for coordinating the work.

3. Circuits 34,36 in Panel P1 are designated for FCU Units – Where are these Units Located? ANSWER: These FCU units are existing to remain per Note #1 on Panel Schedule P1 on sheet

(2)

91036-213 Glen Ave HVAC Partial Replacement Addendum 1 –Page 2 of 3

4. ln Panel P1 circuits 1,3,5,7,9,11,13,15,17,19,81,83 and circuits

7,4,6,8,10,12,14,16,18,20,22,24,26,78,8A,82,84 show various items connected to these breakers. Where are these items within the building? ls there a drawing showing the location of this

equipment?

ANSWER: These circuits are existing to remain per Note #1 on Panel Schedule P1 on sheet E0.1.

5. What feeds the five D.S.U. Units (cassettes) nothing designated on panel schedule?

ANSWER: Per Note #7 on E2.1 the DSUs are powered from the Outdoor Unit located on the roof. This coincides with the Mechanical Schedule for DSUs on M6.0, note #2. 6. Are all EMT connectors and couplings to be set screw or compression, steel or diecast?

ANSWER: All connections to be per code. Steel screw connectors and couplings are acceptable per code.

7. ls all wiring to be THHN?

ANSWER: THHN is acceptable.

8. Who will supply the main service transformer?

ANSWER: DP&L will supply the transformer. Contractor is responsible for transformer pad, per DP&L standards. Contractor is responsible for conduit and secondarys.

9. The four conduits for the main service coming from the service pole to the building are not designated on the drawings to be rigid pipe or schedule 80 PUC. What is your requirements? ANSWER: Schedule 80 is acceptable.

10. Who is responsible for the charges that are incurred from the power company? ANSWER: Charges incurred from Power Company to be transferred to WCBOE. 11. ls all service equipment, breakers, disconnect switches to be manufactured by Square D

Company?

ANSWER: Square D is acceptable and will match existing conditions.

12. The main service on drawing EO-1 cannot be installed as per your drawing #1-. Are you going to supply a new drawing or are we responsible for coordinating with the A.H.J.? (authority having jurisdiction)

ANSWER: Revised drawing provided with Addendum #1.

13. The new main service is 1600 AMP 3 phase. The combined load of panel Pl- and Panel M could be up to 2000 amps without a main breaker is this going to be a problem for the main service feeders? Will this be a problem for the A.H.J.?

ANSWER: The existing load of Panel P1 is removed from Panel M. The combined load is 1600A. Main DC added per Addendum #1.

14. On Panel "M" directory note l- states to remove existing breakers and circuitry. Which ones are to be removed?

(3)

91036-213 Glen Ave HVAC Partial Replacement Addendum 1 –Page 3 of 3

15. Because the service is being increased is the door adjacent to the service acceptable as the second means of Egress out of this area?

ANSWER: Yes

16. I am confused by the panel notes on Panel P1" P1 is a new panel. How can we have existing to remain on a new panel? Please advise.

ANSWER: Panel P1 is existing. See Drawing EO.1 attached to Addendum #1.

I have included Addendum #1 in the attached proposal.

Signature _______________________________________ Name _______________________________________ Company _______________________________________ Date _______________________________________

Sign and return with Form of Proposal; OR Indicate on Form of Proposal; OR

Fax this form only to: Purchasing – 410-677-4418

(4)
(5)

References

Related documents

You must still complete the reimbursement application and submit the supporting documents within eight weeks of the course or seminar completion.. If pursuing a certificate

Madeleine’s “belief” that she is Carlotta Valdez, her death and rebirth as Judy (and then Madeleine again) and Scottie’s mental rebirth after his breakdown.. All of these

When the key policy tools are controlled for, centralisation of the benefit and support assessment service and timely vocational rehabilitation were found to be strongly

foss.in Indian's Premier FOSS Event – December 2007 | 30. Demo I: Addon with

Army Lodging Services Division Management Development Program, State College, PA, December, 2003..

Included in the review because the study was conducted in acute settings involving patients with older people Ericksson and Saveman 2002 Nurse’s experiences of

as measured by the DSM-5, and (2) whether two well- established psychosocial factors known to influence sub- stance use behavior, frequency of religious service atten- dance and

Algebraic Knowledge in Mathematics Learning 2.3.1 Algebraic Sense Need in Problem Solving 2.3.2 Algebraic Conceptual Knowledge 2.3.2 Algebraic Procedural Knowledge 2.3.4