Data Center

CH1

(2)

>

powerful/

efficient

/reliable

solutions

(3)

Committed to ultimate reliability, DFT’s philosophy is to design, build, operate and manage highly dependable and environmentally efficient data centers. Our goal is to maximize Power Usage Effectiveness ("PUE") in all aspects of data center operations. Dynamic electrical distribution and flexible floor plans provide optimal solutions for our tenants. DFT commissions proven technologies, such as rotary UPS and evaporative chilled water systems, in configurations that maximize utilization of the data center design and infrastructure. Our engineering track record and expertise enable us to shorten the duration of construction and minimize costs which directly benefit our clients.

PHILOSOPHY

Located in the western suburbs of Chicago, CH1 is one of the Midwest’s most sophisticated and efficient data centers. The facility is constructed in two phases of 18.2 MW of Critical Load each. Clients are able to lease one or multiple dedicated computer rooms each with independent redundancy and security. The property has multiple major fiber carriers on site and benefits from some of the country’s most competitive power rates. Customers requiring substantial office space can utilize the adjacent and exclusive 32,000 square foot office building.

OVERVIEW

DFT is a leading owner, developer, operator and manager of wholesale data centers. Our highly advanced and secure facilities power, cool, and protect the computer servers of numerous enterprise and technology

companies. In conjunction with our operational expertise, we deliver uninterrupted service and ultimate reliability to our customers’ mission critical business applications.

ABOUT

DUPONT FABROS

TECHOLOGY

(DFT)

>

Data Center CH1

(4)

>

Data Center CH1: Specifications

PROPERTY

BUILDING DESCRIPTION

Location: Elk Grove Village, IL Acreage: 22.8

Building Size: 485,000 sq ft

Nearest Airport: O'Hare International Airport Utility Power: 34.5 kV

Parking: 400+ Number of Stories: 1 Loading Docks: 4 Dock Bays

CRITICAL POWER

DATA CENTER AREA DESCRIPTION

Total Megawatts: 36.4

Redundancy: N+2, Each Phase, plus additional Swing UPS which offers additional redundancy to either electrical system Raised Floor Area: 121,000 sq ft (Phase I), 109,666 sq ft (Phase II)

Number of Computer Rooms: 16 (Phase I), 15 (Phase II) Raised Floor Height: 42" under raised floor plenums Raised Floor to Ceiling Height: 15-20+ft

SECURITY

STAGING/TENANT OFFICE SP ACE

Building and Perimeter: Ballistic glass enclosed security check-in, front window areas and loading dock Security Guards: Staffed 24/7

Access Control: Electronic Security features with card key access and dual authentication with biometric readers CCTV: 24/7 surveillance of the interior/exterior of the facility

Office: 9 internal suites and 32,000 sf of adjacent office space Staging: 6 staging rooms (Phase I), 2 staging rooms (Phase II)

UPS SYSTEMS GENERA

TORS

HEAT REJECTION SYSTEMS (HV AC) ON SITE FUEL CAP

ACITY

FIRE PROTECTION STS/PDUS COMMUNICA

TIONS

Description: 32 Rotary power systems with 1,300 kW of critical output each Redundancy: N+2, Each Phase

Description: 32 diesel-powered engine generators with 2,250 kW capacity each Redundancy: N+2, Each Phase

Description: 16 centrifugal chillers with 1,150 Ton capacity each Redundancy: N+2, Each Phase

Chilled Water Storage: Two 500,000 gallon storage tanks for 24 minutes of continuous full load operation Storage Tanks: Four 50,000 gallon underground diesel storage tanks

Number of Hours: Nominal 55 Hours

Description: Conventional smoke detector and laser based incipient smoke detection systems and double interlocked

pre-action sprinkler system

STS Description: Dual input Static Transfer Switches (STSs) PDU Description: 300 kVA Power Distribution Units (PDUs)

POE: 4 separate network Points of Entry (POE) with diverse underground duct banks providing multiple entry points into

the facility

Conduits: Dedicated underground conduits to each computer room from multiple and diverse POEs Multiple Carriers: Available

Meet-Me-Room: Available

COMPUTER ROOM SPECIFICA TIONS

Phase 1: Critical Load: 18.2 MW

Rooms 1-3: Critical Load: 0.433 MW, Approx. Gross SF: 2,700 Rooms 4-13: Critical Load: 1.3 MW, Approx. Gross SF: 8,400 Rooms 14-16: Critical Load: 1.3 MW, Approx. Gross SF: 9,900 Phase 2: Critical Load: 18.2 MW

Rooms 18A-18B: Critical Load: 0.650 MW, Approx. Gross SF: 5,000 Rooms 17, 19-26: Critical Load: 1.3 MW, Approx. Gross SF: 7,300-8,900

(5)

Electrical/Mechanical Computer R

oom

Public Circulation

SP ACE ALL OCA TIONS Data/T elco Suppor t Administration/Office

D

at

a C

en

te

r C

H

1: Ma

p

PHASE 2 PHASE 1

DIESEL ENGINE GENERATOR (TYP

.)

AREA

WA

Y

UPS UNIT (TYP

.) SWITCHBOARD (TYP .) AREA WA Y MECH. RM. STOR .

CENTRIFUGAL CHILLER (TYP

.) TR ANSFORMER POE MECH. RM. MECH. RM. MECH. RM. BR . RM. BR . RM. BR . RM. COMP UTER ROOMS 1-16 COMP UTER ROOMS 17-28 STOR . SNOW MEL T FP/PL RM. LOADING DOCK OFFICE 6 19 7 1 2 3 4 8 5 10 11 12 14 15 16 13 17 18A 19 20 21 22 18B 23 24 25 26 28A 28B 27A 27B MECH RM. LOB. LOB. BR . RM. W. M. W. M. W. M. OFF . ELEV . OFF. OFF . MECH RM. OFF . OFF . SECOND FL OOR FIRST FL OOR MMR X X ELEV . OFFICE POE CORRIDOR SEC EQ CORRIDOR MECH RM. CORRIDOR POE AREA WA Y AREA WA Y STOR . POE TELE/COMM MECH RM. MECH. RM. MMR OFF . CON.

(6)

For more information please contact

leasing@dft.com

1212 New York Ave., NW Suite 900 Washington, DC 20005 P 202.728.0044 F 202.728.0220 www.dft.com NYSE: DFT

References

Related documents

Elkhart, IN 46516 Applicant Enviro-Dynamics, Llc Business: (219)310-4722 Home: (219)313-4135 Residential Sq Ft: Accessory Sq Ft: Comm/Manuf Sq Ft: Agricultural Sq Ft: Non Building

By drawing on a recent research project, we illustrate how traditional boundaries between research and clinical practice are becoming increasingly blurred and how in turn, this

Eccleston Yards Eccl es to n P lace Te rra ce # 1 Terrace #3 Terrace #2 Lift Plant Deck Service Lift Restaurant space Extract Extract contact flythrough. overview victoria

– CCA: two facilities totaling 131,200 sq ft and 13 lines – System Integration: four facilities totaling 340,500 sq ft – Cable Assembly: two facilities totaling 220,000 sq ft

Rationale: Benztropine is an anticholinergic drug administered to reduce extrapyramidal adverse effects in the client taking antipsychotic drugs.. It works by restoring the

Release 8 Release 99 Routing Area Radio Admission Control Random Access Channel Remote Access Dial-In User Service Routing Area Identity Radio Access Network Radio Access

The registered person must ensure that there is effective management and storage of the flexible laryngoscope in line with national guidance and best practice to ensure safe

In a test of independence for a contingency table, we test the null characteristics of the elements of a given population are not related that they are independent) against the