Data Center Infrastructure Management (DCIM)

N/A
N/A
Protected

Academic year: 2021

Share "Data Center Infrastructure Management (DCIM)"

Copied!
48
0
0

Loading.... (view fulltext now)

Full text

(1)

D

ata 

C

enter 

I

nfrastructure 

M

anagement 

(DCIM)

Fergus Wong

(2)

Cloud

Cloud

Data Center

management

Data Center

(3)

A

Always increases

efficiency

A

No need to worry about

power

and

cooling

A

High

density

and high

efficiency

cannot coexist

A

Requires high

density

data centers

(4)

Server

Virtual Applications Capabilities

¾

Power

off/on as needed

¾

Move

to larger compute resources

¾

Consolidate

to select servers

¾Save Energy ¾Disaster Recovery Vapp 1 V App 2 V App 3 V App 5 V App 4

Impacts and Challenges of

Virtualization

(5)

Impacts

and

Challenges

of Cloud

Computing

(6)

Virtualization drives up

power

densities

at a rack level

Cooling challenge

●Per tile

airflow

of 300 cfm hard to maintain

●Raised flooring and perimeter cooling not the right choice

Power distribution Challenge

●Need

new

breakers

●New

voltage supply

levels

Weight-bearing capacities should be reviewed

Power Density

Increase

Challenge

(7)

Dynamic

Cooling / Power

BEFORE virtualization Constant loads Æ Stable cooling AFTER virtualization High-density loads Æ Burst-high heat Unpredictable cooling

Challenge

2

(8)

Speed

of

provisioning

new

"servers" is super fast

● Need agile infrastructure to cope

●Need to take location of Cloud into consideration

● Pick an area that's

easier/cheaper to expand Virtual  server N Physical  Host Virtual  server 1 Virtual  server 2 Virtual  server N Cooling Power Virtual  server 3 Virtual  server N

Challenge

3

Rapid

Scalability

(9)

●Data center physical infrastructure should be designed based on the

fault-tolerant

nature of

cloud-based IT model

● redundancy is less important on the physical infrastructure side if the IT is highly fault tolerant.

● Instead of 2N that would be used in a traditional, non-virtualized data center, an N+1 architecture may make more sense

Challenge

4

Availability

Architecture

(10)

Challenge

5

Virtualization

Operations

Virtualization

Virtualization

Management

Management

Physical

Physical

Infrastructure

Infrastructure

Management

Management

(11)

Solutions

Solutions

(12)

What’s the Solutions?

Challenge

Solution

Power Density Increases Containment and High Voltage Distribution

Dynamic Power and Cooling Planning and Implementation Software

Rapid Scalability Scalable Power and Cooling

Availability Architecture Design to Pods to Need (2N, N+1, etc.)

Virtualization Impacts Operations

Simulation and

Capacity Management Tools

3

(13)

And now we are adding …

Integrated management software systems that add a layer of Energy 

Intelligence to EcoStruxure solution architectures.

Integrated management software systems that add a layer of Energy 

Intelligence to EcoStruxure solution architectures.

Struxure

Ware

for …

StruxureWare

for data centers

Struxure

Struxure

Ware

Ware

for data centers

for data centers

Struxure

Ware

for green buildings

Struxure

Ware

for industry TM

S

truxure

Ware

(14)

Data Center Infrastructure

Power | Cooling | Physical space | Security | Environment People Business logic Processes Software platforms OS | Apps | Virtualization IT hardware platforms Servers | Storage | Networking

Building automation

HVAC | Lighting | Transport | Security | Fire

Managing the layers

DCIM Layer

Building Management Network Management Layer Application Management Layer Business Management Layer

(15)

Data Center Management

Data Center Management

Collect

Î

Collect

Collect

Î

Î

heal thin ess min imize down time opera tion effic ienc y busi ness chan ge

IT

+

F

M

(16)

iPhone app. Android app.

StruxureWare for Data Centers:

Monit

Monit

o

o

ring

ring

Suite

Central

Capacity Change

StruxureWare for Data Centers:

Operations

Operations

Suite 3D Airflow Cluster Energy Efficiency Operations Energy Cost Mobile Insight Vizor workflow, workflow, M.A.C. M.A.C. Cost analysis Cost analysis to rack level to rack level plan , plan , optimize optimize rep ort ing rep ort ing past, past, now now HA, LB HA, LB

(17)

Operations Central vSphere

Ris

k !!

IT serve rs Î

Ou

t of

po

we

r su

ppl

y

less tha n an hou r!!

Ris

k !!

IT serve rs Î

Ou

t of

po

we

r su

ppl

y

less tha n an hou r!!

(18)
(19)

Qu

est

ion

!!

Wh

ere

?

to be m igrated

Qu

est

ion

!!

Wh

ere

?

to be m igrated

(20)
(21)

The Market

The Market

(22)

DC management business

globally

globally

(23)

When

IT

IT

(24)
(25)

Combining Schneider and IT vendors

Facility

Facility-

Facility

-aware

aware

IT

IT

IT

(26)

IT Integrations – Virtualization

• Microsoft

。 System Center Virtual Machine Manager 2008

• VMware

Vcenter, VsphereTM

IT Integrations – System & Energy Management

• Microsoft

。 System Center Operations Manager 2007 (and Lite)

• IBM

。 Tivoli

。 Active Energy Manager

• HP

。 Operations Manager for Windows

(27)

Networking Integration – Energy Management

• Cisco

。 EnergyWise

Schneider Electric EcoStructure alliances

• SquareD

。 PowerLogic Meters, PowerLogic ION Enterprise

Alliance Partners and Integrations

coming 2012

(28)
(29)

Microsoft (MTC) Taipei, Dallas, Chicago,

Paris, Beijing, …

(30)
(31)
(32)

Hong

Kong

Hong

Kong

co-partner events

(33)

DCIM business

in Hong Kong

(34)

DCIM maturity model

Level 5: Self  optimizing, autonomic Integrated software adjusts datacenter behavior and  resource use according to rules and data and service  requirements.  Level 4: Optimizing Multiple IT and infrastructure subsystems integrated; data  models used for prediction, service management, multiple  views, optimizing in near real time. Level 3: Proactive Datacenter equipment characteristics, location and  operational status tracked. Energy and environmental data  used to reduce risks, waste. Level 2: Reactive Software installed to monitor environment and equipment  power use. Ability to adjust cooling to demand. Level 1: Basic No integration; basic monitoring supplied with equipment.   Health and safety.

0%

5%

30%

80%

95%

market room to grow

market room to grow

Hong Kong

Solid foundation

(35)

Data Center Solutions

Data Center Solutions

Specialists / Partners / SIs

Specialists / Partners / SIs

Critical 

Facility 

specialists

Critical 

Critical 

Facility 

Facility 

specialists

specialists

I T

SI partners

I T

I T

SI partners

SI partners

(36)

Your

Your

(37)

Source : IDC, 2009

Spending doubled in 6 years

2004

(38)

Software ServicesServices

Installation, Commissioning, Educational, Entitlement etc.

Project management and Customization

Management

Management and Control

Automated management and control

Fault-tolerant (fail-over)

Decision support and information

management SoftwareSoftware

Asset management

• Inventory

Planning

• Scenario Analysis, Master plans

Change and Configuration management

• Execution of plans

Capacity and Energy management

• Maximizing capacity and energy optimization

Monitoring, Measuring and Alerting

Software

Software

Centralized monitoring

Alerting

Data Center Infrastructure Management (DCIM)

Our market is defined as Products (hardware & software) and Services focused on data center management, including:

Hardware

Hardware (pull-through)

Monitoring appliance

Power distribution units, environmental & security sensors

(39)

Another vendor to watch out for is Schneider Electric. Schneider Electric recently updated its DCIM software called

StruxureWare for Data Centers, consisting of

StruxureWare Central, Mobile, Capacity, Operations, Efficiency, Change, Energy Cost, and

Mobile

IDC believes that SE's DCIM solution is definitely one of the most advanced products on the market today.

Schneider has the scale,

brand, vision and penetration to take a leadership position in datacenter energy

management software; its size

is also helping it make important alliances.

StruxureWare for Data Centers is currently just one of several offerings in this market, but it has the potential to be a clear leader.

APC, A Market Leader in DCIM

Schneider Electric

Schneider Electric

Market Leader in DCIM

Market Leader in DCIM

Source: The 451 Group report “Datacenter Management & Energy-Efficiency Software” [July 2009]

Source: The IDC Group, IDC#225616 Datacenter Trends and Strategies: Vendor Needs and Strategies, IDC#225616, Volume:1, [Nov 2010]

(40)

Potential Available Market for StruxureWare for

Data Centers: Operations Suite till 2013

(41)

Potential Available Market for StruxureWare

for Data Centers: Operations Suite till 2020

(42)

Schneider Electric – IT Business – Your Name – Date

SALES

SALES

TOOLS

(43)

APC Software

Support Ecosystem

End-to-end Solutions

Quoting / Proposals Barrier removal Addressing customer concerns

Mission-Critical Support

Issue tracking and handling Root cause analysis Phone / email support

Service Task Force Service Bulletins

Ready-Set-GO!

Training & Certification Standardized procedures Best practice approaches Tools and methodologies

Service incubation

Continuous Improvements

Field feedback routing Feature request handling Custom development / integration Support Structure Community FAQ Kbase Forum Blogs Events

(44)

:: Enablement Tools

:: DCIM Blogs http://blog.schneider-electric.com/datacenter/categ ory/dcim/ :: Whiteboard Selling Why StruxureWare for Data Center :: Technical Videos

Getting Started and Configuration tutorial videos :: Whitepapers Reports and Solution Write‐up :: DCIM Forum http://www.apc-forums.com/forum.jspa?forum ID=38 :: Trainings + Certification

(45)

Read on...

WP 107: How Data Center Infrastructure Management 

Software Improves Planning and Cuts Operational 

Costs:

http://www.apcmedia.com/salestools/DBOY‐

8B8KKJ_R0_EN.pdf

WP 150: Power and Cooling Capacity Management for 

Data Centers:

http://www.apcmedia.com/salestools/NRAN‐

6C25XM_R1_EN.pdf

Datacenter Infrastructure Management Software by 

the451group:

http://www.the451group.com/dct/dct_detail.php?ici

d=1690

(46)

Sales Tools Supporting Launch

Training

● StruxureWare for Data Centers:

What’s New in 7.0?

● StruxureWare for Data Centers:

How to Sell

Presentations

● StruxureWare for Data Centers 7.0

Customer Facing

● One consolidated suite presentation – replacing the family presentations

StruxureWare Operations, Capacity,

Change, Energy Efficiency, Energy Cost, Insight & VIZOR

Service

● StruxureWare for Data Centers Software Configuration Suite

Statements of Work for each service activity

● Quick Sales Reference Sheet title StruxureWare for Data Centers Software Configuration Suite At A Glance

(47)

Graphical overview

Graphical overview of

power, cooling,

space, and network

on a weekly, monthly, or yearly basis. Capacity Overview Full capacity utilization overview on power, cooling, space, and network at a glance.

Barcodescan functionality Built-in

barcode scanner for easy identification of assets

Remaining capacity

Drill down view into any location or room and predictions of remaining capacity based on growth rate.

(48)

Make the most of

your energy™

References

Related documents

In other words, unlike iPads, Android tablets, or fully converged collaboration solutions, devices running Windows 8 integrate seamlessly into user work styles with

RaMP Data Center Manager is a complete data center infrastructure management (DCIM) solution that can manage everything from your IT infrastructure (virtual machines,

Note that the subsets in Figure 1 have either graphical user interfaces (GUI) or human machine interfaces (HMI) associated with them. Also note that the Dashboard subset is the

A trusted industry leader in smart infrastructure technologies, Emerson Network Power provides innovative data center infrastructure management solutions that bridge the gap

According to Emerson, the Trellis suite should not be considered a repackaging of existing IT products for DCIM – rather, the entire platform and each of the application

Data Center Infrastructure Management (DCIM) Monitoring and Modeling for the Future.. M+W

Based on calculations by Gartner the all-in cost of a ServersCheck environmental rack monitoring solution (sensors & DCIM software) costs only 0.05% or less of

This brings you to today – where your fragmentation symptoms have stopped further IT deployments and you realize that you must be able to visualize cooling and how it relates