Worship Facility Matching Grant Program

2010 Program Manual

(2)

 

TABLE OF CONTENTS 

1 INTRODUCTION  1.1  DEFINITIONS ... 4  1.2  PROGRAM GOALS ... 4  1.3  PROGRAM PARTICIPANTS... 5  1.3.1  PROGRAM MANAGER ... 5  1.3.2  SERVICE PROVIDERS ... 5  1.3.3  APPLICANTS ... 5  1.4  PROGRAM ELIGIBILITY ... 6  1.4.1  APPLICANT ... 6  1.4.2  FACILITY ... 6  1.4.3  SERVICE PROVIDERS ... 6  1.4.4  PROJECT ... 7  1.4.5  MEASURES ... 7  1.5  BUDGET, GRANTS, AND INCENTIVES ... 8  1.5.1  AVAILABLE BUDGET ... 8  1.5.2  GRANTS ... 8  1.5.3  INCENTIVES ... 8  2 PROGRAM PARTICIPATION  10  2.1  PROJECT PHASES ... 10  2.1.1  QUALIFYING PHASE ... 1110  2.1.2  PRE‐ASSESSMENT PHASE ... 11  2.1.3  APPLICATION SUBMISSION PHASE ... 12  2.1.4  GRANT REVIEW PHASE ... 13  2.1.5  INSTALLATION PHASE ... 15  2.1.6  POST‐INSTALLATION INSPECTION PHASE ... 16  2.1.7  GRANT PAYMENT PHASE ... 17  2.2  PROJECT DOCUMENTS ... 18  2.2.1  DOCUMENTATION SUBMISSION ... 18  2.2.2  NONPROFITWORSHIP MATCHING GRANT APPLICATION ... 20  2.2.3  501(C) (3) STATUS ... 21  2.2.4  ELECTRICITY USAGE WORKSHEET ... 21  2.2.5  COMERCIAL ENERGY AUDIT REPORT ... 21  2.2.6  PROJECT SAVINGS FILES ... 21  2.2.7  PROJECT BID OR QUOTE ... 22  2.2.8  GRANT NOTIFICATION LETTER ... 22  2.2.9  REQUEST FOR MODIFICATION, EXTENSION, OR CANCELLATION ... 22  2.3  PROJECT MILESTONES ... 22  3 ADDITIONAL INFORMATION  23  3.1  CONFIDENTIALITY ... 23  3.2  PARTICIPATION COSTS ... 23  3.3  SUBMISSION OF FALSE INFORMATION ... 23  3.4  COMPLIANCE ... 24 

(3)

3.5  MISCELLANEOUS ... 24  4 APPENDIX A: GLOSSARY  25  5 APPENDIX B: PROJECTS AND UPGRADES  28  6 APPENDIX C: INSTALLATION STANDARDS  29  7 APPENDIX D: COOLING EQUIPMENT TABLES  31  8 APPENDIX E: DUCT EFFICIENCY  40  9 APPENDIX F: SOLAR PHOTOVOLTAIC  43  F.1  OVERVIEW ... 43  F.2  ELIGIBILITY ... 43  F.3  DEEMED SAVINGS (TAC 25.184(D)(1) ... 43  10  10 APPENDIX G: LIGHTING EFFICIENCY  46  11  11 APPENDIX H: WINDOW FILM  48  12  12 APPENDIX I: ENERGY STAR® ROOF  53  I.1  OVERVIEW ... 53  I.2  PRE‐RETROFIT PROJECT SAVINGS FILE ... 53  I.3  POST‐RETROFIT PROJECT SAVINGS FILE ... 54  I.4  CALCULATION OF ENERGY SAVINGS ... 54  13  13 APPENDIX J: PSF INCENTIVE FILE FORM  55         

(4)

 

1  INTRODUCTION 

Oncor Electric Delivery Company LLC (“Oncor”) is a regulated electricity transmission and  distribution company that provides the essential service of delivering electricity safely, reliably and  economically to end‐use consumers through its distribution systems, as well as providing  transmission grid connections to merchant generation plants and interconnections to other  transmission grids in Texas.  Oncor operates the largest distribution and transmission system in  Texas, delivering electricity to approximately three million homes and businesses and operating  more than 117,000 miles of transmission and distribution lines.  The Oncor 2010 Worship Facility Matching Grant Program (the “Program”) was developed by Oncor  to provide an incentive to Worship Facilities and Faith‐based Organizations (“Applicant(s)”) to  implement approved electric energy efficiency and/or qualified renewable energy projects at  facilities served by Oncor.  As a result of the Program, eligible Applicants can receive matching  grants from Oncor totaling up to 50% of the installation costs of certain energy efficiency and/or  renewable energy upgrades (but not to exceed $100,000). This Worship Facility Matching Grant  Program 2010 Program Manual (“Program Manual”) is intended to inform both Applicants and  contractors that install energy efficiency and/or renewable energy upgrades (“Service Providers”) of  the Program requirements and processes.  Those Service Providers that have an approved  application in any one of Oncor’s other existing energy efficiency programs at the time an  Application is submitted will be a Qualified Service Providers.  Qualified Service Providers are able to  market, sell and install Energy Efficiency Measures.  Oncor is not directly involved in the sales or installation of energy efficiency and/or renewable  energy services to its customers.  Unique to the Program, Oncor offers incentives for peak demand  reductions and energy savings directly to the Applicant, not the Service Provider. Incentives in the  Program take the form of a grant award to Applicants or an incentive payment to Qualified Service  Providers Oncor may generally educate potential Applicants, all Service Providers, and the public  about the Program, but will not directly market any specific energy efficiency‐related product or  service to its customers.   

1.1

DEFINITIONS 

See Appendix A at the end of this Program Manual for a complete list of definitions of program  terms contained within. 

1.2

 PROGRAM GOALS 

The Program is designed to assist Applicants with improving the energy efficiency of their facilities. A  total of $3.8 million in matching grant funding will be made available to Applicants through 2012 for  the installation of energy efficiency and/or renewable energy upgrades.   

(5)

The primary objective of the Program is to achieve cost‐effective reduction in demand during the  on‐peak summer period.  Additionally, the Program is designed to do the following:  • Encourage private sector delivery of energy efficiency products and services.  • Achieve customer energy and cost savings.  • Significantly reduce barriers to participation by streamlining program procedures and  measurement and verification requirements.  • Encourage participation by a wide range of Service Providers. 

1.3

PROGRAM PARTICIPANTS 

The Program involves three primary participants: the 1) Program Manager (Oncor), 2) Service  Providers, and 3) Applicants. 

1.3.1

PROGRAM MANAGER  The Oncor Program Manager’s responsibilities include:  • Conducting workshops for potential Service Providers.  • Reviewing, approving, and/or rejecting all program documentation.  • Performing certain inspection activities.   • Authorizing and issuing grant payments to the Applicant.  • Authorizing and issuing incentive payments to Qualified Service Providers. 

1.3.2

SERVICE PROVIDERS  A Service Provider’s responsibilities include:  • Conducting marketing activities to potential Applicants.  • Attending workshops and meetings as may be required by Oncor.   • Assisting the Applicant in completing the Application.   • Submitting complete Project Savings File(s) (“PSF(s)”) and other required supplemental project  information.  • Completing the installation of approved Projects as required.  • Submitting project documentation in accordance with the program procedures and deadlines.   • Submitting any additional information when requested for measure verification.  

1.3.3

APPLICANTS  An Applicant’s responsibilities include:  • Committing to an energy efficiency and/or renewable energy Project.  • Completing the Application and submitting all supporting program documentation. 

(6)

• Providing Oncor, and any statewide measurement and verification contractor or other inspector  designated by Oncor, access to the project site both before and after project completion for  installation inspection, as determined by Oncor in its sole discretion. 

1.4

PROGRAM ELIGIBILITY 

1.4.1

APPLICANT  Worship organizations must meet the following requirements in order to be eligible for  consideration of matching grant funding:   • Meet the IRS guidelines for 501(c)(3) tax exemption status.  • Be organized and operated exclusively for religious or faith‐based purposes.  Those  501(c)(3)  organizations that are organized and operated exclusively for educational, scientific or other  charitable purposes should refer to the program manual and program guidelines for the Oncor  2010 Nonprofit Facility Matching Program. 

1.4.2

FACILITY  Only worship facilities that meet the following eligibility requirements will be considered for  matching grant funds:  • Receive service from Oncor as evidenced by the Electric Service Identifier (ESI ID) number on the  Applicant’s electric bill. The ESI ID number is a 17‐digit number. If the third through seventh  digits are “44372”or”17699,” then this account is serviced by Oncor. Example: 10 44372 000  1234567.  • Be owned by the Applicant or, if the facility is leased or donated, the electric bill must be the  sole responsibility of the Applicant. 

1.4.3

SERVICE PROVIDERS  Qualified Service Providers in good‐standing in any one of Oncor’s existing Energy Efficiency  Programs are eligible to participate in the Program.  It is the responsibility of the Applicant to choose  a Qualified Service Provider or Service Provider to install Energy Efficiency and/or Renewable Energy  Measures for the facility that is the subject of the Application.    Only Qualified Service Providers that are active, and in good‐standing with one of Oncor’s existing  Energy Efficiency Programs, are eligible for the Project Savings File Incentive (as discussed in Section  1.5.3 of this Program Manual).  To become a Qualified Service Provider a Service Provider must first  apply and be accepted into any one of Oncor’s other Energy Efficiency Programs.  For more details  on Oncor’s existing Energy Efficiency Programs, visit www.takealoadofftexas.com.  Eligible Qualified Service Providers and Service Providers may include:  • National or local energy service companies 

(7)

• Retail Electric Providers  • National or local companies that provide energy‐related services (e.g., contracting) or  products (e.g., lighting, HVAC equipment) 

1.4.4

PROJECT  A “Project” is a set of proposed energy efficiency and/or renewable energy upgrades at an eligible  facility. For a detailed list of eligible Projects see Appendix B.  Proposed upgrades or Projects not  listed in Appendix B of this Program Manual will be evaluated for Program eligibility by Oncor on a  case‐by‐case basis.  Below are the criteria that upgrades in an eligible facility must meet in order to be considered for  matching grant funding under the Program:  • Produce savings through an increase in energy efficiency.  • Produce a measureable and verifiable electric demand reduction during the peak summer  period or must reduce overall energy consumption.  • Be installed in a retrofit application.  • Exceed minimum equipment standards.   • Exceed minimum state and local building standards.  There are no minimum project sizes in the Program.  The maximum project size is determined by the  size of the grant awarded to an Applicant.   

1.4.5

MEASURES  Additional Energy Efficiency Measures in small commercial and commercial applications that reduce  electric energy consumption and/or system on‐peak demand at the Applicant’s site(s) could also be  eligible for matching grants under the Program.  Contact the Oncor Program Manager with  questions or concerns on eligibility of specific Measures not listed in Appendix B.  Eligible Energy  Efficiency and/or Renewable Energy Measures do not include repair or maintenance activities or  behavioral changes.  A list of minimum installation and efficiency standards is provided in Appendix  C of this Program Manual.  All energy and peak demand reductions must also be measurable and  verifiable.  If any of the proposed Energy Efficiency Measures have been installed prior to Oncor’s written  approval of the Application, such previously installed Energy Efficiency and/or Renewable Energy  Measures shall not be eligible for grants or incentives under the Program.    Oncor shall determine,  in its sole discretion, whether any particular Energy Efficiency Measure is eligible for grants or  incentives under the Program.     

(8)

1.5

BUDGET, GRANTS, AND INCENTIVES 

1.5.1

AVAILABLE BUDGET  Oncor has assigned an incentive budget for the Program of approximately $3.8 million to be spent  on Energy Efficiency and/or Renewable Energy Measures and the implementation for worship  facilities serviced by Oncor until 2012.  $614,076 of this amount has been allocated to the Program  for 2010.  Oncor will provide grants and incentives related to completed, approved Projects until the  Program budget for the year is exhausted. 

1.5.2

GRANTS  For the 2010 program year, the available, aggregate matching grant fund for all projects is $614,076.   Each matching grant award is designed to cover up to half of the energy efficiency costs incurred by  an Applicant to purchase and install an approved, completed Project’s energy efficiency and/or  renewable energy upgrade(s).  The outstanding balance to fund completion of each Project will need  to be secured by the Applicant from sources other than the Program or Oncor and outlined in the  Application as additional funds.  A facility is defined to be a single building and any directly connected buildings.  An Applicant may  apply for multiple matching grants during a program year for energy efficiency and/or renewable  energy upgrades for different facilities.  • Only one (1) matching grant will be awarded per facility per year, up to 50% of the total  project cost, but not to exceed $100,000.    • A matching grant can be used only to pay for the direct purchase and installation of the  approved energy efficiency.   • The matching grant will be issued to the Applicant only after receipt of all project‐specific  completed PSFs and verification of the installation of the energy efficiency and/or  renewable energy upgrade(s) conducted by Oncor.   • The final matching grant amount paid to the Applicant will be calculated based on the  verified kW and kWh savings of the energy efficiency and/or renewable energy upgrade(s)  installed at the facility. The kW and kWh savings will be verified by reviewing support  documents submitted at project completion and by site Inspections conducted by Oncor.  Notifications of grant award amounts are through the Matching Grant Notification Letter.  Once a  Project has been successfully completed and verified by Oncor, it could take up to four (4) weeks for  an Applicant to receive a matching grant payment.  

1.5.3

INCENTIVES  For the 2010 program year, the available Project Savings File Incentive (“PSF Incentive(s)”) budget is  $2,900. 

(9)

Oncor will pay active Qualified Service Providers a fixed incentive of $100 per Project that is  accompanied by a completed Application.  (Note: One Project could require multiple PSFs based on  the number of Measure(s) included in the Project).  The following guidelines will be used to  determine payment of the incentive:  • Only Qualified Service Providers in good standing with one of Oncor’s Energy Efficiency  Programs are eligible for the PSF Incentive.  • Service Providers that are interested in becoming Qualified Service Providers are required to  apply, and be accepted, into one of Oncor’s other Energy Efficiency Programs.  Visit  www.takealoadofftexas.com for more details on the various programs and the  requirements.   • An incentive will be paid on only one (1) complete project submission per Application. If a  proposed Project has multiple Measures, measure‐specific PSFs are required for all  corresponding Measures.  •  PSF(s) submitted with a completed Application will be eligible for an incentive payment.  • No incentives will be paid for incomplete, misleading, or inaccurate PSFs.  • If a Qualified Service Provider has been locked out and/or terminated from one of Oncor’s  other Energy Efficiency Programs during the program year, the Qualified Service Provider is  no longer eligible for incentive payments in the Program.   • PSF Incentives will be paid based on the date Oncor receives the complete submission (hard  copy with Application, electronic copy with PSF Incentive Form and Invoice).   The PSFs will not be considered an Invoice for payment of incentive funds.  The Qualified Service  Provider must submit an Invoice to Oncor for payment.  The Project Savings File Incentive Form in  Appendix J is required with the Invoice submission.  Oncor will decline payments for duplicate  submissions to the same Project.  Upon successful receipt of an Application, PSF(s), and all  supporting documentation, Oncor will determine in its sole discretion whether a Qualified Service  Provider should receive a PSF Incentive.  Once the Invoice is received, it could take up to four (4)  weeks for a Qualified Service Provider to receive payment or notification that payment has been  denied.       

(10)

2

2  PROGRAM PARTICIPATION 

This section provides information on participating in the Program including the program phases,  required submittals, and milestones.  Oncor will open the Program on May 7, 2010, and allow the  immediate submission of Projects. Oncor will continue to allow submissions until the budget is  exhausted.   

2.1

PROJECT PHASES 

In the following Figure 2.1: Worship Facility Matching Grant Project Phases a flowchart shows the  various project phases of the Program.    There is a phase‐specific checklist at the end of each segment description to guide Applicants,  Qualified Service Providers, and Service Providers through each phase of the Program.    The  checklist includes suggested task owners, a description of the tasks, and an area to apply the time  and date the task was completed for your records.    Figure 2.1: Worship Facility Matching Grant Project Phases         

(11)

2.1.1

QUALIFYING PHASE  The Qualifying Phase is considered the phase of the Project when the Applicant, and any  Service  Providers are assisting the Applicant in determining if the Applicant, facility, Project, and  proposed  Measures are eligible for a matching grant from Oncor.  The following should be confirmed during  this project phase:  QUALIFYING PHASE CHECKLIST

 

Owner  Task  Complete 

(date)  Applicant  Confirm that the Applicant meets the eligibility requirements  listed on Page 6 of the Program Manual.    Applicant and/or  Service Provider  Confirm that the facility meets the eligibility requirements  listed on Page 6 of the Program Manual.   

2.1.2

PRE‐ASSESSMENT PHASE  The Pre‐Assessment Phase is the project phase where the Qualified Service Provider, or Service  Provider, and the Applicant are determining the scope of the proposed Project.  Time should be  taken to benchmark the facility and determine which Projects are most suited to the goals of the  Applicant.  The Applicant can use the Electricity Usage Worksheet in Appendix B of the 2010 Worship Facility  Matching Grant Program Application and Guidelines packet on the Program Web site. This form  helps the Applicant to determine if the facility is classified as a “small commercial” or “commercial”  facility.  To utilize this worksheet the Applicant will need to have the facility’s past twelve (12)  months electric bills. (See Section 2.2.4 for additional instruction.)    The following should be confirmed during this project phase:  PRE‐ASSESSMENT PHASE CHECKLIST 

Owner  Task  Complete 

(date)  Applicant or Service  Provider  Collect the past twelve (12) months of electric bills for the  facility. Complete the Electricity Usage Worksheet in  Appendix B of the 2010 Worship Facility Matching Grant  Program Application and Guidelines packet on the Program  Web site.  The results of this form will classify the facility  type.      IF THE FACILITY IS CLASSIFIED SMALL COMMERCIAL  Service Provider  Schedule and complete a Facility Pre‐Assessment using the  pre‐retrofit portion of the Project Savings File(s) located on  the Program Web site.    

(12)

Applicant and   Service Provider  Review the results of the Facility Pre‐Assessment and the  pre‐retrofit portion of the Program Savings File(s) to select  the desired upgrade(s) to be included in the Application. If  unsure what upgrade(s) are eligible, see Appendix B or  contact the Oncor Program Manager.      Applicant and   Service Provider  Confirm that the Project meets the eligible Projects listed in  Appendix B or submit to Oncor for approval.    IF THE FACILITY IS CLASSIFIED COMMERCIAL 

Applicant  Visit www.takealoadofftexas.com to apply for the  Commercial Energy Audit Program for a full energy  assessment for the commercial facility.      Applicant   Once the energy audit has been completed, select a  Qualified Service Provider or Service Provider to complete  the pre‐retrofit portion of the Project Savings File(s) for the  Measure(s) to be included in the Application.    Service Provider  Review the Commercial Energy Audit Report and complete  the pre‐retrofit portion of the coordinating PSF(s) applicable  to the proposed Project.    Applicant and/or  Service Provider  Confirm that the Project is an eligible Project listed in  Appendix B or submit to Oncor for approval.   

2.1.3

APPLICATION SUBMISSION PHASE  During the Application Submission Phase, the Applicant will be gathering all documents to submit  for review by Oncor.  During this process, there are many task owners.  The checklist below is for  both commercial and small commercial classified facilities.    Applicants for the Program must submit a completed Application and all supporting documents,  along with PSF(s) with pre‐retrofit portion(s) completed.  Oncor will notify the Applicant of its  application status within ten (10) business days after Oncor’s of receipt of the hard copy of the  completed Application, PSF(s), and all supporting documentation.    All hard copies of applications, forms, reports,  and supplemental documentation, as required for  each Project, must be sent by U.S. Postal Service or other overnight mail services and must be  addressed to the following (Oncor will not accept hand‐delivered information):  Oncor     Attn: Carmen Miestchovich, Program Manager  1601 Bryan St., Suite 21‐090D  Dallas, TX 75201  Phone: 214‐486‐4625   Fax: 214‐486‐7300  E‐mail: [email protected] 

(13)

It is the sole responsibility of the Applicant, Qualified Service Provider, and/or Service Provider to  ensure that Oncor receives all of the required project documentation by close of business on the  applicable due date.  Applicants should retain proof of delivery for all project materials submitted.  Hard copies of incomplete Applications and PSFs received will not be processed for review by Oncor.     The following should be confirmed during this project phase:  APPLICATION SUBMISSION PHASE CHECKLIST 

Owner  Task  Complete 

(date)  Applicant   Complete and sign the 2010 Worship Facility Matching Grant  Program Application.    Applicant  Assemble a copy of IRS documentation to show proof of  501(c)(3) status (i.e., I‐990 or IRS Determination Letter of  Ruling).    Applicant   Assemble signed hard copy of all PSF(s) including facility  photos.  (NOTE: There should be one completed PSF for each  Measure in the proposed Project.)     Applicant and  Service Provider  Include an original, signed bid or quote from the selected  Service Provider.    Applicant  Review all application documents for completeness and mail  to Oncor for review.      Service Provider  Submit electronic copy of all PSF(s) that have been  submitted in the application packet by the Applicant.  (NOTE:  Qualified Service Providers ‐‐ Submit an electronic copy of the  PSF Incentive Form, Invoice, and all PSF(s) associated to the  Project.)        IF THE FACILITY IS CLASSIFIED “COMMERCIAL”  Applicant  Include a copy of the Commercial Energy Audit Report in the  application submission.    Oncor Program  Manager  Contact the Applicant once all documentation has been  received.    

2.1.4

GRANT REVIEW PHASE  During the Grant Review Phase, the Application, PSF(s), and accompanying documents are  submitted to Oncor; and the proposed project documents are reviewed for accuracy and  completeness.  If, in Oncor’s sole discretion, the Applicant and/or the Qualified Service Provider, or  Service Provider, has not provided sufficient information on which Oncor can make a reasonable 

(14)

determination of an Applicant’s submission of the Project, Oncor may reject any document or the  entire Project for the deficiencies in question.   The Oncor Program Manager will review all documentation prior to submitting any Projects to the  Oncor Grant Review Committee (“Committee”).  No Project will be submitted for review by the  Committee until all completed documents have been received in hard copy form by Oncor Program  Manager.  Applications will be submitted to the Oncor Program Manager who will present the Project to the  Committee.  If Oncor approves an Application, it will execute the Matching Grant Notification Letter  and deliver the document to the Applicant. The Matching Grant Notification Letter will detail  whether a grant award has been approved or denied.  Matching grants will be awarded on a monthly basis during each program year or until funds are no  longer available. Completed applications must be received at least fifteen (15) business days prior to  a scheduled Committee meeting.  The meetings are generally scheduled during the fourth week of  each month.  Applications received after the fifteen (15) business day timeframe will automatically  be rolled over into the next grant cycle for consideration.  The Program Manager will contact each  Applicant with timelines specific to the project Application.    The Committee reserves the right to make final matching grant awards based on the proposed  Projects that are most likely to achieve the goals and intent of the Program. All awards are subject  to successful Project completion and verification. Oncor reserves the right to decrease a matching  grant allowance if a Project does not demonstrate projected savings or deviates from the previously  approved Project specifications.  Projects are scored on the following criteria:  • Requested grant funds per proposed kW and kWh reduction.  • Project comprehensiveness.  • Project completion timeline.  • Availability of matching funds.  Oncor may reject an Application for any reason in its sole discretion, including if:  • The Application is received after the budget for the program year has been fully committed.  • The Applicant’s proposed Installation Phase cannot reasonably be expected to be completed  by November 15, 2010.   • Required submittals are not received by deadlines stated in this Program Manual. (See  Section 2.3: Project Milestones.)  • The Applicant, facility, Project, or Measure fails to meet program eligibility requirements.  • The Applicant, Qualified Service Provider, or Service Provider is found to have made material  misrepresentations in the Application, PSF(s), and/or any supporting program  documentation.  • The Applicant fails to comply with applicable federal, state, and local laws and regulations. 

(15)

• It is necessary due to changes that occur in laws or regulations directly affecting the  Program. 

The following should be confirmed during this project phase:  GRANT REVIEW PHASE CHECKLIST 

Owner  Task  Complete 

(date)  Oncor Program  Manager  Contact the Applicant with project‐specific grant review  timeline, cost‐effective scoring, and overall potential scoring  of the Project.  Discuss with Applicant any modifications to  project documentation that may or may not need to be  made prior to Committee submission.    Applicant and/or  Service Provider  If any modifications were required to the original application  documents (as discussed with the Oncor Program Manager),  the modified documents should be submitted to Oncor as  directed.    Oncor Program  Manager  Present proposed Project to Committee for evaluation.    Oncor Program  Manager  An official Matching Grant Notification Letter will be sent to  the Applicant.   

2.1.5

INSTALLATION PHASE  After the Application is reviewed by the Committee, the Applicant will receive a Worship Facility  Matching Grant Notification Letter (“Letter”).  The Letter will specify the total allowance awarded  and approved Energy Efficiency and/or qualified Renewable Energy Measure(s) or details as to why  the Application was rejected.  If any modifications, extensions, or cancellations to any previously  approved portion of the proposed Project occur after the Letter is sent, it is the responsibility of the  Applicant to notify Oncor.  Any changes to the Project are subject to review and possible  modification of the grant allowance at the sole discretion of Oncor.   The following should be confirmed during this project phase:  INSTALLATION PHASE CHECKLIST 

Owner  Task  Complete 

(date)  Applicant  Contract Qualified Service Provider, or Service Provider, to  complete the installation of approved Measures.    Service Provider  Install the upgrade(s) based on the agreement with the  Applicant.   

(16)

Service Provider  Complete and submit an electronic copy of the post‐retrofit  portion of the originally submitted PSF(s) with and the  necessary support documentation such as proof of project  cost, post‐project photos, and any additional data to the  Oncor Program Manager for initial review.  (Note: The pre‐ retrofit and post‐retrofit portion of the file(s) should be  completed at this point.)     Oncor Program  Manager  Review electronic PSF submission(s) for accuracy.  Contact  Applicant and/or Service Provider to discuss files.      Applicant and/or  Service Provider  Complete and submit a hard copy of completed PSF(s) with  necessary support documentation such as proof of project  cost, post‐project photos, and any additional data to the  Oncor Program Manager. (Note: The pre‐retrofit and post‐ retrofit portion of the file(s) should be completed at this  point.)    Oncor Program  Manager  Schedule Post‐Installation Inspection with Applicant and  Service Provider.   

2.1.6

POST‐INSTALLATION INSPECTION PHASE  During the Post‐Installation Inspection Phase, Oncor will perform Inspections of all project sites to  determine if the approved Energy Efficiency and/or Renewable Energy Measure(s) have been  installed properly and are capable of performing their intended function(s). The Qualified Service  Provider, or Service Provider, may be required to be on‐site during the Inspection.  All Energy  Efficiency and/or Renewable Energy Measures installed in the Program must conform to or exceed  the standards listed in Appendix C‐ I.  Measure‐specific deemed savings are contained in the  Appendices.  If Energy Efficiency and/or Renewable Energy Measures installed do not meet these  standards, they will not be eligible for matching grant allowance.      If Oncor determines that the Measures have been installed, tested, and inspected to the extent  required by Oncor and found to be capable of providing Peak Demand Savings and/or Energy  Savings in material compliance with the contract documents, the Project will be approved as  submitted.  Oncor reserves the right to reject any installed Energy Efficiency and/or Renewable Energy Measure  for any of the following reasons:  • Poor workmanship.  • Qualified Service Provider, Service Provider, or Applicant modification to the installed  Measure.  • Lack of UL Listing.  • Measure not operating correctly. 

(17)

• Measure or its installation poses a safety hazard.  • Measure or its installation poses an environmental hazard.  • Measure does not comply with local or state building codes.  • Measure does not comply with National Electric Code or National Electric Safety Code.  • Failure to comply with program requirements or any applicable laws or regulations.  After Inspections are completed, all installations will be evaluated on a measure‐by‐measure basis  to calculate an adjustment factor for energy efficiency savings and matching grant allowance.   In the event the Applicant disagrees with the payment adjustment, the Applicant may request that  all information be reviewed again after additional clarifying information is provided by the Applicant  and/or the Qualified Service Provider or Service Provider.  However, final payment adjustments will  be at the sole discretion of Oncor.  In the event the Inspection Report results in a failure, the Qualified Service Provider, or Service  Provider, will be given the opportunity to make the appropriate adjustments to the Project.  A  second Inspection will then be required to review the modifications.  The second Inspection will be  at the cost of $200 to the Applicant.   

 

POST‐INSTALLATION INSPECTION PHASE CHECKLIST 

Owner  Task  Complete 

(date)  Applicant and  Service Provider  Be available for the Post‐Installation Inspection and provide  access to the project site.    Inspector  Inspect project site and send results to Oncor Program  Manager.    Oncor Program  Manager  Review feedback from Inspector and make matching grant  adjustments, if necessary.    Contact Applicant with  inspection results.    Oncor Program  Manager  Submit Invoice for grant payment.  Contact Applicant with  proposed date the funds will be delivered.       

2.1.7

GRANT PAYMENT PHASE  For approved Projects, Oncor will pay the Applicant a matching grant award within four (4) weeks  after the date Oncor approves the post‐installation of the project Measures.  The amount of the  matching grant award shall be determined by Oncor in its sole discretion based on the results of the  Inspection. 

(18)

Notwithstanding anything in the Program Manual to the contrary, Oncor will make grant payments  and PSF Incentive Payments only to the extent funding remains available in the program budget at  the time the associated Application is approved by Oncor. 

2.2

PROJECT DOCUMENTS 

2.2.1

DOCUMENTATION SUBMISSION  Program Applications, forms, reports, and supporting documentation may be submitted any time  after May 7, 2010, but must be received by Oncor no later than November 8, 2010.  Hard copies of  all project documentation, and required accompanying documents, must be received by Oncor  within five (5) business days of any electronic submittals.  Oncor will not make any matching grant  payments for any Measure not included in a PSF(s).  The final passing Post‐Installation Inspection for  any approved matching grant Project must be received electronically by November 30, 2010, at 5  p.m., Central Standard Time.    All program Applications, forms, reports, and supporting documentation must be date‐stamped by  Oncor by the due date.  All program documents and supporting documentation must be sent by U.S.  Postal Service or other overnight mail services ‐‐ HAND‐DELIVERED DOCUMENTS WILL NOT BE  ACCEPTED.  Oncor may request clarification of, or additional information about, any item submitted as part of  the project documentation.  Applicant, Qualified Service Provider, and Service Provider must  respond to such requests within the time period specified by Oncor.  If the clarification or additional  information provided is not sufficiently responsive, Oncor may, at its sole discretion, request  additional information or discontinue its evaluation of the submittal. Any Applicant submitting an  unsuccessful Application may reapply for project funding by submitting another Application.   However, if an Applicant reapplies, it will be considered a new Application for the purpose of  determining submission order with respect to all other Applications.  The Applicant will lose the  initial position in the order of submittal for project funding purposes, if applicable.  Table 2.2: Worship Document Matrix 

Task Owner  Document Name  File Submission  Document Location 

Applicant  2010 Worship Facility  Matching Grant  Application     HARD COPY Worship Facility Matching  Grant 2010 Application and  Guidelines (Pg. 7‐12)  www.takealoadofftexas.com  Applicant  IRS I‐990  IRS Letter of  Determination  These documents show  proof  of 501 (c)(3) status  HARD COPY This document will need to  be provided from the  Applicant’s records. 

(19)

Applicant   Electricity Usage  Worksheet  HARD COPY Worship Facility Matching  Grant 2010 Application and  Guidelines (Pg. 14)  Appendix B   www.takealoadofftexas.com  Applicant  (COMMERCIAL  CLASSIFICATION)    Commercial Energy Audit Program Application   HARD COPY www.takealoadofftexas.com   Applicant  (COMMERCIAL  CLASSIFICATION)  Commercial Energy Audit Program Report  HARD COPY   The full Commercial Energy  Audit Report will be sent to  you after the commercial  energy audit has been  completed.  Applicant and  Service Provider  Project  Savings File(s) (Used during the Facility  Pre‐Assessment/Pre‐ retro‐ fit portion of the  file(s))    HARD COPY ( submitted by  the Applicant with Program  Application) ELECTRONIC  COPY (submitted by  Qualified Service Provider  with PSF Incentive Form  and Invoice)      www.takealoadofftexas.com   Service Provider  Project Savings File(s) (Used during the  Installation Phase/Post‐ retrofit portion of the  file(s) )    ELECTRONIC COPY  (submitted by the Service  Provider for initial review)  HARD COPY (submitted by  the Applicant and Service  Provider once reviewed by  Oncor)  Use the originally submitted  PSF(s) submitted with the  Application.  Applicant and  Service Provider 

Project Bid or Quote HARD COPY Will be provided by the  Service Provider of the  Applicant’s choice.    Program  Manager  Worship Facility Matching  Grant Notification Letter  HARD COPY Will be provided by the  Oncor Program Manager  once the Application has  been reviewed. 

(20)

Applicant   Request for Modification,  Extension, or Cancellation     ELECTRONIC  (submit request  electronically, then mail  HARD COPY within 5 days  of electronic submission)  Contact Oncor Program  Manager for this document.   

2.2.2

WORSHIP MATCHING GRANT APPLICATION  The Application is to be completed by the Applicant.  The Foundation, Qualified Service Provider, or  Service Provider, can assist the Applicant.  See the Program Web site for the Worship Facility  Matching Grant 2010 Guidelines and Application.   All sections of the Application must be completed prior to submission.  Section 1:  Contact Information  • Detailed information for the Applicant (primary point of contact) during the Project.  Section2: Facility Information  • Detailed information on the proposed project facility, including ESI ID.   • If there is more than one ESI ID number for the facility.  Remember to place all of the  numbers on the Application.  Section 3: Project Information  • Select all applicable Measures for the proposed Project.  Remember to include a PSF for  each Measure selected.  • Measure:  Include the type of Measures being proposed (i.e., T‐8 lighting, HVAC).  • Quantity:  Include the number of specific Measures being included (i.e., 27 light fixtures, 2  HVAC).  • Check the list of all applicable supporting documentation for the Project.  Section 4:  Project Savings  • The kW and kWh savings figures are the sum of the kW and kWh savings calculated on the  PSF file(s).  Section 5:  Customer Participation Agreement  • Applicant must read, sign, and return all parts of the Customer Participation Agreement with  the Application (Pg. 8‐11 of the Worship Facility Matching Grant 2010 Application and  Guidelines).  • Applicant must read, sign, and return the Worship Facility Matching Grant Program  Application‐Certification with the application submission (Pg. 12 of the Worship Matching  Grant 2010 Application and Guidelines). 

(21)

2.2.3

501(C) (3) STATUS  The Applicant is required to submit proof of IRS 501(c)(3) status with its Application submission.   Acceptable documents include a copy of the IRS I‐990 or Determination Letter.   

2.2.4

ELECTRICITY USAGE WORKSHEET  The Electricity Usage Worksheet in Appendix B of the Worship Facility Matching Grant 2010  Application and Guidelines is designed to assist Applicants in determining: 1) the customer  classification of the applicant facility; and, 2) the Applicant’s annual electric bill.    The Applicant will need to have the last twelve (12) months of electric bills.  From each bill fill in the  total cost per month as well as the total kW usage.  Once January‐December has been completed,  calculate the total of each column.  The “Total Bill ($$)” field is required for the Application.    If the kW usage in any of the grey (June‐September) fields is greater than 100 kW, the facility is  commercial.  Applicants for commercial facilities should complete the Commercial Energy Audit  Program Application for a comprehensive energy audit. 

2.2.5

COMERCIAL ENERGY AUDIT REPORT  Applications for facilities that have been classified commercial by the Electricity Usage Worksheet  will be asked to complete a comprehensive commercial energy audit.  The Application for this audit  is at www.takealoadofftexas.com/index.aspx?id=commercial‐energy‐audit.  If the Applicant has a  Commercial Energy Audit completed, all supporting PSF(s) are required with the Application  submission. 

2.2.6

PROJECT SAVINGS FILES  PSFs are used as the reporting tool for the Facility Pre‐Assessment as well as for the post‐installation  reporting.  The files are used to capture pre‐retrofit data (actual and proposed) and post‐retrofit  data (actual).  Initially, the PSF(s) support the Application in the proposed kW and kWh savings for the Project.    Remember, a PSF is required for each Measure type.    Examples of Project Savings Files   • Lighting   • Cooling  • Window Film  • ENERGY STAR® Roof  Once the installation of the Measure(s) is complete, the original PSF(s) should be used.  The post‐ retrofit portions of all files will need to be completed and submitted for review by the Oncor  Program Manager prior to printing hard copies for submission.  Once reviewed by the Oncor 

(22)

Program Manager, contact will be made with the Applicant and/or the Qualified Service Provider, or  Service Provider, as applicable, to schedule the Post‐Installation Inspection. 

2.2.7

PROJECT BID OR QUOTE  A detailed price bid or quote for the proposed Project is required with the submission of the  Application.  This price quote should be an itemized quote including equipment details and costs.   This document must be signed by the Applicant, Qualified Service Provider, and/or Service Provider.   

2.2.8

GRANT NOTIFICATION LETTER  Once an Application has been reviewed by Oncor, the Program Manager will contact the Applicant  with the outcome of the review.  A Matching Grant Notification Letter will be sent to the Applicant  including information specific to the proposed Project including, but not limited to, award or decline  status.   

2.2.9

REQUEST FOR MODIFICATION, EXTENSION, OR CANCELLATION  If there are any changes to the project equipment needs, a cause for delay in completion of the  approved Project, or a cancellation of installation of previously approved Measures, a Request for  Modification, Extension, or Cancellation is required.  The Request should be e‐mailed to  [email protected].   

2.3

PROJECT MILESTONES 

Table 2.3: 2010 Worship Facility Matching Grant Program Milestones   Dates  Description  May 7, 2010  Program opens for Application submission.  October 2010  Last month for Grant Review Committee to review Projects that can be completed  in program year 2010.  Applications can be submitted for subsequent program  years.  November 8,  2010  Last day to electronically submit any and all program Applications, forms,  or  supporting documentation for the Projects approved for completion in 2010.  November 15,  2010  Last day to have hard copies of all program Applications, forms, reports, or  supporting documentation delivered to Oncor by 5 p.m., Central Standard Time,  for the Projects approved for completion in 2010.  November 30,  2010  Last day to have a completed “passing” Post‐ Installation Inspection completed for  payment submission in 2010. 

(23)

3

3  ADDITIONAL INFORMATION 

Oncor may impose additional restrictions and qualification requirements on Applicants, Qualified  Service Providers, or Service Providers based on prior program participation. 

3.1

CONFIDENTIALITY 

Oncor’s Program is subject to oversight by the Public Utility Commission of Texas and the Texas  Legislature, which may request a copy of any Program materials that Oncor receives. Oncor may also  be required to disclose any documents pursuant to laws, regulations or legal process. Any  documents sent to the Public Utility Commission of Texas or the Texas Legislature or disclosed  pursuant to laws, regulations or legal process may be accessible by the general public. Oncor will  attempt to treat sensitive information submitted by the Applicant, Qualified Service Provider, or  Service Provider, such as financial statements and Project costs, confidential to the extent possible.   However, Oncor will not be liable to any Applicant, Qualified Service Provider, or other party as a  result of public disclosure of any information submitted pursuant to the Program. By submitting an  Application and/or attempting to participate in the Program, each Applicant, Qualified Service  Provider, and/or Service Provider understands and agrees that any information it provides to Oncor  could be publicly disclosed.  According to the State of Texas House Bill 698, businesses that dispose of records containing  personal information, must destroy or modify the record through shredding or other means that  renders the information unreadable. Applications, Qualified Service Providers, and/or Service  Providers are subject to these restrictions.   Personal information for purposes of State of Texas House Bill 698 consists of the customer’s name  and any one of the following:  • Customer identification number (premise number, meter number and/or ESI ID)  • Social security number (or government identification number)  • Drivers License number  • Address (physical or mailing)  • Documents 

3.2

PARTICIPATION COSTS 

Oncor will not reimburse any Applicant, Qualified Service Provider, or Service Provider for any costs  incurred by participating in the Program, including costs of preparing program documentation,  reviewing or executing program documents, or preparing and submitting any program reports. 

3.3

SUBMISSION OF FALSE INFORMATION 

Oncor reserves the right to discontinue its evaluation of all submittals from any Applicant, Qualified  Service Provider, or Service Provider who submits false, misleading, or incorrect information.  In the 

(24)

event Oncor determines it has received false, misleading or incorrect information, Oncor may deny  or terminate participation in the Program or any other Oncor Energy Efficiency Programs by the  provider of such information. 

3.4

COMPLIANCE 

Applicants and/or Qualified Service Provider, or Service Provider warrants and represents that the  Project meets all applicable federal, state, and local laws and regulatory requirements, including:  • The Project will result in Energy Savings and Peak Demand Savings and a reduction in energy  costs for the Applicant.  • The Project will result in consistent and predictable Energy Savings and Peak Demand  Savings over the Estimated Useful Life of the Measure.  • The Qualified Service Provider, or Service Provider, disclosed all potential adverse  environmental or health effects associated with the Measures to be installed, if any.  • The Project includes appropriate and adequate measurement, verification, and reporting  procedures.  • The Project does not achieve demand reduction by eliminating an existing function or  shutting down a facility or operation, or result in building vacancies or the re‐location of  existing operations to locations outside of the facility or area served by Oncor.  • Measures installed pursuant to the Project would not be installed in the absence of the  Project.  • The Project does not result in negative environmental or health effects, including effects  that result from improper disposal of equipment and materials.  • The Project does not involve the installation of self‐generation or cogeneration equipment,  but may involve renewable DSM technologies.  Applicants, Qualified Service Providers, and Service Providers shall keep and maintain accurate and  detailed records and documentation relating to the Project and its associated Energy Savings and  Peak Demand Savings for a period of not less than three (3) years beyond the termination of this  grant award.  During the retention period, such records shall be made available, upon reasonable  notice, for Inspection during normal business hours by Oncor or any governmental agency having  jurisdiction over the Program or any portion of the Project. 

3.5

MISCELLANEOUS 

Applicant and/or Qualified Service Provider, or Service Providers, shall not use Oncor’s corporate  name, trademark, trade name, logo, identity, or any affiliation for any reason, including soliciting  Worship Customers for participation in the Program, without Oncor’s prior written consent.     Applicants, Qualified Service Providers, and Service Provider may file a complaint against Oncor  concerning the Program with the Public Utility Commission of Texas. 

(25)

4

4  APPENDIX A: GLOSSARY 

Applicant shall mean an eligible worship organization that submits an Application for the 

Program and contracts with a Qualified Service Provider or Service Provider for the 

installation of Measures pursuant to the Project. 

Application: The Worship Facility Matching Grant Application, comprising a set of standard 

forms, is submitted by the Applicant in conjunction with the Project Savings File(s).  

Baseline is generally defined, for the purposes of determining estimated and measured 

energy savings for equipment replacement Projects implemented under the Program, as 

the energy consumed by equipment with efficiency levels that meet the applicable current 

federal standards and reflect current market conditions. The Baseline may be determined 

by the equipment or conditions currently in place under the following conditions: a) when 

federal energy efficiency standards do not apply, or b) when the existing equipment can be 

shown by Service Provider to have a remaining service life of at least fifteen (15) years. 

Conditioned space

: Cooled space, heated space, or indirectly conditioned space: 

Cooled

 

space

: Enclosed space within a building that is cooled by a cooling system whose  sensible capacity exceeds 5 Btu/ (h‐ft2) or is capable of maintaining a space dry‐bulb  temperature of 90° F or less at design cooling conditions. 

Heated

 

space

: Enclosed space within a building that is heated by a heating system whose  output capacity exceeds 10 Btu/ (h‐ft2) or is capable of maintaining a space dry‐bulb  temperature of 50° F or more at design heating conditions. 

Indirectly

 

conditioned

 

space

: Enclosed space within a building that is not heated or  cooled space, whose area‐weighted heat transfer coefficient to heated or cooled space  exceeds that to the outdoors or to unconditioned space, or through which air from heated  or cooled space is transferred at a rate exceeding three air changes per hour (see heated  space and cooled space). 

Deemed

 

Savings 

shall mean a pre‐determined, validated estimate of energy and peak demand  savings attributable to an Energy Efficiency Measure in a particular type of application that a utility  may use instead of energy and peak demand savings determined through measurement and  verification activities. 

Energy Efficiency Measures

: Equipment, materials, and practices that when installed and used at  a customer site result in a measurable and verifiable reduction in purchased electric energy  consumption, measured in kilowatt‐hours (kWh), or peak demand, measured in kilowatts (kW), or  both. 

Energy Savings

 shall mean the amount of annual (one‐year) electric energy reduction, expressed in  kilowatt‐hours (kWh), that result from the installation of Measures pursuant to the Project.  Energy 

(26)

Savings will be calculated based upon savings over and above standard efficiency equipment and  not in relationship to existing equipment, except in cases where no standards exist.  Equipment  standard efficiencies are ASHRAE 90.1‐1989, ASHRAE 90.1‐1999, ASHRAE 90.1M‐1995, and the  Oncor Standard Lighting Wattage Table.   

Existing Equipment

: The equipment that is installed at the customer’s site prior to the customer’s  participation in the Program. 

Incentive Payment

: Payments made to a Qualified Service Provider based on the successful  submission of the Project Savings File(s).     

Inspection

: On‐site examination of a Project to verify that a Measure has been installed and is  capable of performing its intended function.   

Peak Demand

 shall mean electrical demand at the time of highest annual demand on the utility’s  system, measured in 15‐minute intervals. 

Peak Demand Savings

 shall mean the maximum average load reduction occurring during any one‐ hour period between 1 p.m. and 7 p.m. weekdays, from May 1 through September 30 (federal  holidays excluded) that result from the installation of Measures pursuant to the Project.  Peak  Demand Savings will be determined by comparing the efficiency of the installed equipment to that  of an appropriate Baseline.   

Peak Period

: The hours from 1 p.m. to 7 p.m. weekdays, from May 1 through September 30  (federal holidays excluded). 

Program Documents

 shall mean i) Worship Facility Matching Grant Application and all supporting  documents; ii) Project Savings File(s), an example is at www.takealoadofftexas.com; iii) together  with any and all other exhibits, addenda, or amendments referenced in the Contract Documents or  made a part hereof in accordance with this Program Manual, as the same may be amended from  time to time.  To the extent of any conflict between this Program Manual and other Contract  Documents, the terms of this Program Manual shall prevail.   

Project

 shall mean all Measures installed by Qualified Service Provider, or Service Provider,  pursuant to the Applicant’s participation in the Program and reported on all program documents. 

Project Site

 shall mean the location of the Applicant’s facility where approved Measures will be  installed and from which Peak Demand Savings and Energy Savings will be obtained.  

Proposed Energy Savings

 shall mean the amount of Energy Savings proposed in Matching Grant  Application and all supporting program documents to be achieved by the Project, approved by  Oncor. 

(27)

Proposed Peak Demand Savings

 shall mean the amount of Peak Demand Savings proposed in  Matching Grant Application and all supporting program documents to be achieved by the Project,  approved by Oncor. 

Prudent Electrical Practices

 shall mean those practices, methods, standards, and equipment  commonly used in prudent electrical engineering and operations to operate electrical equipment  lawfully and with safety, dependability, and efficiency and in accordance with the National Electrical  Safety Code, the National Electrical Code, and any other applicable federal, state, and local codes  provided, however, that in the event of a conflict, the applicable federal, state, or local codes shall  govern. 

Qualified Service Provider

 shall mean any organization, group, or individual who installs Energy  Efficiency Measures or performs other energy efficiency services who maintain an approved SOP  agreement with Oncor to provide energy savings in any one of Oncor’s other Energy Efficiency  Programs.  

Renewable demand side management (DSM) technologies ‐‐ Equipment that uses a 

renewable energy resource (renewable resource), as defined in §25.173(c) of the 

Commission’s Substantive Rules (relating to Goal for Renewable Energy) that, when 

installed at a customer site, reduces the customer’s net purchases of energy, demand, or 

both. 

Service Provider shall mean

 any organization, group, or individual who contracts with the  Applicant to provide energy efficiency savings.   

Work

 shall mean any and all labor, evaluations, reports, and services, including all equipment,  material, duties, and obligations that are the responsibility of Qualified Service Provider or Service  Provider under this Program Manual. 

 

(28)

 

5

5  APPENDIX B: PROJECTS AND UPGRADES 

Worship Facility Matching Grant Program Eligible Upgrades 

Eligible Upgrades or Projects  Ineligible Upgrades or Projects 

Cooling Measures 

• High‐efficiency air conditioning  replacements  • High‐efficiency heat pump  replacements  • Duct sealing  • Fan and pump motor efficiency  upgrades  • Geothermal ground source heat  pumps   

Lighting Measures 

• Hard‐wired high‐efficiency fluorescent  lighting that replaces less‐efficient  lighting  • Lighting controls to reduce operating  hours (in conjunction with lighting  efficiency upgrades)  • CFLs with hard‐wired ballast  • T‐12 to T‐8 or T‐5 retrofits  • LED exit sign retrofits   

Core and Shell Measures 

• ENERGY STAR® Roofing  • Insulation  • Window film  • Solar Photovoltaic    • Measures that do not raise efficiency  above current standards  • Measures that do not surpass the  Program Measures Estimated Useful  Life  • Cogeneration and self‐generation  projects  • Load shifting/load management  measures  • Load reduction caused by building  vacancies, decreased production, or  other changes in occupant  characteristics or behavior  • Measures that rely solely on change in  customer behavior and require no  capital investment  • Measures for which incentives were  received under another Oncor  Program  • Repair and maintenance measures  • Energy‐efficient gas measures when  replacing non‐electric technologies  • Measures that result in negative  environmental or health effects 

 

(29)

 

6

6  APPENDIX C: INSTALLATION STANDARDS 

C.1 

GENERAL 

Equipment must exceed applicable federal energy standards adopted at the time the Service  Provider submits the Project Application.  No used or reconditioned equipment shall be qualified for incentives. All equipment shall be new.  Service Provider must follow all state and local building codes. Applicant, Qualified Service Provider,  or Service Provider shall be responsible for licenses, building permits and inspections. Any  fees/payments for licenses, building permits, and inspections shall be paid by the Applicant,  Qualified Service Provider, or Service Provider. 

C.2   DUCT EFFICIENCY 

Any Service Provider requesting funding for duct efficiency Measure must be a certified HERS Rater  or provide proof that he/she has attended and successfully completed a course implemented by a  RESNET Quality Assurance Designee. Also, a Service Provider must supply proof that at least one  employee on each site treated has successfully completed a course implemented by a RESENT  Quality Assurance Designee. An employee on each site treated must also have proof that the  employee has completed the above course if requested by Oncor and that it is in active status.   Service Provider will also be required to submit the manufacturer and model number of the outside  equipment for the duct system treated. Incentive payment is based on the system BTU capacity in  tons and the primary heating source.   All noticeable air leaks in a duct system should be treated. Obvious leaks left untreated in a duct  system can result in a failure even though 10% or less of airflow has been met.  See Appendix H for Measure‐specific deemed savings. 

C.3 

HVAC 

Commercial retrofit of an existing central air conditioning system with a new central air conditioning  system (packaged unit, or split system consisting of an indoor unit with a matching remote  condensing unit) is eligible. Maximum cooling capacity per unit is 250,000 BTU/hour.  See Appendix D‐G for Measure‐specific deemed savings. 

(30)

C.4 

FLUORESCENT FIXTURES 

Eligible only with complete new luminaries, hard‐wired ballast retrofits, or socket conversions.  Luminaries with cord and plug connected devices are not eligible for incentives.  See Appendix I for Measure‐specific deemed savings. 

C.5 

ELECTRONIC BALLASTS 

Electronic ballasts must have a THD of no greater than 20%.  Electronic ballasts must have a THD of no greater than 32% for luminaries having 5’ to 8’ lamps.  See Appendix I for Measure‐specific deemed savings. 

C.6 

FLUORESCENT LUMINARY RETROFITS 

T‐12 lamps and magnetic ballasts retrofitted to T‐8 lamps and electronic ballasts qualify.  Lamps must have a CRI of at least 75.  Lamps must be tri‐phosphor.  Relamping energy savings will be eligible only for incentives if done in conjunction with T‐8 lamps  and electronic ballast retrofits.  Unused lamps, lamp holders, and ballast must be removed from luminary.    Old lamps and ballasts must be disposed of in accordance with local, state, and federal  environmental laws.  See Appendix I for Measure‐specific deemed savings.   

References

Related documents