Engineering Information Management
Dan McClung – V I Engineering, Inc. General Manager
Engineering Information Management [email protected]
Delivering Test Solutions for 12 years
Automated Test and Measurement Systems
• National Instruments Select Alliance Partner
• Automotive, Life Sciences, Aerospace, Heavy Equipment, DoD • Durability Test, Functional Test
• From R&D, Design, Prototyping, and to Production • Detroit, Minneapolis, Indianapolis, Los Angeles
VISTA – Professional Software Engineering Practices
• Configuration and Project Management Tools • LabVIEW Productivity Tools
• Process Consulting
Objectives:
•To define EIM and the problem set it addresses
•To present use cases illustrating how companies
have benefited from EIM solutions
•To offer ideas on how to implement an EIM
solution and explain the high ROI possible with
these solutions
Costs of Ineffective Data Management
“
Highly paid people are spending too much
time going through stuff”
- AMR Research Analyst 2002Facts
• Employees spend an average of 2.5 hours per day searching for data • 35-50% of information available is not centrally indexed
• A Group of 5 people, each paid $75,000 per year, will spend over
$100,000 per year searching for data
Engineering Information
Management
Promoting efficiencies throughout the design and testing process
– Faster, Easier, Access to Engineering Data – Automate Analysis tasks and Reporting – Traceability/Configuration Management – Build Institutional Knowledge
– Tight Integration with Business Systems – Efficient Resource Management
Current State of Affairs
Productivity Loss
• Fragmented, Inaccessible Information
• Ad-Hoc Analysis Methods • Wheel Reinvention
Poor Traceability
• Warranty / Liability / Recall • Revisions / Builds
• Retesting
Poor Decision Making
• Lack Of Big Picture • Ineffective System
Question #1
How do you search for test results within
your organization?
a) Central repository with search capability
b) Shared network drive with file naming strategy
c) We struggle to find test data
Question #2
How much time does your team spend
searching for information?
a) 10%
b) 20%
c) 30%
d) 40%
Question #3
How much time and effort does your team spend
processing and analyzing test data before a final
report is generated?
a) Manual process, automation could make a large impact b) Manual process, automation could help marginally
c) Varies, each person or area has their own techniques d) Very little, processes are automated
Cummins, Inc.
• DIAdem standard forcorporate analysis tools • DIAdem based custom
toolbox
• Leverages best practices • 90% productivity gain
through automation • Corporate taxonomy
– Universal naming conventions – Standard engineering units – Standard file types
Cummins
,Inc.
PSD
(approximate PSD)
Engine
.bin Chart inExcel
Acq Conv .CSV .TXT .TXT .TXT Report in PowerPoint Convert Report to .PDF
Previous Flow Before DIAdem
2 Weeks (40 hours) 1 Week
New Flow with DIAdem
DIAdem Automation Engine Acq .bin
.TXT .PDF Report 1 Week 4 Hours 90% Improvement 90% Improvement
IMATIS DIAdem Reporting Engine
• Scientific analysis andreporting for LIMS
• Allows administrator to
develop templates and custom channel selection
• Role based privileges for reporting
• Users can request standard reports or ad-hoc
Automotive OEM
• Safety Data Analysis System
– Service for engineers across safety test systems for reporting – Reports automatically generated – Supports hundreds of users
– Quick plot clients for data verification
– COM+ controller allows external control of DIAdem
– Queuing, load balancing
– J2EE, BEA Weblogic, Oracle,
USCAR
• ATD Tracking, Verification and Inventory Management.
– Complete traceability of all ATD related activities
– Web-based search and reporting
– DIAdem automated analysis and report generation
– Data Driven… managed by process owners, not IT
– DIAdem, ASP, SQL, & Visual C++ Integration
Takata ASL
• Supports Entire Technical Center – Engineering, R&D, Prototype
Build & Testing, Chemical Lab • Centrally Managed
– Web based build and test request
– Search capability – Traceability
– Error proofing
– Automated report generation • COM+ controller
Ford Motor Company
• Full TRECS suite used
across safety labs
– Barrier, HYGE, Decel Sled, Component labs
– Used internationally – 250 users
– DIAdem based analysis and reporting
Suggestions for Progress
• Select a project small enough toachieve quick success to demonstrate the benefits of effective EIM
– Build management consensus – Prove quick ROI
– Showcase visible improvement
• Solicit feedback from end-user community
– Ensures usability and buy-in
• Select common tools and architectures • Use COTS where possible
Project ROI Example
• Design Validation Test cycles are about 3 months long with
1-2 months downtime in between cycles
– This leads to a DVT cycle being in process 8 months out of a year.
• Test technicians spend 90% of their time manipulating data
and preparing reports and 10% of time setting up tests.
– Most of the 90% of their time is spent is determining the charting and
reporting for their customer.
– Data is manipulated and analyzed using Excel, not a professional
engineering or scientific tool and little automation (macros) is used.
• Engineers spend 10% of their time searching for
Project ROI Example
• If this system was able to save engineers just 50% of the
time searching for data and a burdened rate of $120/hr per engineer is assumed:
– 40 engineers x (50% savings x 10% effected time of
1880hrs/yr) x $120/hr = $ 451,200/yr
• If this system was able to save technicians just 40% of the
time spent manipulating data and preparing reports and a burdened rate of $90/hr is considered:
– 30 technicians x (40% savings x 90% effected time of
V I Engineering’s Unique
Perspective
“Our Test Domain Knowledge
Sets Us Apart in a Space Crowded with Non-differentiated IT
Companies”
• Understanding of test activities and the challenges that face teams of test
engineers and technicians
• Understanding of IT technology –
EIM Products and Services Offerings
• Resellers and Integration Specialists for COTSNational Instruments - DIAdem Automated Analysis, Visualization and Reporting
CARDIAC – Laboratory Information Management System
RSS Solutions – Advanced Planning and Scheduling Software SigmaQuest – Global Product Performance Intelligence
• Solutions Typically Built on Above Tools/Frameworks as well as custom • Specification and System Architecture
• Database Design • Web Portal Design
Conclusion
Promotes efficiencies throughout the design and testing process
– Foster Collaboration
– Faster, Easier, Access to Engineering Data – Automate Analysis Tasks and Reporting – Traceability/Configuration Management
Build Institutional Knowledge Leading to Engineering Intelligence