Agenda

• List of Services

• Soft FM services Framework

• Special Tender Requirement

• Current Open Tenders & Brief Scope

• Expected level of Services

(3)

Soft FM Services

• General Cleaning, Janitorial, Hygienic, Façade

management for all buildings

• Waste Management Services

• Pest Control Management Services

• Landscape Management Services**

(4)

Soft FM Services Framework

OAMC’s vision is to become a world class organization in the Airport Industry.

In order to achieve the goal, a triple bottom-line approach forms the framework in

provision of services in a sustainable manner.

Best Value for

Money

Environment

Protection

Excellent Work

Practices and Safety

Considerations

-

Performance based Contracts

-

Regular Contracts Reviews

-

Use of energy and water efficient machinery

-

Waste reduction and recycling

-

Integrated pest management approach

-

Quality Standards Requirement i.e. ISO 9001

-

Matching of staff’s experience and skillsets to

required tasks

-

Continuous Training programme to improve

staff’s skill sets

(5)

Special Requirements on Soft FM Services – Sustainability

OAMC introducing Sustainability strategies onto contracts for all services. Therefore, future

service providers should be prepared take on the following responsibilities:

-

Cleaning , Pest and Landscape Service Providers expected to:

- Use Resources ( water and energy ) efficiently by introducing innovative approaches

- Minimize emissions of gases or fumes to environment

- Use of Integrated Pest Management Programme to minimize chemical use

- Use and disposal of pesticides shall be in accordance to manufacturer’s instruction or

local authorities’ requirements

-

Waste Management Service Providers expected to:

- Source for viable recycling merchants for processing of collected recyclables

(6)

Special Requirements on Soft FM Services – CMMS

OAMC will be using an integrative platform, Computerized

Maintenance Management System (CMMS), to provide the

following support:

-

Work Management e.g. Issue Work Orders, Track Downtime

and Response Time

-

Track Complaints and Service Faults Reported

The CMMS will be integrated and accessible from handheld

devices to increase mobility of Contractor’s

(7)

Special Techniques to be used – Access Equipment

Building Maintenance Units (BMU) which will be used in

New Airport Facilities

:

1. System 1 – Manual Push Gantry

a.

– Main Roof and Lower Roof

b.

Lower Roof and Departure/ Arrival Level

2. System 2 – Climbing Monorail system with telescopic cradle (Access Several Areas)

3. Cherry Pickers

(8)

Current FM Tenders

(MCT Phase 1 & Salalah Airport)

• Open tenders for reputable and experienced companies to participate for the

provision of following services:

• ITC-FM-140201 – Provision of Landside & Airside Cleaning, Façade Cleaning,

Pest Control and Waste Management Services for Muscat International

Airport Phase 1

• ITC-FM-140202 – Provision of Landside & Airside Cleaning, Façade Cleaning

for Salalah Airport - Passenger Terminal Building

• ITC-FM-140203 – Provision of Landside & Airside Cleaning, Façade Cleaning

for Salalah Airport – Other Ancillary Buildings and Pest Control Services for All

Buildings of Salalah Airport

• ITC-FM-140204– Provision of Waste Management Services for Salalah Airport

• Distribution of Documents will close on 18 Mar 14.

• Bids must be submitted before 30 Apr 14, 12:00 pm at OAMC Headquarter Office.

• All bidders are invited to attend the Bid Opening at OAMC Headquarter Office.

(9)
(10)

Scope of Works (Salalah Airport)

Salalah Airport - New Building/Facilities

Area (m2)

Passenger Terminal Building 61,926

Landside commercial units 1,644

Airside commercial units 2,048

ROP Admin Building 5,230

Air Traffic Control (ATC) Tower 1,712

Air Traffic Monitoring (ATM) Complex 18,884

Crash Fire Rescue Station 1,050

AFL Substation 07 333

Deportee Departure Facility 4,000

Main Gate / Check Point 1,432

Data Centre 2 2,434

OAMC & Ground Handler Workshops 3,941

Utility Yard / Chiller Plant 3,610

Utility Yard / Generator Plant 1,200

Temporary Cargo Facility TBC

(11)
(12)

Scope of Works (MCT Phase 1)

Note:

• SOW refers to “Scope of Works”

New Building/Facilities Area (m2)

Utility Yard – Primary Substation 1,344.05

Utility Yard – Chiller Plant 4,891.71

AFL Substation 382.55

Pump House 767.87

Utility Yard – Irrigation Pump House 1,390.93

Utility Yard – Generator Plant 2,454.76

ATM Complex Utility Yard 200.38

C & T Utility Yard 200.38

ATM Store (single storey) 985.78

Air Traffic Meteorology Complex (3-storey) 17,318.88

Radiosonde Station (single storey) 172.49

Data Centre 2 (single storey) 2,992.00

Crash Fire & Rescue Main Station (2-storey) 1,222.00

Sea Rescue Station 579.00

ATC Tower (24 levels) 3,370.00

Contingency & Training Centre (2-storey) 7,478.16

PACA HQ (Civil Aviation) 29,714.00

(13)

Scope of Works (Cleaning Management )

Generally, Contractor shall be prepared to:

-

Provide all necessary equipment, tools, consumables, and manpower

for the successful completion of all works.

-

Upkeep appearance of finishes according to best practices and OMM if

any

-

Ensure cleanliness of washrooms and key general areas (i.e. check in

halls, arrival halls, forecourts) at all times, especially during peak

periods.

-

Ensure that the airport environment is pleasant and clean at all times

-

Works Order basis: Clean PTB façade using access equipment &

BMUs, Carpet Shampooing, Floor polishing

-

Transport waste from airport to waste collection points in a clean and

hygienic manner. Clean waste collection points on a regular basis.

(14)

Expected Level of Service (Cleaning Management)

Performance Level:

Excellent:

Good:

Fair:

Poor:

(15)

Scope of Works (Waste Management)

1) Provide all the necessary equipment, tools and manpower to perform the required services. Waste bins will

be provided by OAMC.

2) Pick up waste from the various waste collection points on a daily basis, and transport them to the waste

disposal facility.

3) Maintain cleanliness of the waste disposal facility and compactors

4) Segregate waste to pick out recyclables (i.e. paper, plastic metals) and record the weight of recyclables

collected

5) Engage suitable recycling merchants for the processing of recyclables

6) Regular removal of hazardous waste (flammable, bio-hazardous etc.) from airport to the proper treatment

plant/ disposal facility

(16)

Expected

Level of Service (Waste Management)

*: Refers to timely submission of reports, timely collection of all types of wastes, responding to service faults within 45min,

complies to all PPE requirements and safety protocols etc. Detailed requirements will be listed in the Tender Document.

Performance

Item Assessment Criteria Points Target Weightage

(%) (A)

OAMC Score (B) Weighted Score (A x B)

1 Recycling Rate 5 Achieve ≥ 25% of the total waste

3 Achieve < 25% to 20% of the total waste

1 Achieve < 20% of the total waste 2 Safety 5 Zero work related accident

3 1 no. of work related accident

1 More than 1 work related accident 3 Performance of Compactors & Equipment 5 Zero breakdown 3 1 incident of breakdown 1 >1 incident of breakdown 4 Compliance to Specifications 5 Always in compliance 3 Comply most of the specifications most of the time (≤

3 breaches per month)

1 Did not comply at all (> 3 breaches per month) 5 Complaints (from public

/ stakeholders / staffs)

5 Received not more than 1 complaint

3 Received 2 complaints

1 Received more than 2 complaints

(17)

Upcoming Tenders

• MCT Airport PTB and other Ancillary buildings

– Cleaning Management Services and Pest Control

– Waste Management Services

• Landscape Management Services for both

MCT and SLL airports

References

Related documents