CURRENT SITUATION
1. Sector Overview
3
Source: EPE
ELECTRICITY
CONSUMPTION 2013
Industrial Residential Commercial Others* Total
183 118 79 68 448 185 125 84 71 464 2012 2013
Brazil Consumption (
TWh)
(+3,5%)Others*= Rural; Public Service; Public Lighting
Consumption by Category
4
4º
10 Biggest Producers
(Installed capacity in MW average December 2013)
8,4% 7,8% 7,3% 5,9% 5,8% 5,6% 5,4% 4,9% 3,9% 2,1% 4º
20 30 40 50 60 70 80 90
Jan Fev Mar Abr Mai Jun Jul Ago Set Out Nov Dez
2011 2012 2013 2014 43,2% 5
LEVEL OF RESERVOIRS
35,2%Subsystem - Southeast / Midwest
(70% of the country’s storage)
0 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
Jan Fev Mar Abr Mai Jun Jul Ago Set Out Nov Dez
2011 2012 2013 2014 Média histórica
6
Affluent Natural Energy
–
Southeast / Midwest
Source: ONS
MW average
7 0 10 20 30 40 50 60 70 80 90 100
Jan Fev Mar Abr Mai Jun Jul Ago Set Out Nov Dez
2000 2001 2002 2003 2004 2005 2006 2007
2008 2009 2010 2011 2012 2013 2014
%
35,2 /feb 2014
33,5 /feb 2001
Stored Energy SE/MW
(% EARmax)
8 0 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 J F M A M J J A S O N D GH_2001 GH_2014 GT_2001 GT_2014 Carga_2001 Carga_2014 MWmed Load_2001 Load_2014
Energy Generation 2001 X 2014 - Brazil
GH – Hydroelectric Generation GT – Thermal Generation
0 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 0% 10% 20% 30% 40% 50% 60% 70% 80% Sudeste
EAR 2013 EAR 2014 ENA 2013 ENA 2014
EAR ENA [MWmed] 9 35,2% 35,0% MLT
EAR X ENA – Southeast / Midwest
EAR – Stored Energy ENA – Affluent Natural Energy MLT – Long Term Historical Average
10
AVERAGE PLD - R$/MWh
Subsystem Southeast / Midwest
67,31 97,36 135,4 38,73 70,28 29,42 166,69 413,95 214,54 339,75 196,13 344,84 207,62 121,29 163,38 266,16 260,99 331,07 290,72 378,22
2006 2007 2008 2009 2010 2011 2012 Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Jan
Annual Average Monthly Average
47,25 60,70 47,97 47,07 46,27 43,91 44,00 43,87 44,63 45,84 45,86 45,37 42,42 45,77 45,45 48,04 47,97 47,03 43,73 43,00 45,10 45,73 46,33 47,38 46,89 45,92 0,97 0,75 1,00 1,02 1,02 1,00 0,98 1,03 1,03 1,01 1,03 1,03 1,08 0,00 0,20 0,40 0,60 0,80 1,00 1,20 0 10 20 30 40 50 60 70
dez/12 jan/13 fev/13 mar/13 abr/13 mai/13 jun/13 jul/13 ago/13 set/13 out/13 nov/13 dez/13
Fator MRE
GW (Med) Garantia Física Geração Hidráulica GSF
ASSURED ENERGY x HYDRAULIC GENERATION
11
Source: CCEE
Dec/2012 - Dec/2013
GW Average
Assured Energy Hydraulic Generation
Jan Febr Mar April May June July Aug Sep Oct Nov Dec
55,9
54,9 51,2
46,8
45,4 46,2
47,5 48,1
48,4 47,9
47,6 46,8
SEASONALIZATION BRAZIL 2014
12GW average
Source: CCEE 12 Average 48,8 GW GSF: January estimated GSF 0,942. CESP Overview
14 CESP has six hydroelectric power plants located in the State of São Paulo with total installed
capacity of 7,457.3 MW and total guaranteed power output of 3,916 average megawatts (MW).
Três Irmãos Ilha Solteira Jupiá Porto Primavera Paraibuna Jaguari
*
The concession was not renewed and CESP was temporarily designated as responsible for providing the Electric Energy Generation Service.15
POWER PLANTS GENERATING
UNITS INSTALLED CAPACITY GUARANTEED POWER OUTPUT (AVERAGE MW) START OF OPERATIONS CONCESSION MATURITY DATE ILHA SOLTEIRA 14 1,540 1,017 Jan/23/1999 May/21/28 2 87 50 Apr/20/1978 Mar/09/21 2 27.6 14 May/05/1972 May/20/20 57 7,457.3 3,916 - - 20 3,444 1,731.5 Jul/18/1973 Jul/07/15 5 807.5 217.5 Nov/28/1993 Nov/18/11 14 1,551.2 886 Apr/14/1969 Jul/07/15 53 7,342.7 3,852 - - 4 114.6 64 - - JUPIÁ PORTO PRIMAVERA PARANÁ RIVER ... PARAIBUNA JAGUARI PARAIBA RIVER ... T O T A L ... TRÊS IRMÃOS *
* CESP was designated as responsible for providing Electric Energy Generation Service to Três Irmãos HPP. CESP will continue to function the plant until a new operator wins the auction.
2006 2007 2008 2009 2010 2011 2012 2013 0,921 0,921 0,934 0,928 0,934 0,930 0,925 0,924 0,896 0.896 Source: ONS 16 0,0252 0,0252 0,0106 0,0105 0,0054 0,0059 0,0063 0,0069 0,0095 0,0101 2006 2007 2008 2009 2010 2011 2012 2013 Date : December 2013
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 34,503 37.899 42.896 41.203 41.139 39.831 40.947 41.056 42.353 35.946 17 34,304
Guaranteed Power = 3,916.0 MW average* Nominal Annual Production = 34,304 GWh *including Três Irmãos Power Plant
CESP has been consistently producing energy above the physically guaranteed level
3. Financial Overview
32.849 32.845 33.150 38.794 40.724 39.832 41.353 10,303 8,220 62,15 68,81 76,11 79,41 81,40 84,73 92,29 91,50 113.74 19 529 586 712 803 787 827 954 1,287 546 646 721 753 794 803 985 1,068 658 680 786 739 862 841 943 959 659 713 769 789 876 908 937 2,391 2,626 3,379 3,319 3,084 2,987 3,819
Gross Revenue
BRL million Average Prices R$/MWh Invoiced Amount GWh 3,314Operational Expenses
Adjusted Financial Expenses
(excluding exchange variation)
EXPENSES
20 2008 2009 2010 2011 2012 9M13 1.635 1.523 1.722 1.771 2.223 1.260 2008 2009 2010 2011 2012 9M13 721 592 466 443 380 204 R$ million
Number of Employees
21
* Net effect of admissions in the tender and layoffs.
2009 2010 2011 2012 3T13
1
,
284
1,463
1
,
330
1,283
1,064
+179* -133 -47 -219 **EBITDA
(R$ million)EBITDA Margin (%)
EBITDA
22 2008 2009 2010 2011 2012 9M13 1.294 1.389 1.465 1.701 1.730 2.035 2008 2009 2010 2011 2012 9M13 52,2 52,4 50,4 57,5 51,6 68,92007 2008 2009 2010 2011 2012 9M13
144
168
84
29
23
27
44
42
42
71
87
106
45
28
Maintenance / Improvement Porto Primavera
129
Capital Investments
186
210
155
116
72
INVESTMENTS
2372
R$ million2005 2006 2007 2008 2009 2010 2011 2012 3Q13 24 Local Currency
FINANCIAL DEBT
Sep/30/2013 R$ 2,956 million 8.1 6.2 4.6 4.3 2.8 2.2 2.1 1.7 1.4 DEBT/EBITDAEvolution by Currency
55% 7,5 6,9 7,0 5,3 4,5 4,2 3,7 3,0 -69.38% 45% 9,8 36% 39% 35% 37% 31% 34% 27% 55% 45% 64% 61% 65% 63% 69% 66% 73%FINANCIAL DEBT IN FOREIGN CURRENCY
25 OTHERS R$ 2 0% BRADY PLAN R$ 64 8% BNDES R$ 731 92% 09.30.2013: R$ 797 million (27%) ( US$ 357 million )FIDC R$ 837 39% BONDS SERIES 8 R$1,090 50% ELETROBRÁS R$ 32 1% BIB’s R$26 1% BNDES Finame R$39 2% Pension Fund R$ 135 6%
FINANCIAL DEBT IN LOCAL CURRENCY
26
2013 2014 2015 2016 2017 After 2017 57% 72% 92% 64% 42% 4% 43% 28% 8% 36% 58% 96% 902
FINANCIAL DEBT PROFILE
27
Sept/30/2013 R$ 2,956 million
1,069 338 210 235 Local Currency 1,518 48828
EBITDA Margin 68.9% 66.1% +2.9p.p
Operational Revenue 3,314,503 2,882,732 +15.0% Net Operations Revenue 2,952,910 2,548,824 +15.9%
EBITDA 2,035,308 1,684,177 +20.8% Net Income 795,212 444,593 +78.9%
FINANCIAL HIGHLIGHTS
Financial Results (317,624 ) (456,612) -30.4% R$ (000) Interest on Capital 196,000 115,000 +70.4%CESP 6: +15.6%
SHARE PRICES – CESP 6
Source: AE Broadcast
IEE: - 8.8% 26,250 IBOV: - 15.5% 51,507
Period as from: Dec/31/2012 to Dec/31/2013
R$19.39
R$22.42
Page 29 29
30
4. Três Irmãos HPP
32
Concession Maturity Date November 18 , 2011
Provisional Measure 579 included Três Irmãos September 11, 2012
(Indemnization offered R$1.7 bi )
CESP did not accept the concession renewal December 3, 2012
Meetings with MME / EPE October 2013
(CESP divulges its indemnization amount of R$ 3.8 bi)
New bid foreseen for March 2014
TRÊS IRMÃOS HPP FACTS
CESP Required the Concession Renewal opportunely
Granting Power did not reply
Power from Tres Irmãos was allocated as quotas April 18, 2013 (Granting Power did not offer any indemnization at that time)
CESP is temporarily designated as responsible for the provision of Generation Services (CESP accepts it with GAG of R$ 29.3 million per year)
Costs of Management of Generation Assets (GAG)
(MME Ordinance No. 125/2013)
Annual : R$ 29.3 million
Annual Generation Revenue (RAG) *
(ANNEL Legal Resolution No. 1.572/2013)
Annual : R$ 71.8 million
Refunded:
Financial Compensation for the use of Water Resources and PIS/COFINS
Monthly: R$ 7.5 million
TRÊS IRMÃOS HPP REVENUE
33
5. Energy Auction
ENERGY AUCTION
35
Auction A -1 Date: Dec/17/2013 Energy delivery: Jan/1st/2014
Foreseen demand of the Distribution Market: 6,000 MW average
Total energy traded at auction: 2,571 MW average
Average PLD in December
R$ 291.00
CESP : Sale of 400 MW average (1 year) R$ 191.41
Sale of 98 MW average (18 meses) R$ 165.20
Products
Maximum Price
1 year
R$ 192.00
18 months
R$ 166.00
3 years
R$ 150.00
6. Q & A