• No results found

Residual Life Prediction of Power Plant Components

N/A
N/A
Protected

Academic year: 2020

Share "Residual Life Prediction of Power Plant Components"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 Scheme of the life-time management system of selected components of the power plants
Fig. 2 Assessment procedure of the component material damage by fatigue Dfd - cumulative damage factor for design conditions (Dfdj - for project regime), Dfp - estimation of the cumulative damage factor at the end of the assumed technical life of components
Fig. 3 Assessment procedure of the corrosion-mechanical damage of component materials c~ - initiation stress for the passive layer damage; t~ - time of the crack growth for the initiation stage; to - time of the crack growth at stress corrosion cracking; ao - 1 to 2 mm; tp - time of the assumed technical life of components
Fig. 4 Assessment procedure of the component material damage by creep Dcp - cumulative damage factor for design conditions; Dcp - estimation of the cumulative damage factor at the end of the assumed technical life of components
+2

References

Related documents

The types of securities available in the primary market segment as set out in the Trading Rules for the OTC Spot Market (link to be provided in the next update of this

On October 21, 2008, judgment was entered requiring the County Board to set aside its December 11, 2007 decision to revoke TFS’s charter and to reinstate the charter “with all

As a follow-up to the previous paper in which the analysis was done in relation to the evacuation zones of New York City, the goal of this study was to model the resilience

Zasnovali smo dva modela sodobne informacijske infrastrukture za lesna podjetja različnih velikosti, pri čemer smo upoštevali nekatere dejavnike (strojne zahteve

[5] propose the semantic grids; however they do not consider the effects of using different network architectures in end-to-end training and do not integrate the architecture with

• Offer contracts - A producer signs a contract with an elevator indicating his/her wishes to sell a specifi c number of bushels of grain any time cash price reaches a

 Modify the open-loop transfer function A(s) having three or more poles so that the closed-loop amplifier is stable for a given desirable value of closed-loop gain.  The

In the present study, high heritability along with high genetic advance was recorded by vine length, branch number, fruit length, fruit width, fruit yield/vine and