• No results found

Life Cycle Management in the US Nuclear Power Industry (D545)

N/A
N/A
Protected

Academic year: 2020

Share "Life Cycle Management in the US Nuclear Power Industry (D545)"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1 Major Steps in the EPRI LCM Planning Process.
Table 1 Example Estimated Payoffs from Optimum LCM Plans at Three Plants
Figure 2 Nuclear Asset Risk Management Framework

References

Related documents

All above data are stemmed from, or partially related with, original GPS data although data structures (also called schema) of descendant data objects are all different in the view

The results of this study may be shared with government and educational organizations to improve their understanding of the meaning of work and self-sufficiency from

(2) Notwithstanding anything contained in sub-section (1), in respect of [such taxable services as may be notified by the Central Government in the Official Gazette, the service

Because it was the first treatment plant to utilize DAF in the United States, conservative design parameters were used including three flocculation stages, 20-min total

Developing individual leadership skills and organizational leadership capabilities creates a more collaborative culture that can have a direct impact on patient care outcomes

Observations also indicate that erosion helps create drumlin relief, effective stresses in subglacial till are highest between drumlins, and during quiescent flow, crevasses on

The judgements included in the report are made in relation to the outcomes for children set out in the Children Act 2004; the National Standards for under 8s day care and