• No results found

Research Article From Firm Solar Power Forecasts to Firm Solar Power Generation An effective path to ultra-high renewable penetration A New York Case Study

N/A
N/A
Protected

Academic year: 2020

Share "Research Article From Firm Solar Power Forecasts to Firm Solar Power Generation An effective path to ultra-high renewable penetration A New York Case Study"

Copied!
22
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Influence of PV overbuilding on firm power generation LCOE. While unconstrained PV (A) is inexpensive (apparently below grid parity), firming PV to meet demand 24/365 with storage alone (B) is unrealistically expensive
Figure 2. NYISO Electrical regions map
Figure 3: Evolution of yearly (left) and daily (right) target load shape from firm forecasts to firm power generation
Table 3. Twenty four hours ahead forecasts
+7

References

Related documents

Because AR increases with age, and people at higher risk benefit more in terms of risk reduc- tion, it is reasonable to argue that older people (and especially otherwise healthy

Since 1980, public agencies in the Tahoe Basin have supported the Lake Tahoe Interagency Monitoring Program (LTIMP), acquiring streamflow and water quality data. The purpose of the

- results of test 8 h at supply voltage 1,9Un and rated load of current and voltage windings at cos ij = 1 and load of residual winding with thermal limit power (Stage No. 2),

Improving transparency and comparability and the development of clinical coding in private healthcare. Matt James, Chief Executive,

For the purposes of this Strategy Research Project (SRP) the use of Constabulary, constabulary force, Peace Keeping and Stability Operations (PKSO), peace making, peace

(1) Country Branding of “Wonderful Indonesia” was rated very well by respondents (2) Tourist Satisfaction was felt to be quite satisfied by respondents (3) The involvement of

Comments: Land Titles will require a three parcel plan of survey as follows: Parcel A - Proposed 1 on the sketch, Parcel B and C - Proposed Lot 2 on the sketch (this includes the