State / Estado Organization / Organización Automated System / Sistema Automatizado * System impacted / Sistemas impactados Manufacturer / Fabricante Procedure impact / Impacto en procedimientos Training Issues / Aspectos de capacitacion Publications/ Publicaciones Testing / Pruebas Current Status / Estado Actual Status Remarks / Observaciones 1 2 3 4 5 6 7 8 9 10 FIR 11 Flag 12
1. Anguilla C AFTN terminal Trinidad and
Tobago √ On going No AIC October On schedule/ en tiempo 2. Antigua and Barbuda / Antigua y Barbuda C TWR/APP: FDP ASR-8 √ On going / Plan to disseminate poster, filer, etc.
AIC – to be published through PIARCO - Not operational 3. Aruba
B APP/TWR –FDP Thales √ On going No AIC
Available from 25 Sep 2012 New FDP Project started on Jan. 25, 2012 and delivery date is Sep. 25, 2012.
AFTN System Manual- April On schedule/ en tiempo
4. Bahamas C APP/TWR ASR-8/ Instruments Texas X Ongoing AIC for June Sep 2012 Tender Process for New AFTN/AMHS
System X 5. Barbados A TWR/APP: FPL strip manager ATOM/ Diversified Integrated Sciences Corporation √
On going No AIC October
Convertor provided by Trinidad and Tobago
AFTN terminal Trinidad and Tobago √ On-going
6. Belize / Belice
A ACC-Simulator INDRA To be upgraded in 2013 Changes
coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN-AMHS
System COCESNA √ On schedule/ en tiempo
7. Bermuda A TWR - √ No Plan No AIC TBD Under New York Oceanic
8. British Virgin Islands / Islas Vírgenes Británicas C No available information 9. Canada A FDP-Displays - AFTN/AIS terminal- Simulator
Several √ On-going AIC for June May-Sep On schedule/ en tiempo X
NAV Canada in charge of updating FPL system
FIR Flag
10. Cayman Islands /
Islas Caimanes B
TWR: FDP
AFTN terminal Copperchase √ On going
No AIC (AIC planned for June) Upgrade – May/Jun e On schedule/ en tiempo X 11. Costa Rica A TWR: FDP-Displays ACC: FDP-Displays
INDRA √ On going AIC published Converto
r-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS terminal COCESNA √ July – Sept On schedule/ en tiempo 12. Cuba A TWR: FDP-Displays ACC: FDP-Displays- simulator AFTN/AIS terminal
ORACLE √ On going AIC for June May-
August Coordination with programmers/ Coordinación con
programadores X
13. Curaçao
A TWR:
FDP-Displays ACC:
FDP-Displays Raytheon √ On going No AIC
Converto
r- June Coordination with Manufacturer/ coordinaciones con Fabricante AFTN/AIS
terminal Ubitech √ 30 May AMHS available by May
14. Dominican Republic/ República Dominicana A TWR: FDP-Displays ACC: FDP-Displays AFTN/AIS terminal Thales √ On going No AIC Converto r- April Coordination with Manufacturer: Implementation delayed / coordinaciones con Fabricante Implementación retrasada X
Thales √ From 30/April/2
012
To be reported 15. El Salvador A TWR/APP:
FDP-Displays MSLP Trumman Northorn √ On going AIC published Convertor-July Converter to be used manufactured by COCESNA Coordinated by CEPA y assisted by COCESNA/ Coordinado por CEPA y asistido por COCESNA TWR/APP:
FDP-Displays MSSS INDRA √ Not used Coordinated by COCESNA/
Coordinado con COCESNA AFTN/AIS
FIR Flag 16. France (Martinique and Guadaloupe) / Francia (Martinica y Guadalupe) A GENERPL (Guadeloupe, Martinique) Guadeloupe, Martinique Cayenne ( FPL and AIS) ATC
System Cayenne System AFTN/AIS terminal France Manufacturer √
On going AIC for June June- July
Internal system that generates automatically FPL, via files from French companies (AirFrance and Air Caraïbe). Upgrade done by us (SNA/AG) SIGMA system √
Delivery of version PLN2012 Jun 2012. Upgrade done by our central technical service in Toulouse, France. CACAO Adacel
system (Aurora, for ADS-C
CPDLC)
√ Upgrade for May 2012. Upgrade done by
Adacel via a contract. PC AFTN: AFTN terminal used as backup of Sigma. √ Delivery of version PLN2012 may 2012. Upgrade done by our central technical service in Toulouse, France 17. Grenada A TWR/APP: FPL strip manager ATOM/ Diversified Integrated Sciences Corporation (DISC) √ June 2012 AIC – to be published through PIARCO July Manufacturer indicated that NFPL dates will be accomplished
AFTN terminal Trinidad and Tobago √ On going October On-going
18. Guatemala A TWR/APP:
FDP-Displays INDRA √ On going No AIC Convertor-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS
terminal COCESNA √ July Sept - On schedule/ en tiempo
19. Honduras A TWR/APP:
FDP-Displays INDRA √ On going No AIC Convertor-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS
terminal COCESNA √ July Sept - On schedule/ en tiempo
20. Haiti / Haití
C AFTN System ADP √ August No AIC (planned for
June)
June -
August Manual operations X
Planning for an Ubitech AMHS system
21. Jamaica A TWR: FDP
FIR Flag AMHS/AFTN Ubitech √ onwards On schedule / en tiempo: Operational by Sep 2012 / Operacional en sept 2012 22. Mexico / México A TWR: FDP- Displays-Simulator THALES √ May- June AIC
Available New Flight Plan Format software installed in Simulator and test bed / Software para el Nuevo Formulario de Plan de Vuelo instalado en el simulador y en la plataforma de prueba X ACC: FDP-Displays- Simulator THALES May- June Available AFTN/AIS
terminal SENEAM √ May- June Available New AFTN template for FPL
23. Montserrat C AFTN terminal Trinidad and
Tobago √ On going AIC – to be published through PIARCO
October On-going
24. Netherlands / Países Bajos Bes Islands
Manual Operations Information to
be confirmed
25. Nicaragua A TWR/APP:
FDP-Displays INDRA √ To be upgrade in 2012. Convertor to be used
AFTN/AIS
terminal COCESNA √ On schedule/ en tiempo
26. Trinidad and Tobago / Trinidad y Tobago A TWR: FDP-Displays SELEX √
June AIC for June
Converto r On-going X ACC: FDP-Displays- Simulator
SELEX √ convertor On-going
AFTN/AIS
terminal COMSOFT/ IDS √ October On-going
AFTN terminal Trinidad and Tobago √ October On-going
27. Saint Kitts and
Nevis C AFTN terminal Trinidad and Tobago √ On going No AIC – to be published through PIARCO
October On-going
28. Saint Lucia C AFTN terminal Trinidad and
Tobago √ On going No AIC – to be published through PIARCO
October On-going
29. Saint Vincent and
the Grenadines C AFTN terminal Trinidad and Tobago √ On going No AIC – to be published through PIARCO
October On-going
30. Sint Maarten A TWR/APP:
FIR Flag
AFTN/AMHS
terminal Ubitech √ Implementation Planning by Ubitech
31. Turks and Caicos Islands / Islas Turcas y Caicos
C ATC System/
AFTN Stonefield √ September No AIC - ongoing August Coordination manufacturer for test with dates
Coordinating with FAA
32. United States /
Estados Unidos A ARTCC: Displays - FDP-AFTN/AIS
terminal- Simulator
Several √ On going: April for operational staff and July for in depth training No AIC- planned for June. Progress given by Website
May-July On schedule/ en tiempo , ERAM /hosts systems being updated/ Sistemas ERAM y hosts estan actualizándose X 33. US Virgin Islands / Islas Vírgenes Estados Unidos A ARTCC: FDP-Displays - AFTN/AIS terminal- Simulator Several √ On schedule/ en tiempo: Same as United States
34. COCESNA A ACC-Simulator INDRA To be upgraded in
2013- Convertor to be
used X
AFTN-AMHS
FIR Flag
35. AVIANCA-TACA A LIDO FLIGHT LUFTHANSA Different loading procedure information assets and capabilities in different types of aircraft according to the certificates issued by aviation authorities. Also affected the development of flight plans by the flight dispatcher./ Procedimiento de cargar diferente información de equipos y capacidades en los diferentes tipos de aeronaves según las certificaciones otorgadas por la autoridad de aviación. También se ve afectado la elaboración de los planes de vuelo por parte del
Despachador de vuelos.
On-going N/A May Are being tested in test environment. Proposed implementation date, April 16, 2012 / Se están haciendo pruebas en ambiente de test. Fecha de implementación propuesta 16 de Abril 2012
36. AEROMEXICO A Hewlet Packard
(HP) HP In OPS Manual On-going N/A June On-going
*: A: Estados que cuentan con sistemas automatizados (Procesamiento de planes de vuelo, AFTN y datos radar)/ States that have automated systems (Flight Plan Processor, AFTN and Radar Data) B: Estados que cuentan con sistemas automatizados (Procesamiento de planes de vuelo solamente)/ States that have automated systems (Flight Plan Processor only)
C: Estados que cuentan con sistemas automatizados (AFTN solamente)/ States that have automated systems (AFTN only) D: Estados que no poseen sistemas automatizados ATM / States that do not have ATM automated systems