State / Estado Organization / Organización Automated System / Sistema Automatizado * System impacted / Sistemas impactados Manufacturer / Fabricante Procedure impact / Impacto en procedimientos Training Issues / Aspectos de capacitacion Publications/ Publicaciones Testing / Pruebas Current Status / Estado Actual Status Remarks / Observaciones 1 2 3 4 5 6 7 8 9 10 FIR 11 Flag 12

1. Anguilla C AFTN terminal Trinidad and

Tobago √ On going No AIC October On schedule/ en tiempo 2. Antigua and Barbuda / Antigua y Barbuda C TWR/APP: FDP ASR-8 √ On going / Plan to disseminate poster, filer, etc.

AIC – to be published through PIARCO - Not operational 3. Aruba

B APP/TWR –FDP Thales √ On going No AIC

Available from 25 Sep 2012 New FDP Project started on Jan. 25, 2012 and delivery date is Sep. 25, 2012.

AFTN System Manual- April On schedule/ en tiempo

4. Bahamas C APP/TWR ASR-8/ Instruments Texas X Ongoing AIC for June Sep 2012 Tender Process for New AFTN/AMHS

System X 5. Barbados A TWR/APP: FPL strip manager ATOM/ Diversified Integrated Sciences Corporation √

On going No AIC October

Convertor provided by Trinidad and Tobago

AFTN terminal Trinidad and Tobago √ On-going

6. Belize / Belice

A ACC-Simulator INDRA To be upgraded in 2013 Changes

coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN-AMHS

System COCESNA √ On schedule/ en tiempo

7. Bermuda A TWR - √ No Plan No AIC TBD Under New York Oceanic

8. British Virgin Islands / Islas Vírgenes Británicas C No available information 9. Canada A FDP-Displays - AFTN/AIS terminal- Simulator

Several √ On-going AIC for June May-Sep On schedule/ en tiempo X

NAV Canada in charge of updating FPL system

(2)

FIR Flag

10. Cayman Islands /

Islas Caimanes B

TWR: FDP

AFTN terminal Copperchase √ On going

No AIC (AIC planned for June) Upgrade – May/Jun e On schedule/ en tiempo X 11. Costa Rica A TWR: FDP-Displays ACC: FDP-Displays

INDRA √ On going AIC published Converto

r-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS terminal COCESNA √ July – Sept On schedule/ en tiempo 12. Cuba A TWR: FDP-Displays ACC: FDP-Displays- simulator AFTN/AIS terminal

ORACLE √ On going AIC for June May-

August Coordination with programmers/ Coordinación con

programadores X

13. Curaçao

A TWR:

FDP-Displays ACC:

FDP-Displays Raytheon √ On going No AIC

Converto

r- June Coordination with Manufacturer/ coordinaciones con Fabricante AFTN/AIS

terminal Ubitech √ 30 May AMHS available by May

14. Dominican Republic/ República Dominicana A TWR: FDP-Displays ACC: FDP-Displays AFTN/AIS terminal Thales √ On going No AIC Converto r- April Coordination with Manufacturer: Implementation delayed / coordinaciones con Fabricante Implementación retrasada X

Thales √ From 30/April/2

012

To be reported 15. El Salvador A TWR/APP:

FDP-Displays MSLP Trumman Northorn √ On going AIC published Convertor-July Converter to be used manufactured by COCESNA Coordinated by CEPA y assisted by COCESNA/ Coordinado por CEPA y asistido por COCESNA TWR/APP:

FDP-Displays MSSS INDRA √ Not used Coordinated by COCESNA/

Coordinado con COCESNA AFTN/AIS

(3)

FIR Flag 16. France (Martinique and Guadaloupe) / Francia (Martinica y Guadalupe) A GENERPL (Guadeloupe, Martinique) Guadeloupe, Martinique Cayenne ( FPL and AIS) ATC

System Cayenne System AFTN/AIS terminal France Manufacturer √

On going AIC for June June- July

Internal system that generates automatically FPL, via files from French companies (AirFrance and Air Caraïbe). Upgrade done by us (SNA/AG) SIGMA system √

Delivery of version PLN2012 Jun 2012. Upgrade done by our central technical service in Toulouse, France. CACAO Adacel

system (Aurora, for ADS-C

CPDLC)

√ Upgrade for May 2012. Upgrade done by

Adacel via a contract. PC AFTN: AFTN terminal used as backup of Sigma. √ Delivery of version PLN2012 may 2012. Upgrade done by our central technical service in Toulouse, France 17. Grenada A TWR/APP: FPL strip manager ATOM/ Diversified Integrated Sciences Corporation (DISC) √ June 2012 AIC – to be published through PIARCO July Manufacturer indicated that NFPL dates will be accomplished

AFTN terminal Trinidad and Tobago √ On going October On-going

18. Guatemala A TWR/APP:

FDP-Displays INDRA √ On going No AIC Convertor-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS

terminal COCESNA √ July Sept - On schedule/ en tiempo

19. Honduras A TWR/APP:

FDP-Displays INDRA √ On going No AIC Convertor-July Converter to be used manufactured by COCESNA Changes coordinated through COCESNA/ Cambios coordinados por COCESNA AFTN/AIS

terminal COCESNA √ July Sept - On schedule/ en tiempo

20. Haiti / Haití

C AFTN System ADP √ August No AIC (planned for

June)

June -

August Manual operations X

Planning for an Ubitech AMHS system

21. Jamaica A TWR: FDP

(4)

FIR Flag AMHS/AFTN Ubitech √ onwards On schedule / en tiempo: Operational by Sep 2012 / Operacional en sept 2012 22. Mexico / México A TWR: FDP- Displays-Simulator THALES √ May- June AIC

Available New Flight Plan Format software installed in Simulator and test bed / Software para el Nuevo Formulario de Plan de Vuelo instalado en el simulador y en la plataforma de prueba X ACC: FDP-Displays- Simulator THALES May- June Available AFTN/AIS

terminal SENEAM √ May- June Available New AFTN template for FPL

23. Montserrat C AFTN terminal Trinidad and

Tobago √ On going AIC – to be published through PIARCO

October On-going

24. Netherlands / Países Bajos Bes Islands

Manual Operations Information to

be confirmed

25. Nicaragua A TWR/APP:

FDP-Displays INDRA √ To be upgrade in 2012. Convertor to be used

AFTN/AIS

terminal COCESNA √ On schedule/ en tiempo

26. Trinidad and Tobago / Trinidad y Tobago A TWR: FDP-Displays SELEX √

June AIC for June

Converto r On-going X ACC: FDP-Displays- Simulator

SELEX √ convertor On-going

AFTN/AIS

terminal COMSOFT/ IDS √ October On-going

AFTN terminal Trinidad and Tobago √ October On-going

27. Saint Kitts and

Nevis C AFTN terminal Trinidad and Tobago √ On going No AIC – to be published through PIARCO

October On-going

28. Saint Lucia C AFTN terminal Trinidad and

Tobago √ On going No AIC – to be published through PIARCO

October On-going

29. Saint Vincent and

the Grenadines C AFTN terminal Trinidad and Tobago √ On going No AIC – to be published through PIARCO

October On-going

30. Sint Maarten A TWR/APP:

(5)

FIR Flag

AFTN/AMHS

terminal Ubitech √ Implementation Planning by Ubitech

31. Turks and Caicos Islands / Islas Turcas y Caicos

C ATC System/

AFTN Stonefield √ September No AIC - ongoing August Coordination manufacturer for test with dates

Coordinating with FAA

32. United States /

Estados Unidos A ARTCC: Displays - FDP-AFTN/AIS

terminal- Simulator

Several √ On going: April for operational staff and July for in depth training No AIC- planned for June. Progress given by Website

May-July On schedule/ en tiempo , ERAM /hosts systems being updated/ Sistemas ERAM y hosts estan actualizándose X 33. US Virgin Islands / Islas Vírgenes Estados Unidos A ARTCC: FDP-Displays - AFTN/AIS terminal- Simulator Several √ On schedule/ en tiempo: Same as United States

34. COCESNA A ACC-Simulator INDRA To be upgraded in

2013- Convertor to be

used X

AFTN-AMHS

(6)

FIR Flag

35. AVIANCA-TACA A LIDO FLIGHT LUFTHANSA Different loading procedure information assets and capabilities in different types of aircraft according to the certificates issued by aviation authorities. Also affected the development of flight plans by the flight dispatcher./ Procedimiento de cargar diferente información de equipos y capacidades en los diferentes tipos de aeronaves según las certificaciones otorgadas por la autoridad de aviación. También se ve afectado la elaboración de los planes de vuelo por parte del

Despachador de vuelos.

On-going N/A May Are being tested in test environment. Proposed implementation date, April 16, 2012 / Se están haciendo pruebas en ambiente de test. Fecha de implementación propuesta 16 de Abril 2012

36. AEROMEXICO A Hewlet Packard

(HP) HP In OPS Manual On-going N/A June On-going

*: A: Estados que cuentan con sistemas automatizados (Procesamiento de planes de vuelo, AFTN y datos radar)/ States that have automated systems (Flight Plan Processor, AFTN and Radar Data) B: Estados que cuentan con sistemas automatizados (Procesamiento de planes de vuelo solamente)/ States that have automated systems (Flight Plan Processor only)

C: Estados que cuentan con sistemas automatizados (AFTN solamente)/ States that have automated systems (AFTN only) D: Estados que no poseen sistemas automatizados ATM / States that do not have ATM automated systems

References

Related documents

negative reinforcer undergoes extinction. Incompatible behavior is then less and less strongly reinforced, and the punished behavior eventually emerges. When punishment again

Operations Manager discovers information about heterogeneous applications, servers, and storage in your environment by communicating directly with the storage arrays via the

This Flood Insurance Study (FIS) revises and updates information on the existence and severity of flood hazards in the geographic area of Barnstable County, Massachusetts,

• Clinical: Emphasis people with major psychological problems plus other areas. • Counseling: Didn’t have the training to deal with major behavioral problems as

The chair noted that in an email poll conducted on April 21, 2011, members of the Campus Planning and Development Committee received and reviewed background information on the

Measures of exposure to violence (being beaten as a child, family members acting violently toward one another, having been a victim of assault) were significant

After we have removed all type I degeneracies, we wish to choose a direction for the poles such that no type II degeneracies arise, when using the partial

Clearly there is a need to measure perceived differences between parent and adolescent technological knowledge with interactive technology (i.e., the internet and cell phones)