REFERENCES 2004 – 2012
1 / 10Through our clients we have been participated to following export projects:
• Isdemir Steel Plant Turkey, Modernization of By-Product Plant of Coke Ovens, 2004-2008: - Automation system design (Siemens PCS7)
- Application programming (Siemens PCS7)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Field Instrumentation and Field bus design (Profibus-DP)
- Project management
- Installation supervision services - Commissioning
• Bhilai Steel Plant (BSP) India, Coke Oven Battery No. 5, 2005-2009: - Automation system design (Siemens PCS7)
- Supervision of Application programming (Siemens PCS7) - Project handling and supervision
- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines
• Rourkela Steel Plant (RSP) India, Coke Oven Battery No. 1, 2006-2009:
- Project management
- Installation supervision services - Commissioning
• Visakhapatnam Steel Plant (VSP) India, Coke Oven Battery Machines at COB No.4, 2006-2009:
- Project handling and supervision
- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines
• Mittal Steel Newcastle South-Africa, Coke Oven Battery Machines, 2005-2007:
- Project handling and supervision
REFERENCES 2004 – 2012
2 / 10• Xiangtan Iron & Steel China, Coke Oven Battery Machines, 2005-2006: - Project handling and supervision
• Konark Met Coke Ltd. India, Coke Dry Quenching Plant, 2005-2007:
- Project management
• Ferruform AB Luleå Sweden, Beam production line, Capacity increase and production optimization, 2007-2008:
- Application programming and commissioning (Siemens S7 / WinCC)
• NA Copper Hamburg Germany, Copper Wire Spool, Packing line, 2007-2008:
- Application programming and commissioning (Siemens S7 / WinCC)
• UPM Raflatec Dixon USA, Label Laminate Plant, Packing line, 2007:
- Commissioning of Application program (Siemens S7 / WinCC)
• Ferruform AB Luleå Sweden, Modifications and Additions, Application software of Fork Lifts, 2008:
- Application programming and commissioning (Siemens S7 / WinCC)
• IISCO Steel Plant (ISP) Burnpur India, Coke Oven Battery No. 11, 2008-2012: - Automation system design (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)
- Electrical system design
- Supervision of Field Instrumentation design - Project management and supervision
- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines - Installation supervision tasks in India
REFERENCES 2004 – 2012
3 / 10• IISCO Steel Plant (ISP) Burnpur India, Coke Dry Quenching Plant of COB No. 11, 2008-2012: - Automation system design (Siemens PCS7)
- Application programming (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Electrical system design
- Supervision of Field Instrumentation design - Project management and supervision - Installation supervision tasks in India
• US Steel Kosice Slovakia, Raw Gas Pressure Control for five Coke Oven Batteries, 2008-2009: - Automation system design (Siemens S7 / Schneider Vijeo Citect)
- Electrical and Field Instrumentation design - Project Handling and supervision
- Application programming (Siemens S7 / Schneider Vijeo Citect) - Installation supervision services
- Commissioning
• Hellas Gold S.A. Skouries Greece, Concentration Plant of Copper/Cold Mine, 2008-2010: - Automation system design (Siemens PCS7)
- Application programming (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Field Instrumentation design
REFERENCES 2004 – 2012
4 / 10• Rourkela Steel Plant (RSP) India, Coke Oven Battery No. 4, 2009-2010: - Project handling and supervision
- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines
• Bhilai Steel Plant (BSP) India, Coke Oven Battery No. 6, 2009-2012: - Automation system design (Siemens PCS7)
- Project handling and supervision
- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines
- Application programming of Positioning and Interlocking system of Coke Oven Battery Machines (Siemens PCS7/S7/WinCC)
• Propapier PM2 Eisenhüttenstadt Germany, Wet End of Board Machine 2010:
Chemicals / Ultra filtration of Waters / Elutriation, pulping and loading of Enzymatic starch to Coating Head 2010.
- Application programming (MetsoDNA)
- Installation supervision services (field instrumentation)
- Commissioning of application software and field instrumentation
• Rourkela Steel Plant (RSP) India, Coke Dry Quenching Plant of COB No. 1, 2010-2012: - Automation system design (Siemens PCS7)
- Application programming (Siemens PCS7)
- Application programming of Coke Bucket Car (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Electrical system design
REFERENCES 2004 – 2012
5 / 10• Petropavlovsk Gold Mine Amur Russia, Malomyr-Gold Mine, Concentration plant 2011-2012:
- Application programming (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Testing of MCC-cabinets (VFDs, Simocodes)
• Petropavlovsk Gold Mine Amur Russia, Autoclaves (4 pcs), Pokrovskyi-continued handling plant 2011-2012:
- Application programming (Siemens PCS7)
- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)
- Testing of automation system cases and cabinets, FAT-testing of automation system - Testing of MCC-cabinets (VFDs, Simocodes)
• ZAO Miheevsky GOK Chelyabinsk Russia, Miheevsky Copper Mine, Concentration plant 2012-2013:
- Application programming (Siemens PCS7)
- Testing of automation system cases and cabinets, FAT-testing of automation system
• ABB Switzerland Ltd. Pajala Sweden, Kaunisvaara’s Iron Mine and ja Concentration plant 2012: - Installation supervision tasks of process electrification and field instrumentation
REFERENCES 2004 – 2012
6 / 10Through our clients we have been participated for following projects in Finland:
• Stora-Enso Oyj Kemijärvi, Pulp Mill, 2006:
- Gate control systems, application programming and commissioning (Siemens S7/WinCC)
• Stora-Enso Oyj Kemi, Paper and Pulp Mill, 2005-2010:
- Sheeting Plant, application programming and commissioning (Siemens S7/WinCC)
- Debarking Plant, Melting conveyor, PLC replacement : Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)
- Elutriation Plant, PLC replacement: Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)
- Debarking Plant, Ground wood Mill, PLC replacement: Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)
- Sheeting Plant, Duplex Cutters: Application programming and commissioning (Siemens S7/WinCC) - Roll X-project (PM2 ja PM3 packing): Application programming and commissioning (Siemens S7) - Application programming, troubleshooting, HW design and maintenance (Siemens S7/WinCC) - Training services for PLC system applications (Siemens S7/ WinCC)
• Nestor Cables Oy Oulu, Cable Works, 2008:
- Warehouse automation system, application programming and commissioning (Siemens S7/WinCC)
• Talvivaara Oy, Sotkamo Mine, 2008-2010:
- Installation supervision services of process electrification of the plant
- Configuration works, trial runs and commissioning of field buses, intelligent motor drives and AC-drives
REFERENCES 2004 – 2012
7 / 10• Rautaruukki Oyj Raahe, Steel Plant, 2008-2012:
- Finishing Mill, Main drives of roller units 4-6: Interfacing to automation system (Siemens S7/CFC, Intouch HMI)
- Roughing Mill, Main drives: Interfacing to automation system (Siemens S7/CFC, Intouch HMI) - HW and electrical design at several places of the plant
- Automation/PLC system design, SW modifications to PLC and automation system applications (Siemens S7/WinCC/Siemens PCS7/Intouch)
- Coros/Intouch HMI-application design, modifications and training services at Plate Roller Mill - Plate Roller Mill, AC-drives (43 pcs): Interfacing to automation system (Siemens S7/CFC, Intouch HMI)
- Coking Plant, Coke Oven Battery Machines: Developing of application programs of existing Battery Machine PLCs (Siemens S5/S7)
- Monitoring, troubleshooting and reporting of sequence disturbances of Coke Oven Battery Machines
- Coking Plant, Development projects of Coking Plant automation and process technology: Engineering, supervision and project handling tasks
- Coking Plant, The monitoring and maintenance system (application software) of Coke Oven Battery Machines: Developing, testing and commissioning, training of operation and maintenance
personnel of the palnt
- Troubleshooting and SW-maintenance services at several places of the plant (AC/DC-drives, Automation and PLC systems)
- Automation systems, field instrumentation and process electrification of Blast Furnaces 1 & 2, Modernization Projects 2009-2011:
• Project planning, project supervision and project handling tasks • Safety engineering, checking and reporting of process, mechanical and
REFERENCES 2004 – 2012
8 / 10• Installation supervision and commissioning tasks of field instrumentation and process electrification (Dust removal, Granulation, Silo plant, Conveyor systems, Temperature measurements, Briquetting plant)
• Outokumpu Stainless Oy Tornio, Steel Plant, 2008-2010:
- Modifications, troubleshooting and maintenance services at Hot rolling Mill and Cold rolling Mill (AC/DC-drives, Automation systems and PLCs)
- PreHot, Interlocking modifications of APU2, Hot rolling Mill (Siemens PCS7) - APU 1 optimization (Main firing sequences), Hot rolling Mill (Siemens PCS7) - Extension of gas monitoring system, Hot rolling Mill (Siemens S7/PCS7)
- Overhead Cranes N2, N3 and N4 - Steering areas of cranes, modifications and extensions, Cold rolling Mill (Siemens S7)
- Walking beam furnace, application SW modifications at Hot rolling Mill (Siemens S7/PCS7)
• Pentik Oy Posio, Ceramics Works, 2009-2012:
- Troubleshooting, program developing works and SW-modifications of production machines and lines at Ceramics Works (AC -drives, Siemens S5/S7 application programs)
- Siemens equipment investigation and life cycle analysis thorough the Ceramics works
- Lippert - glazing machine, PLC replacement Siemens S5/S7: HW-design, application programming and commissioning
- Pallet Conveyor, PLC replacement Siemens S5/S7: HW-design, application programming and commissioning
- Replacement work of Siemens Operation panels, development and modification of HMI-interfaces at production machines and production lines
• Rannikon Konetekniikka Oy Raahe 2009-2010:
- RKT-Mantsinen-200 Coil hoisting device, automation design - Slab handling device (Outokumpu Oy), automation design
REFERENCES 2004 – 2012
9 / 10• NEOT (North European Oil Trade Ltd), NEOT-Vaasa/Pori/Rovaniemi/Oulu 2010-2012: Fuel storages (control and monitoring systems)
- Application programming and commissioning, maintenance tasks by remote workstation accesses (Omron PLCs, Siemens S7/WinCC)
- Several PLC replacements: Application programming, HW design, modifications, commissioning (Omron PLCs and Siemens S5/S7)
• Siemens-VAI Finland Ltd / Siemens Osakeyhtiö, Terästeollisuuden vientiprojektit 2004-2012: - Tender calculations, cost calculations
- Technical support of project sales
- Projecting works (Project handling and Supervision) - Development tasks
- Training tasks
- Project planning works and studies
• Kylylahti Copper Oy Kaavi (Altona Mining Ltd) , Luikonlahti Copper concentration plant 2011-2012: - Process electrification design, field instrumentation design
• Oulun Energia Oy Oulu, Peat power plant, Peat receiving plant 2012: - Process electrification design
• Insta Oy Harjavalta (Norilsk Nickel Harjavalta Oy) , Nickel smelting works 2011-2012:
- Field instrumentation design, maintenance and overhaul design of field instrumentation
• Agnico-Eagle Ltd Kittilä Cold Mine, Paste plant 2011-2012:
REFERENCES 2004 – 2012
10 / 10• Pölkky Oy Sawmills at Kuusamo and Taivalkoski (Ulea Oy) 2011-2012:
- Siemens equipment investigation and life cycle analysis thorough the Ceramics works - Log sorter plant (Kuusamo Sawmill), PLC replacement Siemens S5/S7: HW-design, application programming and commissioning
- Log sorter plant (Taivalkoski Sawmill), PLC replacement Siemens S5/S7: HW-design, application programming and commissioning
- Troubleshooting, program developing works and SW-modifications at production lines (Siemens S7/WinCC)
• Paroc Oy Ab Oulu Mineral wool plant, Infor - Plastic film packing line, Modernization project 2012: - PLC replacement Siemens S5/S7: HW-design, application programming and commissioning - Increasing the level of automation, renewal and addition of field instruments and sensors: HW-design, application programming and commissioning
- Upgrading the security level of the packing line (to SIL 2)
- Troubleshooting, application program and production developing works, SW-modifications (Siemens S7/WinCC)