• No results found

REFERENCES / 10

N/A
N/A
Protected

Academic year: 2021

Share "REFERENCES / 10"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

REFERENCES 2004 – 2012

1 / 10

Through our clients we have been participated to following export projects:

Isdemir Steel Plant Turkey, Modernization of By-Product Plant of Coke Ovens, 2004-2008: - Automation system design (Siemens PCS7)

- Application programming (Siemens PCS7)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Field Instrumentation and Field bus design (Profibus-DP)

- Project management

- Installation supervision services - Commissioning

Bhilai Steel Plant (BSP) India, Coke Oven Battery No. 5, 2005-2009: - Automation system design (Siemens PCS7)

- Supervision of Application programming (Siemens PCS7) - Project handling and supervision

- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines

Rourkela Steel Plant (RSP) India, Coke Oven Battery No. 1, 2006-2009:

- Project management

- Installation supervision services - Commissioning

Visakhapatnam Steel Plant (VSP) India, Coke Oven Battery Machines at COB No.4, 2006-2009:

- Project handling and supervision

- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines

Mittal Steel Newcastle South-Africa, Coke Oven Battery Machines, 2005-2007:

- Project handling and supervision

(2)

REFERENCES 2004 – 2012

2 / 10

Xiangtan Iron & Steel China, Coke Oven Battery Machines, 2005-2006: - Project handling and supervision

Konark Met Coke Ltd. India, Coke Dry Quenching Plant, 2005-2007:

- Project management

Ferruform AB Luleå Sweden, Beam production line, Capacity increase and production optimization, 2007-2008:

- Application programming and commissioning (Siemens S7 / WinCC)

NA Copper Hamburg Germany, Copper Wire Spool, Packing line, 2007-2008:

- Application programming and commissioning (Siemens S7 / WinCC)

UPM Raflatec Dixon USA, Label Laminate Plant, Packing line, 2007:

- Commissioning of Application program (Siemens S7 / WinCC)

Ferruform AB Luleå Sweden, Modifications and Additions, Application software of Fork Lifts, 2008:

- Application programming and commissioning (Siemens S7 / WinCC)

IISCO Steel Plant (ISP) Burnpur India, Coke Oven Battery No. 11, 2008-2012: - Automation system design (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)

- Electrical system design

- Supervision of Field Instrumentation design - Project management and supervision

- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines - Installation supervision tasks in India

(3)

REFERENCES 2004 – 2012

3 / 10

IISCO Steel Plant (ISP) Burnpur India, Coke Dry Quenching Plant of COB No. 11, 2008-2012: - Automation system design (Siemens PCS7)

- Application programming (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Electrical system design

- Supervision of Field Instrumentation design - Project management and supervision - Installation supervision tasks in India

• US Steel Kosice Slovakia, Raw Gas Pressure Control for five Coke Oven Batteries, 2008-2009: - Automation system design (Siemens S7 / Schneider Vijeo Citect)

- Electrical and Field Instrumentation design - Project Handling and supervision

- Application programming (Siemens S7 / Schneider Vijeo Citect) - Installation supervision services

- Commissioning

Hellas Gold S.A. Skouries Greece, Concentration Plant of Copper/Cold Mine, 2008-2010: - Automation system design (Siemens PCS7)

- Application programming (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Field Instrumentation design

(4)

REFERENCES 2004 – 2012

4 / 10

Rourkela Steel Plant (RSP) India, Coke Oven Battery No. 4, 2009-2010: - Project handling and supervision

- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines

Bhilai Steel Plant (BSP) India, Coke Oven Battery No. 6, 2009-2012: - Automation system design (Siemens PCS7)

- Project handling and supervision

- Engineering of Positioning and Interlocking system of Coke Oven Battery Machines

- Application programming of Positioning and Interlocking system of Coke Oven Battery Machines (Siemens PCS7/S7/WinCC)

Propapier PM2 Eisenhüttenstadt Germany, Wet End of Board Machine 2010:

Chemicals / Ultra filtration of Waters / Elutriation, pulping and loading of Enzymatic starch to Coating Head 2010.

- Application programming (MetsoDNA)

- Installation supervision services (field instrumentation)

- Commissioning of application software and field instrumentation

Rourkela Steel Plant (RSP) India, Coke Dry Quenching Plant of COB No. 1, 2010-2012: - Automation system design (Siemens PCS7)

- Application programming (Siemens PCS7)

- Application programming of Coke Bucket Car (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP/Profibus-PA)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Electrical system design

(5)

REFERENCES 2004 – 2012

5 / 10

Petropavlovsk Gold Mine Amur Russia, Malomyr-Gold Mine, Concentration plant 2011-2012:

- Application programming (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Testing of MCC-cabinets (VFDs, Simocodes)

Petropavlovsk Gold Mine Amur Russia, Autoclaves (4 pcs), Pokrovskyi-continued handling plant 2011-2012:

- Application programming (Siemens PCS7)

- Case and cabinet design (HW-design: Automation system, field instrumentation and buses) - Ethernet and Field bus design (Profibus-DP)

- Testing of automation system cases and cabinets, FAT-testing of automation system - Testing of MCC-cabinets (VFDs, Simocodes)

ZAO Miheevsky GOK Chelyabinsk Russia, Miheevsky Copper Mine, Concentration plant 2012-2013:

- Application programming (Siemens PCS7)

- Testing of automation system cases and cabinets, FAT-testing of automation system

• ABB Switzerland Ltd. Pajala Sweden, Kaunisvaara’s Iron Mine and ja Concentration plant 2012: - Installation supervision tasks of process electrification and field instrumentation

(6)

REFERENCES 2004 – 2012

6 / 10

Through our clients we have been participated for following projects in Finland:

Stora-Enso Oyj Kemijärvi, Pulp Mill, 2006:

- Gate control systems, application programming and commissioning (Siemens S7/WinCC)

Stora-Enso Oyj Kemi, Paper and Pulp Mill, 2005-2010:

- Sheeting Plant, application programming and commissioning (Siemens S7/WinCC)

- Debarking Plant, Melting conveyor, PLC replacement : Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)

- Elutriation Plant, PLC replacement: Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)

- Debarking Plant, Ground wood Mill, PLC replacement: Application programming, HW design, modifications, commissioning (Siemens S5/S7/WinCC)

- Sheeting Plant, Duplex Cutters: Application programming and commissioning (Siemens S7/WinCC) - Roll X-project (PM2 ja PM3 packing): Application programming and commissioning (Siemens S7) - Application programming, troubleshooting, HW design and maintenance (Siemens S7/WinCC) - Training services for PLC system applications (Siemens S7/ WinCC)

Nestor Cables Oy Oulu, Cable Works, 2008:

- Warehouse automation system, application programming and commissioning (Siemens S7/WinCC)

• Talvivaara Oy, Sotkamo Mine, 2008-2010:

- Installation supervision services of process electrification of the plant

- Configuration works, trial runs and commissioning of field buses, intelligent motor drives and AC-drives

(7)

REFERENCES 2004 – 2012

7 / 10

• Rautaruukki Oyj Raahe, Steel Plant, 2008-2012:

- Finishing Mill, Main drives of roller units 4-6: Interfacing to automation system (Siemens S7/CFC, Intouch HMI)

- Roughing Mill, Main drives: Interfacing to automation system (Siemens S7/CFC, Intouch HMI) - HW and electrical design at several places of the plant

- Automation/PLC system design, SW modifications to PLC and automation system applications (Siemens S7/WinCC/Siemens PCS7/Intouch)

- Coros/Intouch HMI-application design, modifications and training services at Plate Roller Mill - Plate Roller Mill, AC-drives (43 pcs): Interfacing to automation system (Siemens S7/CFC, Intouch HMI)

- Coking Plant, Coke Oven Battery Machines: Developing of application programs of existing Battery Machine PLCs (Siemens S5/S7)

- Monitoring, troubleshooting and reporting of sequence disturbances of Coke Oven Battery Machines

- Coking Plant, Development projects of Coking Plant automation and process technology: Engineering, supervision and project handling tasks

- Coking Plant, The monitoring and maintenance system (application software) of Coke Oven Battery Machines: Developing, testing and commissioning, training of operation and maintenance

personnel of the palnt

- Troubleshooting and SW-maintenance services at several places of the plant (AC/DC-drives, Automation and PLC systems)

- Automation systems, field instrumentation and process electrification of Blast Furnaces 1 & 2, Modernization Projects 2009-2011:

• Project planning, project supervision and project handling tasks • Safety engineering, checking and reporting of process, mechanical and

(8)

REFERENCES 2004 – 2012

8 / 10

• Installation supervision and commissioning tasks of field instrumentation and process electrification (Dust removal, Granulation, Silo plant, Conveyor systems, Temperature measurements, Briquetting plant)

• Outokumpu Stainless Oy Tornio, Steel Plant, 2008-2010:

- Modifications, troubleshooting and maintenance services at Hot rolling Mill and Cold rolling Mill (AC/DC-drives, Automation systems and PLCs)

- PreHot, Interlocking modifications of APU2, Hot rolling Mill (Siemens PCS7) - APU 1 optimization (Main firing sequences), Hot rolling Mill (Siemens PCS7) - Extension of gas monitoring system, Hot rolling Mill (Siemens S7/PCS7)

- Overhead Cranes N2, N3 and N4 - Steering areas of cranes, modifications and extensions, Cold rolling Mill (Siemens S7)

- Walking beam furnace, application SW modifications at Hot rolling Mill (Siemens S7/PCS7)

Pentik Oy Posio, Ceramics Works, 2009-2012:

- Troubleshooting, program developing works and SW-modifications of production machines and lines at Ceramics Works (AC -drives, Siemens S5/S7 application programs)

- Siemens equipment investigation and life cycle analysis thorough the Ceramics works

- Lippert - glazing machine, PLC replacement Siemens S5/S7: HW-design, application programming and commissioning

- Pallet Conveyor, PLC replacement Siemens S5/S7: HW-design, application programming and commissioning

- Replacement work of Siemens Operation panels, development and modification of HMI-interfaces at production machines and production lines

Rannikon Konetekniikka Oy Raahe 2009-2010:

- RKT-Mantsinen-200 Coil hoisting device, automation design - Slab handling device (Outokumpu Oy), automation design

(9)

REFERENCES 2004 – 2012

9 / 10

• NEOT (North European Oil Trade Ltd), NEOT-Vaasa/Pori/Rovaniemi/Oulu 2010-2012: Fuel storages (control and monitoring systems)

- Application programming and commissioning, maintenance tasks by remote workstation accesses (Omron PLCs, Siemens S7/WinCC)

- Several PLC replacements: Application programming, HW design, modifications, commissioning (Omron PLCs and Siemens S5/S7)

Siemens-VAI Finland Ltd / Siemens Osakeyhtiö, Terästeollisuuden vientiprojektit 2004-2012: - Tender calculations, cost calculations

- Technical support of project sales

- Projecting works (Project handling and Supervision) - Development tasks

- Training tasks

- Project planning works and studies

Kylylahti Copper Oy Kaavi (Altona Mining Ltd) , Luikonlahti Copper concentration plant 2011-2012: - Process electrification design, field instrumentation design

Oulun Energia Oy Oulu, Peat power plant, Peat receiving plant 2012: - Process electrification design

Insta Oy Harjavalta (Norilsk Nickel Harjavalta Oy) , Nickel smelting works 2011-2012:

- Field instrumentation design, maintenance and overhaul design of field instrumentation

• Agnico-Eagle Ltd Kittilä Cold Mine, Paste plant 2011-2012:

(10)

REFERENCES 2004 – 2012

10 / 10

Pölkky Oy Sawmills at Kuusamo and Taivalkoski (Ulea Oy) 2011-2012:

- Siemens equipment investigation and life cycle analysis thorough the Ceramics works - Log sorter plant (Kuusamo Sawmill), PLC replacement Siemens S5/S7: HW-design, application programming and commissioning

- Log sorter plant (Taivalkoski Sawmill), PLC replacement Siemens S5/S7: HW-design, application programming and commissioning

- Troubleshooting, program developing works and SW-modifications at production lines (Siemens S7/WinCC)

Paroc Oy Ab Oulu Mineral wool plant, Infor - Plastic film packing line, Modernization project 2012: - PLC replacement Siemens S5/S7: HW-design, application programming and commissioning - Increasing the level of automation, renewal and addition of field instruments and sensors: HW-design, application programming and commissioning

- Upgrading the security level of the packing line (to SIL 2)

- Troubleshooting, application program and production developing works, SW-modifications (Siemens S7/WinCC)

References

Related documents