• No results found

Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)

N/A
N/A
Protected

Academic year: 2021

Share "Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Scope of energy audit program
Figure 2: Flow chart of Gross error detection technique, Measurement test (Wikipedia, 2012)  The next steps are:
Figure 3: Box plot diagram of hot oil flow rate
Figure 4: Interfaces of the energy audits program
+2

References

Related documents

This review presents 92 studies that provide empirical evidence of the impact of outreach interventions on a broad range of outcomes, including aspirations towards, awareness of, and

The Group Operations team consists of a Sales/Group Operations Manager, a Group Operations Supervisor, Sales Reps, Reservations Agents, and Greeters.. There are approximately

Đặc iệt trong lĩnh vực Y học, các hợp chất này đã và đang đƣợc nghiên cứu làm thuốc nhƣ thuốc kháng sinh, thuốc chữa cúm A, thuốc tim mạch…Nhiều hợp

Similar the results of the concrete compressive strength of seawater that showed good results, the results of the bending strength of this slab also showed that the

The summary resource report prepared by North Atlantic is based on a 43-101 Compliant Resource Report prepared by M. Holter, Consulting Professional Engineer,

The main objective of the Programme for Public Administration is to develop human capital in the public sector of the developing member countries (DMCs) through

● From the Start/Finish at the River House Barn, head south and cross Fig Ave into the River Campground and head EAST and connect with Main Loop trail.. ● The main loop trail will

During this portion of the study, we examine the effect that lowering the threshold number of flow contributing cells required to distinguish between channel and overland flows has