International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

10

Performance analyses of construction work of plant using A.H.P. method

Jitendra Dantare, Sanjay Mohite, Sanjay Goyal

Mechanical Engineering Department, Maharana Pratap College of Technology, Gwalior, Madhya Pradesh, India.

E-mail: [email protected], [email protected]

ABSTRACT:-This work is to find out best output of construction work using Analytic Hierarchy Process (A.H.P. Process). Author has opt out various operation of work which is performed during the construction work of plant. These operation has placed in five useful act they are Customer satisfaction, Inventory, Administration and planning, Construction and Vendor selection. Fifteen parameters which makes effect in performance have been selected in each act. According to analysis of importance and effect of parameter they have been reduced to eight. These has accomplished by ABC analysis methodology. Application of A.H.P. process author has calculate the present consistency or each act on the basis of priorities which has been using up to now. Need of improvement has been observed in all act of construction work in plant. To make the all act economic and efficient priorities of parameters have been redesign on the basis of literature and our own experience and again consistency of each act calculated. A marginal improvement have been observed in the consistency of all act. In this way author has found optimum rate of priority of parameters in all required act of construction work. Using this priorities construction work of plant become lean and agile.

Keywords : A.H.P.(Analytic Hierarchy Process), KPI(Key performance indicator),CR(Consistency ratio), RI(Random index), ABC analysis

INTRODUCTION

A supply chain is a system of organizations, people, activities, information, and resources

involved in moving a product or service from supplier to customer. Supply chain activities transform natural resources, raw materials, and components into a finished product that is delivered to the end customer. In sophisticated supply chain systems, used products may re-enter the supply chain at any point where residual value is recyclable. Supply chains link value chains.

ANALYTIC HIERARCHY PROCESS (AHP) METHODE:-

The Analytic Hierarchy Process (AHP), introduced by Thomas Saaty (1980), is an effective tool for dealing with complex decision making, and may aid the decision maker to set priorities and make the best decision.

RATING OF PREFERENCE

(2)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

11

CONSISTANCY

CASE STUDY Heads Of Parameters

• Customer Satisfaction

• Inventory

• Administration and Planning

• Construction

Vender Selection

(3)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

12

Now, estimating the consistency ratio as follows:

for the value of λ max, the weighted sum matrix for other factor Measures is calculated as follows

(4)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

13

Result analysis of Construction Work factors according to present relative importance to each other. Which represents by this consistency

Result Analysis

Rankings obtained by AHP analysis:

The results are drawn from the above tables of each criteria/factor. Greater the value of GP/GR (Global Priority/Global Rank), greater is the rank corresponding to that KPI/Head. So, column wise values of GP/GR of each table are arranged in decreasing order and then allotted the simultaneous rank from 1 to n (n= Number of KPIs/Heads in that respective table).In this manner the following ranks are obtained.

(5)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

14

We consider fresh relative importance to improve the consistency factor pertaining to Construction (CT), Administration & planning(A&P), Vendor selection (VS), Inventory(IV) and Customer Satisfaction(CS) selection. we found the significant improvement in consistency factor

(6)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

15

Result of the overall analysis

The analysis illustrates the order of importance of both the heads and KPIs corresponding to consistency performance. Now, these KPIs with their order of respect can be used to construct a framework for Construction Work measurement in industries. Priority of findings of the research proved that Construction Work can be improved by changing key performance indicators (KPIS).

Comparison between present and improve consistency of factor :-

Conclusion

To improve of the construction work performance measure in transformer industry a little change in the priority of factor which affect construction work performance may be better appreciated. These priority level mitigate the rework & delay in construction work performance while improve the construction work and qualities.

We have improved proximally 28%. construction work performance can be improved by implementation of this concept. Calculated factors are given below.

Comparison between present and improve consistency

(7)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

16

Recommended rank for KPIs

REFRENCES

[1] Tschangho John Kim “Modified analytic hierarchy process for project proposal evaluation: An alternative method for practical implementation” Article in Regional Science

Policy & Practice 10(1)

DOI:10.1111/rsp.12113, 2018.

[2] Erika Pärn, Amos Darko, Albert Ping

Chuen Chan, Ernest Effah

Ameyaw, Emmanuel Kingsford Owusu

“Review of application of analytic hierarchy

process (AHP) in construction”International Journal of Construction Management, 10.1080/15623599.2018.1452098,2018.

[3] A.R. Hadadian, Ali Rasoulian “Using Analytic Hierarchy Process (AHP) for Selecting the Appropriate Country for Economic Integration (Case of Iran’s Foreign Trade with OIC Countries)” International Research Journal of Finance and Economics ISSN 1450-2887 Issue 162 July, 2017.

[4] Masaki Yumoto “Decision Support Method with AHP According to Similar Preference”

Volume100, Issue5, Pages 51–61, 2017.

[5] Hua Liu, Fei Qi (2017) “Analytic hierarchy process based judgment model of highly cited papers in journal” IEEE 2nd International Conference on Big Data Analysis, IEEE Catalog Number: ISBN: CFP17TPE-POD 978-1-5090- 3620-2, (ICBDA 2017).

[6] Zheng-Yun Zhuang1 , I-Jen Chiang1 , Chia- Rong Su2 and Chih-Yung Chen “Modelling the decision of paper shredder selection using analytic hierarchy process and graph theory and matrix approach” Sage Journal, Volume: 9 issue: 12, 2017.

,

[7] Žarko Rađenović, Ivana Veselinović,

“Integrated ahp-topsis method for the assessment of health management information systems efficiency” DOI 10.1515/ethemes,2017.

[8] Athanasios Kolios 1,*, Varvara Mytilinou 1 , Estivaliz Lozano-Minguez 2 and Konstantinos Salonitis “A Comparative Study of Multiple- Criteria Decision-Making Methods under Stochastic Inputs”Volume 9,Issue 7, 2016.

(8)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

17

[9] Razvan Serbu 1 , Bogdan Marza 1 and Sorin Borza 2,* Sustainability “A Spatial Analytic Hierarchy Process for Identification of Water Pollution with GIS Software in an Eco-Economy Environment” Journal of Water Reuse and Desalination,Volume 8,Issue 11, 2016.

[10] Brijendra Singh “Analytical hierarchical process (ahp) and fuzzy ahp” International Journal of Pharmacy & Technology, Vol. 8 | Issue No.4 | 4925-4946, 2016.

[11] Haifeng Song “The Application Of Analytic Hierarchy Process In Supplier Selection For

Specialty Paper Making

Company”https://www.tritonia.fi/download/gradu/

6435, 2015.

[12] Bitarafan, Hosseini, Abazarrlou &

Mahmoudzadeh “Selecting The Optimal Composition Of Architectural Forms From The 57 Perspective Of Civil Defense Using Ahp And Ihwp Methods. Architectural Engineering & Design Management” Journal Architectural Engineering and Design Management Volume 11, 2015 - Issue 2, 2015.

[13] Abdullah & Zulkifli “Integration Of Fuzzy Ahp And Interval Type-2 Fuzzy Dematel: An Application To Human Resource Management”

Volume 42, Issue 9, 2015.

[14] Asakereh, M. Omid* , R. Alimardani And F.

Sarmadian, “Developing a GIS-based Fuzzy AHP Model for Selecting Solar Energy Sites in Shodirwan Region in Iran”International Journal Of Advanced Science And Technology Vol.68, pp 37- 48 (2014).

[15] Alireza Arabameri, “Application of the Analytic Hierarchy Process (AHP) for locating fire stations: Case Study Maku City”Merit Research Journal Of Art, Social Science And Humanities

(Issn: 2350-2258) Vol. 2(1) Pp. 001-010, January, 2014.

[16] Hong-Kyu Kwon1 And Kwang-Kyu Seo2* ,

“Analysis of Administration/Financial Measures (A/FM) Related Measures by Using Analytic Hierarchy Process (AHP)”International Journal Of Smart Home Vol.8, No.3, Pp.175-180, 2014.

[17] Shivani Sharma And Ravindra Pratap,

“A Case Study Of Risks Optimization Using Ahp Method” International Journal Of Scientific And Research Publications, Volume 3, Issue 10, October 2013.

[18] Susana Azevedo, Helena Carvalho, V. Cruz- Machado, "Using Interpretive Structural Modelling To Identify And Rank Performance Measures: An Application In The Automotive Supply Chain", Journal Of Management, Vol. 8 Iss: 2, Pp.208 – 230, 2013.

[19] P. Kousalya, G. Mahender Reddy,S.

Supraja , V. Shyam Prasad “Analytical Hierarchy Process approach – An application of engineering education” IOSR Journal of Engineering (IOSRJEN) ,Vol. 2, 2012, No. 10, 861 - 878.

[20] Goknur Arzu Akyuz And Turan Ermanerkan ,

" Supply Chain Performance Measurement: A Literaturereview." International Journal Of Production Research, Vol. 48, No. 17, 1 September 2010, 5137–5155, 2010.

[21] Galović, M. “Applying Of Ahp Methodology And Weighted Properties Method To The Selection Of Optimum Alternative Of Stock Material” Acta Technica Corviniensis – Bulletin Of Engineering, 2009.

(9)

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2018, All rights reserved

18

References

Related documents

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2014 All rights reserved.. An advance

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2014 All rights reserved.. SIMULATION

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2014 All rights reserved.. FPGA

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2014 All rights reserved.. FPGA

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2015 All rights reserved.. Comparison of

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2015 All rights

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2015 All rights

International Journal of Advanced Engineering Science and Technological Research (IJAESTR) ISSN: 2321-1202, www.aestjournal.org @2016 All rights