Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Martin English'14/'15
thru'18/'19
Department Police Department (PD)
Description
To replace video cameras inside each patrol car over the next three years Project #
0064
Priority
Justification
Video cameras inside the patrol cars are becoming obsolete and irreparable. The new cameras will use the latest technology and allow mobile downloads.
Budget Impact/Other
Useful Life
Project Name
In-Car Video Cameras
Category Technology-HardwareType Equipment
Total Project Cost: $90,900 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
90,900 90,900
Equip/Vehicles/Furnishings
90,900 90,900
Total
Thursday, November 06, 2014 Page 1
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Chuck Atkinson'14/'15
thru'18/'19
Department Police Department (PD)
Description
Project #
0065
Priority
Justification
The police department facility is approximately 15 years old. Some of the equipment is the original equipment, such as the some of the HVAC units and plumbing. This equipment is beginning to deteriorate and needs to be replaced. The requested monies will not replace the major equipment. It will only cover the cost to phase in the equipment over time.
Budget Impact/Other
Useful Life
Project Name
Building Infrastructure/Maintenance (PD)
Category Building ImprovementsType Improvement
Total Project Cost: $80,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
80,000 80,000
Equip/Vehicles/Furnishings
80,000 80,000
Total
Thursday, November 06, 2014 Page 2
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Joe Cooley'14/'15
thru'18/'19
Department Planning & Zoning (PZ)
Description
The Georgia Dept of Community Affairs extended the Qualified Local Govt (OLG) status of Doraville until Oc. 31, 2016. . Due to the time involved and review period required by ARC it is recommended that the City's effort begin no later than than July 2015. RFPs should have gone out and selection made by July 2015.
Project #
0066
Priority
Justification
In order to retain OLG status the City must update the Comp Plan. OLG status is required to obtain state funds. A letter from ARC is attached along with some preliminary very broad cost estimates from Caleb Racicot with TSW.
It has been 10 years since the 2005 comprehensive plan was adopted. Since adoption, our city has changed in population, we have weathered the great recession, might be on the verge of redeveloping a considerable portion of the city and have annexed potentially 3 geographic areas. We need a new base line to determine where are as a city, where we want to be as a city, and how to get there. ~Robert Patrick
Budget Impact/Other
Useful Life
Project Name
Comprehensive Plan Update/UDO
Category UnassignedType Unassigned
Total Project Cost: $250,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
250,000 125,000 125,000
Planning/Design
125,000 125,000 250,000
Total
Thursday, November 06, 2014 Page 3
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Corally Rivera'14/'15
thru'18/'19
Department Municipal Court (MC)
Description
Replacement of carpet throughout courthouse (Main hallway, three courtrooms, administrative office area, back computer/copy room) Project #
0067
Priority
Justification
Current carpet is worn, old, and has bad odor.
Budget Impact/Other
Useful Life
Project Name
Courthouse Carpeting
Category Building ImprovementsType Unassigned
Total Project Cost: $7,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
7,000 7,000
Equip/Vehicles/Furnishings
7,000 7,000
Total
Thursday, November 06, 2014 Page 4
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Corally Rivera'14/'15
thru'18/'19
Department Municipal Court (MC)
Description
Tear down wall between Courtroom #2 and #3, allowing for one big space for the courtroom. Rewire electrical utlets, light switches, thermostats, etc. Patch up wall where needed and paint walls. Relocate judges bench and bar.
Project #
0068
Priority
Justification
By increasing the size of the courtroom, we will improve the flow of defendant traffic during court to allow everyone to receive/hear the judges instructions at the same time, including being informed of their rights.
Budget Impact/Other
This should be a one-time expenditure. Once completed, no additional monies should be required.
Useful Life
Project Name
Court Building Renovations
Category Building ImprovementsType Improvement
Total Project Cost: $10,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
10,000 10,000
Construction/Maintenance
10,000 10,000
Total
Thursday, November 06, 2014 Page 5
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Corally Rivera'14/'15
thru'18/'19
Department Municipal Court (MC)
Description
Keyless entry to lobby door, cashroom door and main administrative office doors.
Project #
0069
Priority
Justification
Allow Clerk in cashroom to open lobby door for visitors without having to get up from desk and come out of cashroom. Provide better security for cash room and administrative office areas.
Budget Impact/Other
Useful Life
Project Name
Keyless Entry System for Court
Category UnassignedType Technology
Total Project Cost: $5,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
5,000 5,000
Equip/Vehicles/Furnishings
5,000 5,000
Total
Thursday, November 06, 2014 Page 6
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Corally Rivera'14/'15
thru'18/'19
Department Municipal Court (MC)
Description
Replace tiles in both women's and men's bathrooms.
Project #
0070
Priority
Justification
There are missing tiles and broken tiles in both bathrooms and floor is not level., both of which cause a hazard to our patrons and employees.
Budget Impact/Other
Useful Life
Project Name
Retiling Bathroom Floors
Category UnassignedType Unassigned
Total Project Cost: $5,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
5,000 5,000
Construction/Maintenance
5,000 5,000
Total
Thursday, November 06, 2014 Page 7
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact'14/'15
thru'18/'19
Department Parks & Recreation (PR)
Description
Renovate basement and generally spruce up the interior of the Civic Center building.
Project #
0071
Priority
Justification
With basement utilization - presently there is unusable space at this facility. With minimal up-grades, this facility could be used for additional meeting space, offices, employee wellness/exercise, etc.
Budget Impact/Other
Useful Life
Project Name
Civic Center Renovation
Category Building ImprovementsType Improvement
Total Project Cost: $25,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
25,000
20,000 5,000
Construction/Maintenance
20,000 5,000 25,000
Total
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Funding Sources
20,000 20,000
HOST
20,000 20,000
Total
Thursday, November 06, 2014 Page 8
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Lisa Ferguson'14/'15
thru'18/'19
Department General Administration (GA)
Description
To have the City's records scanned and indexed by an outside vendor to expedite the process. After the records have been indexed, they will also be shredded by an outside vendor.
Project #
0072
Priority
Justification
Expediting the digitization of the City's documents will result in better, quicker responses to requests for information. It will also ensure that records can be found in a timely manner and that information stored in paper records is not lost due to deterioration.. City staff will review the City's records and make a determination based on the state's retention schedule as to whether the document will be scanned and saved or simply shredded.
Once the pertinent documents have been scanned and indexed, paper documents will need to be disposed of appropriately. This means that some records will be maintained in both paper and digital form in order to comply with legal requirements. The remainder cannot simply be thrown away without exposing the City to some liability with respect to personal information that may be contained therein.
Budget Impact/Other
Useful Life
Project Name
Digitization/Disposal of City Records
Category UnassignedType Unassigned
Total Project Cost: $100,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
100,000 100,000
Other
100,000 100,000
Total
Thursday, November 06, 2014 Page 9
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Rip Robertson'14/'15
thru'18/'19
Department Public Works (PW)
Description
To provide trash cans and benches at bus stops.
(need pricing info) Project #
0073
Priority
Justification
Help beautify city/streetscapes; safety and cleanliness.
Budget Impact/Other
Useful Life
Project Name
MARTA Benches & Trash Receptacles
Category Equipment: MiscellaneousType Equipment
Total Project Cost: $25,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
25,000 25,000
Equip/Vehicles/Furnishings
25,000 25,000
Total
Thursday, November 06, 2014 Page 10
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Rip Robertson'14/'15
thru'18/'19
Department Public Works (PW)
Description
This is to replace all existing split rail fencing, city-wide.
Project #
0074
Priority
Justification
The existing fencing is deteriorating and requires a lot of repair work. In certain areas, such as behind the Civic Center, the fencing is a safety issue.
Budget Impact/Other
$17,500 for 15/16; $12,500 for 16/17; $10K for 17/18. This is to replace all existing split rail fencing, city-wide.
Useful Life
Project Name
Replace Fencing/Railings
Category UnassignedType Unassigned
Total Project Cost: $40,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
40,000 40,000
Construction/Maintenance
40,000 40,000
Total
Thursday, November 06, 2014 Page 11
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact'14/'15
thru'18/'19
Department Parks & Recreation (PR)
Description
No description was provided.
Project #
0075
Priority
Justification
No justification was provided.
Budget Impact/Other
Useful Life
Project Name
Brook Park Renovations
Category UnassignedType Unassigned
Total Project Cost: $175,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
175,000 175,000
Construction/Maintenance
175,000 175,000
Total
Thursday, November 06, 2014 Page 12
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Martin English'14/'15
thru'18/'19
Department Information Technology (IT)
Description
Laptops and printers for existing and new officers. We also need some loaner laptops and printers that officers can use while their equipment is being worked on
8 X Latitude E6430 ATG
8 X Brother Pocket Jet Printers and housing 4 X car mounts
Project #
0076
Priority
Justification
The current number of new laptops is only sufficent for 22 officers. We need to purchase to allow for growth and loaners if machines are being worked on
Budget Impact/Other
Useful Life
Project Name
Field Operations Equipment Replacements
Category UnassignedType Unassigned
Total Project Cost: $30,600 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
30,600 30,600
Equip/Vehicles/Furnishings
30,600 30,600
Total
Thursday, November 06, 2014 Page 13
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Martin English'14/'15
thru'18/'19
Department Information Technology (IT)
Description
Updates to audio and desktop instructor computer
1 X OptiPlex 7010 MT Tower with Office 1 X Training Room Audio / Video System
Project #
0077
Priority
Justification
Budget Impact/Other
Useful Life
Project Name
Training Room Equipment Upgrades
Category UnassignedType Unassigned
Total Project Cost: $11,300 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
11,300 11,300
Equip/Vehicles/Furnishings
11,300 11,300
Total
Thursday, November 06, 2014 Page 14
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Martin English'14/'15
thru'18/'19
Department Information Technology (IT)
Description
Install new wiring throughout the jail and Police Department facility. Replace existing video recording servers with stand-alone digital video recording system that has archiving capabilities
to maintain state requirement Coax Cable
4 X DVR Hardware
5 X Replacement IP Cameras Cable Management Hardware Cat 6 cable
Cat 6 Connectors Project #
0078
Priority
Justification
There are currently 2 Dell servers that have been running Video Insight’s digital recording solution since March 2007. These servers are past due on replacement, and could stop working any day now. Chris and I already had to run around looking for spare parts online when one of the boards on the one server failed a couple months ago.
Budget Impact/Other
Useful Life
Project Name
Video Management and Wiring Replacement
Category UnassignedType Unassigned
Total Project Cost: $30,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
30,000 30,000
Equip/Vehicles/Furnishings
30,000 30,000
Total
Thursday, November 06, 2014 Page 15
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Video cameras for patrol officers Project #
0079
Priority
Justification
With prevalence of video cameras and the level of scrutiny police officers routinely operate under, I believe we should consider the need for this system. We should also see if there are any insurance benefits to having our officers equipped with this to off set the system cost.
Budget Impact/Other
Estimates in the media range from $300.00 to $900.00 per officer. There may also be additional IT infrastructure costs.
The estimated expenditure currently does not include any additional IT infrastructure costs or software to manage the video feeds.
Useful Life
Project Name
Video Cameras for Officers
Category UnassignedType Unassigned
Total Project Cost: $45,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
45,000 45,000
Equip/Vehicles/Furnishings
45,000 45,000
Total
Thursday, November 06, 2014 Page 16
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Video cameras stationed at major intersections to our neighborhoods and business sections.
Project #
0080
Priority
Justification
Although we did rank within the top 50 safest cities in Georgia, there have been incidents of crime that I believe could be deterred with this system.
Budget Impact/Other
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost.
Useful Life
Project Name
Video Cameras for Major Intersections
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Equip/Vehicles/Furnishings
1 1
Total
Thursday, November 06, 2014 Page 17
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Prepare a RFP or RFQ for an assessment of our current zoning ordinance to determine if it 1) effectively represents the economic activities in the metro area that we want in our city, 2) accurately reflects the built environment and activities in the annexation areas and 3) can attract new desirable businesses to our city. In addition to assessing our current code, suggested modifications, including detailed specific language, should be prepared and explained to the council. At least 3 public discussions should be included for the residents and businesses to charter Doraville's future together.
Project #
0081
Priority
Justification
With the adoption of the LCC, the potential redevelopment of a large portion of our City and annexation of commercial, industrial, single family and multi-family housing, we need to reassess the effectiveness of our zoning ordinance to attract the most desirable business models, such as IT, medical research, small business start ups and perhaps new manufacturing, while making sure that we encourage existing desirable business models to stay in Doraville and thrive. We also need to reassess the zoning ordinance to determine if our existing house stock can attract various age and income levels to attract the most capable people to live in Doraville.
Budget Impact/Other
$100,000.00 estimated budget impact with potential partial funding from the ARC.
Useful Life
Project Name
Zoning Ordinance Assessment/Modification
Category UnassignedType Unassigned
Total Project Cost: $100,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
100,000 100,000
Other
100,000 100,000
Total
Thursday, November 06, 2014 Page 18
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Citywide rights of way beautification and landscape policy.
Project #
0082
Priority
Justification
As the council is contemplating out sourcing maintenance of our rights of way (ROW), now maybe the time to discuss a beautification and landscape policy. Perhaps we consider lighting effects for the I-85 interchange similar to what Tampa does for it's bridges or simply the
installation of attractive low maintenance plantings. In conjunction with the CIP wayfinding program (citywide signage) I believe this would be an opportunity to begin redefining the way most people perceive Doraville.
Budget Impact/Other No estimate.
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost.
Useful Life
Project Name
Citywide ROW Landscape Policy
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Planning/Design
1 1
Total
Thursday, November 06, 2014 Page 19
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Initiate a citywide wifi system relying on our existing rights of way.
Project #
0083
Priority
Justification
In order for Doraville to stake out a competitive edge for residents and businesses over the surrounding cities, we should contemplate either starting our own system or see if there are private sector businesses that can help us. Perhaps we could work with the Board of Education to provide access to the internet at home for those with children that live and/or attend school in our city limits. With this in place, it could also provide the back bone for video security in our parks and sidewalks. This system could render the need for any new cell towers in our city irrelevant.
Budget Impact/Other
No estimate; costs could be defrayed by partnering with other private or public organizations.
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost.
Useful Life
Project Name
Citywide WiFi
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Equip/Vehicles/Furnishings
1 1
Total
Thursday, November 06, 2014 Page 20
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Contract for a citywide traffic counting system. I believe we should prepare for every street to be done in the first year and then 20 percent of our roads each year thereafter.
Project #
0084
Priority
Justification
Although GDOT does provide a citywide state of road quality report, it does not tell us what roads have the highest traffic volume. Knowing which roads have the highest traffic volume (residential and non residential) combined with the road quality can help the council determine the most effective use of tax payer dollars.
Budget Impact/Other No estimate.
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost.
Useful Life
Project Name
Citywide Traffic Count Policy
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Planning/Design
1 1
Total
Thursday, November 06, 2014 Page 21
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Develop a citywide traffic and parking study to identify traffic and parking patterns to protect existing residential neighborhoods and aide commerce within our city limits. Specific study areas would include roads through our neighborhoods (Tilly Mill, Chestnut, Oakcliff, etc.,)
Project #
0085
Priority
Justification
With the possible redevelopment of the GM Site and surrounding areas, plus the potential of additional annexed territories, the City needs to begin planning on our transportation infrastruce needs and possible funding sources.
Budget Impact/Other No estimate.
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost.
Useful Life
Project Name
Citywide Traffic Study
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Planning/Design
1 1
Total
Thursday, November 06, 2014 Page 22
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
A GIS system similar to Gwinnett County's Public Access GIS.
Here is a link to Gwinnett’s GIS:
http://www.gwinnettcounty.com/portal/gwinnett/Departments/InformationTechnologyServices/GeographicInformationSystems/GISDataBrowser Project #
0086
Priority
Justification
A public access GIS system would provide developers, businesses and future home owners access to critical data about the topography, public infrastructure, existing buildings, etc., about our City and encourage them to move here. As this could be potentially expensive, I believe this is something we should consider partnering with Brookhaven, Dunwoody, Chamblee and perhaps the future cities on the other side of I85.
Budget Impact/Other No estimate provided
Expenditure data was not provided. The $1 place holder is required to make the project show up on reports. The expenditure data will be updated once we have a ballpark estimate of the cost. We have requested an estimate of the cost from Clark Patterson Lee but have not received it yet (11/4/2014).
Useful Life
Project Name
Public Access GIS
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Equip/Vehicles/Furnishings
1 1
Total
Thursday, November 06, 2014 Page 23
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Robert Patrick'14/'15
thru'18/'19
Department City Council (CC)
Description
Bury Overhead Power Lines Project #
0087
Priority
Justification
Assuming Council pursues the Parks and Walkability Master Plan, preparing a plan and resources to bury power lines in conjunction with the installation of new sidewalks would increase the curb appeal of our residential districts.
Budget Impact/Other
Useful Life
Project Name
Bury Overhead Power lines
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Other
1 1
Total
Thursday, November 06, 2014 Page 24
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact Rodney Brinkley'14/'15
thru'18/'19
Department Police Department (PD)
Description
Project #
0088
Priority
Justification
Motorola is upgrading the system and in several years our radios will be obsolete unless we begin replacing the radios. The radios are both vehicle mounted and portable
Budget Impact/Other
Useful Life
Project Name
Radio System Upgrade
Category UnassignedType Unassigned
Total Project Cost: $425,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
425,000 425,000
Equip/Vehicles/Furnishings
425,000 425,000
Total
Thursday, November 06, 2014 Page 25
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact'14/'15
thru'18/'19
Department Facilities & Buildings (FB)
Description
To provide for the demolition of the Star Towers property Project #
0089
Priority
Justification
Budget Impact/Other
Useful Life
Project Name
Star Towers Demo
Category UnassignedType Unassigned
Total Project Cost: $250,000 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
250,000 250,000
Other
250,000 250,000
Total
Thursday, November 06, 2014 Page 26
Capital Improvement Plan -In Progress
City of Doraville, Georgia
Contact'14/'15
thru'18/'19
Department Facilities & Buildings (FB)
Description
Project #
0090
Priority
Justification
Budget Impact/Other
No budget estimate was provided. The $1 in the budget is required so that the project will show up in the reports. The figure will be updated once we have better cost estimates.
Useful Life
Project Name
Tornado Siren
Category UnassignedType Unassigned
Total Project Cost: $1 Status Active
Total '14/'15 '15/'16 '16/'17 '17/'18 '18/'19
Expenditures
1 1
Other
1 1
Total
Thursday, November 06, 2014 Page 27