• No results found

The Public Water Supply Protection Value of Forests: A Watershed Scale Ecosystem Services Analysis Based upon Total Organic Carbon

N/A
N/A
Protected

Academic year: 2020

Share "The Public Water Supply Protection Value of Forests: A Watershed Scale Ecosystem Services Analysis Based upon Total Organic Carbon"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Studies reporting ecosystem services related to the provision of fresh water
Figure 2. Forest to urban land conversion in the Converse Wa- tershed from 1990 to 2020 by subwatershed
Table 3. Median total nitrogen (TN), total phosphorus (TP) and total organic carbon (TOC) concentrations using daily si- mulated data at the drinking water intake on Converse Reservoir, AL, 1992 to 2005 (n = 4292 days)
Table 4. Daily mean powdered activated carbon (PAC) treatment cost by land use scenarios between May and October, Con- verse Reservoir, AL

References

Related documents

The results of the bottom-up cost approximation (elasticity of substitution σ, value share parameter θ, reference output ¯ Q, and reference marginal cost ˆ c) can be implemented into

Three different CREs families were only represented in the promoter region of genotypes from cluster VI: a heat shock promoter element (HSE); a low-temperature-responsive

Despite significant progress in understanding hurricane evacuation behavior, considerable gaps remain for wildfires. First, the lack of revealed preference studies

In May 2008, the Eni companies also challenged with the Regional Court of Catania, requesting the suspension of administrative act effectiveness, certain decisions of

• 12 accredited bioethanol producers with total production capacity of 380.50 MLPY as of end 2020, equivalent to about 50% of volume requirement for E10

27.. From FY 2007 through FY 2010, revenue from parking-meter fees increased almost $1 million, while revenue from parking fines decreased by almost $2.6 million. Though

The main issues to be considered in this questionnaire are: how to ensure non-discriminatory access to meter data; an overview of existing cost-benefit analysis; minimum

Most campsites only accept very large vehicles with advanced bookings and we insist that you discuss access and pitch availability with campsite staff before arrival.. (