• No results found

Combined flow based imaging assessment of optimal cardiac resynchronization therapy pacing vector: a case report

N/A
N/A
Protected

Academic year: 2020

Share "Combined flow based imaging assessment of optimal cardiac resynchronization therapy pacing vector: a case report"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 acardiomyopathy,ECG Twelve-lead electrocardiogram showing the wide native QRS complex (145 ms) with first-degree atrioventricular block (PR 280 ms).b Two-dimensional color transthoracic echocardiogram apical four-chamber view
Fig. 2 Left anterior oblique chest X-ray view displaying the left ventricular quadripolar lead (arrow)
Fig. 3 Quantitative analysis (to compare with the results of analysis represented in Fig.Changes in electrical activation settings modify the orientation of intraventricular forces during acute study
Fig. 4 Quantitative analysis (to compare with the results of analysis represented in Fig
+4

References

Related documents

In view of the above problems, one high thermostable elasto-toughness latex cement slurry system has been developed using selected anti-gas channeling agent,

It has been observed that during rainfall in (2011) water level become high and due to unsatisfactory drainage system water becomes stopped in streets on roads, as

Measurements obtained from coronal sections; MCW — the width of the mandibular condyle; CONL-MF — the distance in be- tween the mandibular fossa and medial end of the

The observation of the study resulted that maximum carbon sequestration obtained by Eucalyptus hybrid (31.56 kg C/tree/year) compared to other two species whereas below

Correlation and Regression Analysis of Relevant Indicators, Intangible Assets and Operating Income: Firstly, a correlation analysis was carried out on the four asset

If the Communicator is unable to interrogate the implanted device or if the Communicator is unable to contact the LATITUDE NXT server to upload data, up to two weeks may elapse

Use a Formal / standard process for project and functionality costing used to determine project cost yes Use a Formal / standard risk management methodology used to manage project

Energy and food security in the context of biomass, crop production and soil quality in Uganda.. Nataliya Apanovich Iowa