• No results found

Comparisons of Individual and Group Replacement Policies for a Two machine Series System

N/A
N/A
Protected

Academic year: 2020

Share "Comparisons of Individual and Group Replacement Policies for a Two machine Series System"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1.. Optimal individual and group replacement policies under u1≈u2

References

Related documents

During the term of this Agreement, SaskTel will provide on-site support for all SaskTel owned equipment (including, at SaskTel's option, repair or replacement of equipment that

For example: If the work is for installing anchor bolts, plates and/or straps to improve the connection of the house to the foundation, but is not based on an

Relative position measurements enable a Laplacian feedback controller to maintain the robots in an arbitrary desired formation, and odor measurements are exchanged and used to drive

These optimal delay values change as a function of frequency, and in the best case (e.g. This means that the feasibility of increasing the received power of a transponder based

Up until 10% noise level, SUSAN edge detector managed to extract edges although a lot of noise pixels are presented in resulting image. Both Sobel and Prewitt resulted in

En el presente artículo investigamos la validez de tres conceptos que han influido en el estudio de los antropomorfos del arte paleolítico. Mediante el análisis histórico

Comparison between Linear and Non-Linear Time History Analyses of Base-Isolated Structures Comparison of the Response of Base-Isolated Structures by using Biaxial and

Schedule maintenance when mechanical or operational conditions are indicated Repair or replacement of equipment usually. prior to