• No results found

1. Optimal method for pitch period estimation in scilab.

N/A
N/A
Protected

Academic year: 2020

Share "1. Optimal method for pitch period estimation in scilab."

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

Modular configuration - combined with the increased technological complexity of vehicles and parts - implies stronger cooperation in design and engineering activities with

The objective of this research is to provide a better understanding of process variation and its impact on firm performance by using data from the retail banking study undertaken at

Ifølge Gerdrup, Hammarsland, og Naug (2006), vil høyere produksjonsvekst isolert sett kunne føre til en økning i pengemengde. Grunnen til dette er det stigende

The systems of public and private finance and international financial markets interact with one another, connecting the managed-systems of a government and its central bank to

These infrastructure indices: the electricity index, the transportation index, telecommunications index, and a combined transport and telecommunications index are used in order

During the critical Encoding/Maintenance period, activity on trials with the highest level of accuracy (3 or 4 correct) is higher than trials with lower levels of accuracy.

The most significant results were found in the short-term studies, as there were multiple strong correlations between the baseline and the change of feature value after the drug..

activities for children and young people between the ages of 6 and 20 years, extracurricular education and workshops, as well as intercultural encounters and projects for